- Summary. - Survey site. - Electrical works................................................................1 o DESCRIPTION OF OPERATION................................1-1 o The Hybrid system equipments.............................1-2 o Management Controlling......................................1-3 o Battery charging and discharging process..............1-4 o System Architecture.............................................1-6. o Drawings...............................................................1-7 - Solar System Calculations and Analyses............................2 - Civilizations works o Drawings.................................................................3 - Technical specifications....................................................4 o Schedule of Technical Data for PV Solar Panel...... ..4-1 o Schedule of Technical Data for Charge Controller....4-2 o Schedule of Technical Data for Batteries..................4-3 Summary - SAM AMER company is pleased to submit to MTN Yemen our solutions in solar energy systems for OPEX Reduction for BTS Sites. - We offer a turnkey solar energy solutions can be integrated to operator sites which based on a diesel generator (DG) and that help operators to reduce the energy consumption of their BTS sites, - Based on information, volume indications and various discussions with MTN as well as performing a Site Survey at the actual trial site we are providing our proposal of scope of work only for MTN Yemen. - This technical proposal is tailored to a specific MTN site surveyed by General Tech Expert engineer on September th14 , 2019.
Site Survey
The break even calculation was based on the following assumptions:
3 x microwave mini link Peak Radio equipments load :
6 x TRX ( 3 Sectors) 25A/-48V
3 x installed rec fiers
~ 100 A / -48 V DC
3-phase 13 KVA Diesel Generator
An automatic transfer switch (ATS)
1- Attached file " Electrical works.pdf"
2- Attached file "Solar System Calculations and Analyses.pdf"