• Assume 40-hour weeks and an hourly wage of $12.


• Overhead is 1.5 times weekly labor cost.
• Material cost is $6 per pound.

Week Output (units) Workers Material (lbs)


1 30,000 6 450
2 33,600 7 470

P65 Problem Question #3


• Compute the multifactor productivity measure for each of the weeks sho
for production of chocolate bars.
• Assume 40-hour weeks and an hourly wage of $12.
• Overhead is 1.5 times weekly labor cost.
• Material cost is $6 per pound.

Week Output (units) Workers Material (lbs)


1 30,000 6 450
https://www.coursehero.com/file/p1b1m8a/Assume-40-hour-weeks-and-an-hourly-wage-of-12-Overhead-is-15-times-weekly-labor/ 1/7
12/03/2020
1 30,000 6 450
Assume 40 hour weeks and an hourly wage of 12 Overhead is 15 times weekly labor

2 33,600
Find study resources 7 470 🔍 싂

Week 1:
= 30,000 / (40*12*6) + [(40*12*6)*1.5] + (450*6) = 30,000 / 9900 = 3.030303

Week 2:
= 33,600 / (40*12*7) + [(40*12*7)*1.5] + (470*6) = 33,600 / 11220 = 2.994652

P65 Problem Question #4


• A company that makes shopping carts for supermarkets and other stores
recently purchased some new equipment that reduces the labor content
the jobs needed to produce the shopping carts.
• (OLD SYSTEM): Prior to buying the new equipment, the company used 5
workers, who produced an average of 80 carts per hour. Workers receive
per hour, and machine cost was $40 per hour.
• (NEW SYSTEM): With the new equipment, it was possible to transfer one
the workers to another department, and equipment cost increased by $1
per hour while output increased by 4 carts per hour.

• COMPUTE the multifactor productivity under EACH system (OLD & NEW)
carts per dollar cost (labor plus equipment ) as the measure.

• Comment on the changes in productivity according to the two measures.

P65 Problem Question #4


https://www.coursehero.com/file/p1b1m8a/Assume-40-hour-weeks-and-an-hourly-wage-of-12-Overhead-is-15-times-weekly-labor/ 2/7
12/03/2020
P65 Problem Question #4
Assume 40 hour weeks and an hourly wage of 12 Overhead is 15 times weekly labor

Find study resources 🔍 싂


• (OLD SYSTEM): Prior to buying the new equipment, the company used 5
workers, who produced an average of 80 carts per hour. Workers receive
per hour, and machine cost was $40 per hour.
• (NEW SYSTEM): With the new equipment, it was possible to transfer one
the workers to another department, and equipment cost increased by $1
per hour while output increased by 4 carts per hour.

OLD SYSTEM:
= 80 / [(5*10) + 40] = 80 / 90 = 0.888889 cart per dollar

NEW SYSTEM:
= 84 / [(4*10) + 50] = 84 / 90 = 0.933333 cart per dollar

New SYSTEM > OLD SYSTEM

Questions?

https://www.coursehero.com/file/p1b1m8a/Assume-40-hour-weeks-and-an-hourly-wage-of-12-Overhead-is-15-times-weekly-labor/ 3/7
12/03/2020 Assume 40 hour weeks and an hourly wage of 12 Overhead is 15 times weekly labor

Find study resources


You've reached the end of your free preview. 🔍 싂
Want to read all 8 pages?

Subscribe to unlock

TERM PROFESSOR TAGS


Spring '08 Dumond Management, Multifactor Productivity

Twitter Email URL Report

Icon Icon Icon

Most Popular Documents for MGMT 339

11 pages 29 pages

MGMT 339 Semester Notes Costs preventing defects from occurring


Training research quality improvement
California State University, Fullerton
MGMT 339 - Spring 2015 California State University, Fullerton
MGMT 339 - Spring 2015

30 pages 21 pages

Low material handling cost per unit High The Retail Customer Dissatisfaction Study
degree of labor and equipment 2006 by the Verde Group What

California State University, Fullerton California State University, Fullerton


MGMT 339 - Spring 2015 MGMT 339 - Spring 2015

https://www.coursehero.com/file/p1b1m8a/Assume-40-hour-weeks-and-an-hourly-wage-of-12-Overhead-is-15-times-weekly-labor/ 4/7
12/03/2020 Assume 40 hour weeks and an hourly wage of 12 Overhead is 15 times weekly labor

29 pages 3 pages
Find study resources 🔍 싂

Examples Adaptive culture Total quality Very high volume very low none variety
management Employee self control Focus highly standardized Technology

California State University, Fullerton California State University, Fullerton


MGMT 339 - Spring 2015 MGMT 339 - Spring 2015

View more

Other Related Materials

5 pages 14 pages 5 pages 2 pages

With the new Example 3 Crew Size MAN3506 HW Chapter 1 Probl


equipment it was The manager of carpet CHAPTER 2 set 3
possible to transfer store is trying to Florida Atlantic Univers… University of Mic
one of the workers to determine the best MAN 3506 - Fall 2014 OPERATIONS 2
Salem International Uni… Zagazig University Fall 2013
BUS 202 - Fall 2018 BUSINSS AD 301 -
Spring 2019

What students are saying

As a current student on this bumpy collegiate pathway, I stumbled upon Course Hero, where I can
find study resources for nearly all my courses, get online help from tutors 24/7, and even share my
old projects, papers, and lecture notes with other students.

Kiran
Student
https://www.coursehero.com/file/p1b1m8a/Assume-40-hour-weeks-and-an-hourly-wage-of-12-Overhead-is-15-times-weekly-labor/ 5/7
12/03/2020 Assume 40 hour weeks and an hourly wage of 12 Overhead is 15 times weekly labor

Temple University Fox School of Business ‘17, Course Hero Intern


Picture
Find study resources 🔍 싂
I cannot even describe how much Course Hero helped me this summer. It’s truly become something
I can always rely on and help me. In the end, I was not only able to survive summer classes, but I
was able to thrive thanks to Course Hero.

Dana
Student University of Pennsylvania ‘17, Course Hero Intern

Picture

The ability to access any university’s resources through Course Hero proved invaluable in my case. I
was behind on Tulane coursework and actually used UCLA’s materials to help me move forward and
get everything together on time.

Jill
Student Tulane University ‘16, Course Hero Intern

Picture

SSL site seal Better Business Bureau accredited business TRUSTe

Company Get Course Hero

About Us iOS

Scholarships Android

Sitemap Educators

Standardized Tests

Education Summit

Careers Help

Leadership Contact Us

Careers FAQ

Legal Feedback

Copyright Policy Connect with Us

Academic Integrity College Life

Our Honor Code Facebook

Privacy Policy Twitter

Terms of Use LinkedIn

YouTube

Instagram

Copyright © 2020. Course Hero, Inc.

https://www.coursehero.com/file/p1b1m8a/Assume-40-hour-weeks-and-an-hourly-wage-of-12-Overhead-is-15-times-weekly-labor/ 6/7
12/03/2020 Assume 40 hour weeks and an hourly wage of 12 Overhead is 15 times weekly labor

Course Hero is not sponsored or endorsed by any college or university.


Find study resources 🔍 싂

https://www.coursehero.com/file/p1b1m8a/Assume-40-hour-weeks-and-an-hourly-wage-of-12-Overhead-is-15-times-weekly-labor/ 7/7

You might also like