You are on page 1of 16

ANNEX ( ) DESIGNS AND DRAWINGS.

PREPARED BY:

UNITED NATIONS OFFICE FOR PROJECT SERVICES


FUNDED BY:

PROJECT.

SUPPLY AND INSTALL OF HYBRID SOLAR SYSTEM FOR


SHAHID AL JANATI SCHOOL
AMRAN CITY-YEMEN
PROJECT REFERENCE NO.
IUS-OPS-ECS-AMR-003.5

JULY, 2019
REMARKS: - INSTALLING THE CABLE FEEDERS TO THESE BOARDS, CURRENT SYSTEMS & LOW VOLTAGE POWER CABLES IS
1.THE LAYOUT DRAWINGS DO NOT SHOW ALL THE SYSTEMS , HOOKING UP OF EQUIPMENT WILL BE THE SYSTEM SUPPLIER 300MM.
ITEMS, OR ACCESSORIES COVERED UNDER THE SCOPE OF RESPONSIBILITY. .23 THE MAXIMUM FILLING RATIO FOR POWER &
ELECTRICAL WORKS TO BE EXECUTED THE LAYOUT .10 CONDUCTORS FOR SINGLE PHASE SOCKETS OUTLETS COMMUNICATION CONDUITS IN SITE WORK ARE:
DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL CIRCUITS SHALL BE 4MM COPPER CONDUCTORS AND · MIN50. MMD FOR POWER CABLE WITH MAX 40%.
RELEVANT OR SPECIALIST DRAWINGS AND SPECIFICATIONS . PROTECTED BY 16A CIRCUIT BREAKERS UNLESS OTHERWISE OF CONDUIT CAPACITY.
2.DO NOT SCALE FROM THE LAYOUT DRAWINGS WORK INDICATED. · MIN50. MMD FOR LOW CURRENT SYSTEMS WITH
ACCORDING TO ARCHITECTURAL OR ELECTRICAL DETAILS .11 IN THE ABSENCE OF ANY INDICATION ON THE DRAWINGS MAX 40%. OF CONDUIT CAPACITY.
UNLESS OTHERWISE AUTHORIZED . OR THE SPECIFICATIONS, THE INSTALLATIONS SHALL BE .24 ALL C.BS WITH FRAME RATING LARGER THAN 100A
3.ALL EQUIPMENT LAYOUTS ARE PROVISIONAL . FINAL DONE TO THE SATISFACTION OF THE ENGINEER. SHOULD HAVE ADJUSTABLE THERMAL OVERLOAD SETTING.
LAYOUT SHALL BE DETERMINED BY THE CONTRACTOR FROM .12 THE CONTRACTOR SHALL PROVIDE ALL IRON ANGLES, .25 CONTRACTOR SHALL PROVIDE CONTROL CONDUIT &
THE CONSTRUCTION /SHOP DRAWINGS AND AFTER AND FIXING ACCESSORIES REQUIRED FOR COMPLETE WIRING AS PER OPERATIONAL REQUIREMENTS SHOWN ON
COORDINATION WITH OTHER TRADES . INSTALLATION OF LIGHTING FIXTURES, OUTLETS & ROUTES. HVAC AND PLUMBING DRAWING.
4.THE SIZE OF CONDUITS AND /OR CABLE TRAYS IS IN .13 FOR EXACT QUANTITY, TYPE & LOCATION OF ELECTRICAL .26 EXACT METHOD OF JOINING CABLE TRAYS,AND CABLE
GENERAL NOT SHOWN ON DRAWINGS . THE SIZE OF ALL OUTLETS REFER TO INTERIOR DESIGN DOCUMENT. TRUNKING SHALL BE IN ACCORDANCE WITH THE
CONDUITS AND/OR CABLE TRAYS SHALL BE SELECTED BY .14 THE CONTRACTOR SHALL BE RESPONSIBLE FOR RESPECTIVE MANUFACTURERS RECOMMENDATION USING
THE CONTRACTOR IN ACCORDANCE WITH BOQ , MODIFYING THE NO. OF CIRCUIT BREAKERS, RATING, AND PROPER COMPONENT.
REGULATIONS AND /OR STANDARDS AND WILL BE FUNCTION WIRING ACCORDING TO MANUFACTURER DATA WITHOUT .27 GROUNDING TO LOW CURRENT SYSTEMS SHALL BE
OF THE NUMBER AND SIZE OF THE RESPECTIVE ANY EXTRA COST. SEPARATE GROUNDING PIT AND CONNECTED TO BUILDING
CONDUCTORS. .15 ALL DISCONNECT SWITCHES FOR A/C SHALL BE GROUNDING NETWORK.
5.PERFORATED CABLE TRAY SHALL BE FIXED AND COVER ADJACENT TO THE UNIT.. .28 THE DISTANCE BETWEEN EARTH PIT SHALL BE DOUBLE
PROPERLY AND SHALL NOT FIXED DIRECT TO ROOF SLAB . .16 UNLESS OTHERWISE INDICATED MINIMUM SIZE CONDUIT; OR MORE THAN LENGTH OF EARTHING ROD.
6.TEARTH CONTINUITY CONDUCTORS ARE NOT INDICATED · FOR EXTERIOR INSTALLATION IS 25MM DIAMETER .29 THE CONTRACTOR SHOULD PROVIDE COMPLETE
ON THE DRAWINGS , BUT SHALL BE RUN WITH ALL CIRCUITS OR AS SHOWN IN PANEL SCHEDULE. CENTRAL INTERFACE BETWEEN THE SOLAR GENERATION
IN ACCORDANCE WITH SPECIFICATIONS , REGULATIONS · FOR INTERIOR INSTALLATION IS 25MM DIAMETER SYSTEM & GENERATOR SET.
AND/OR STANDARDS. OR AS SHOWN IN PANEL SCHEDULE. .30 THE DIMENSION OF ELECTRICAL PANELS AND
7.THE COLOR CODE FOR A FOUR WIRE CIRCUIT IS - ONE .17 CONTRACTOR SHALL PROVIDE MATCHING PLUG IN FOR EQUIPMENT'S SHALL BE AS PER APPROVED FABRICATOR /
BLACK, - ONE RED , ONE BLUE AND ONE YELLOW ANY ALL SPECIAL OUTLETS. SUPPLIER SHOP DRAWING.
CONDUCTOR INTENDED FOR GROUNDING PURPOSE SHALL .18 CONTRACTOR RESPONSIBLE FOR CHANGE ALL EXISTING .31 CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALL
BE GREEN WITH YELLOW STRIPE . FLORESCENT TUBE (T) 8LIGHT BY LED TUBE (T) 8INCLUDE SUITABLE VENTILATION SYSTEM IN BATTERY ROOM TO
8.CONTRACTOR RESPONSIBLE TO DISCONNECT ALL WIRING ALL OPERATION ACCESSORIES FOR ALL LIGHTING FIXTURES ASSURING REFRESHING AIR FLOW INSIDE ROOM .
IN EXISTING DISTRIBUTION BOARD AND RECONNECTED IN AS PER BOQ. .32 CONTRACTOR RESPONSIBLE TO DISTRIBUTE ALL
NEW DISTRIBUTION BOARD AS PER SINGLE LINE DIAGRAM . .19 LED LAMPS SHALL BE FURNISHED AND INSTALLED IN ALL DISTANCE BETWEEN ALL SYSTEM COMPONENTS INSIDE
9.THE CONTROL AND /OR SWITCHBOARDS FOR THE LIGHTING FIXTURES. BATTERY ROOM AS PER MANUFACTURE INSTALLATION
DIFFERENT SYSTEMS SUCH AS THE AIR CONDITIONING .20 ALL OUTDOOR WIRING ACCESSORIES SHALL BE WEATHER INSTRUCTION.
EQUIPMENT MACHINES , ....ETC . WILL BE IN THE SCOPE OF PROOF TYPE.
SUPPLY OF THE SYSTEM SUPPLIER . THE ELECTRICAL .21 FOR GROUND-FAULT CIRCUIT INTERRUPT (GFCI) REFER
CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING AND TO PLANS AND PANEL SCHEDULES.
.22 THE MINIMUM SEPARATE DISTANCE BETWEEN LOW

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:

SHAHID AL JANATI
DESIGNED BY:
A3 AS SHOWN OF ISSUE
MAIN REMARK IFA 13/7/19

S-00
PROJECT NO:
OPERATIONAL EXCELLENCE SCHOOL REVIEWED BY:
IUS-OPS-ECS-AMR-003.5
FOR RESULTS THAT MATTER. DRAWING TYPE: APPROVED BY: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRICAL PLAN UNOPS DESIGN REVIEW JULY /13/2019
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
1X1MTRS. PROMPTLY BEFORE PROCEEDING.
NEW SDB 4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING

100
100 ACCESSORIES SHALL BE WEATHER PROOF TYPE.
NEW SDB CABLE ROUTING
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
NEW UNDERGROUND
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
CABLE TRENCH 40CM(WIDTH)
AND 60CM (DEPTH)
INSTALLATION INSTRUCTION.
WATER PROOF
BOX 15CM X 15CM
CABLE TRAY

1X1MTRS.
WATER PROOF
BOX 15CM X 15CM MAIN DISTRIBUTION

100
100
MDB BOARD.
CABLE ROUTING

EMERGENCY MAIN
EMDB DISTRIBUTION BOARD.
NEW SDB

WATER PROOF WALL MOUNTED STREET


BOX 15CM X 15CM
LIGHT FIXTURE

AC COUPLING PANEL

NEW SDB

MTS MANUAL TRANSFER


SWITCH
CABLE ROUTING
CONNECTION BOX
BETWEEN CHARGE
CONTROLLER AND
BATTERY RACK

AC≈
DC= HYBRID INVERTER

MPPT BATTERY CHARGER


WATER PROOF WATER PROOF
BOX 15CM X 15CM BOX 15CM X 15CM
BATTERY RACK.
1X1MTRS.
CABLE ROUTING 100 100

100

100
OLD SDB
2 LAYER BATTERY RACK

NEW UNDERGROUND
CABLE TRENCH 40CM(WIDTH)
40 Cm

COUPLING
PANEL
AND 60CM (DEPTH)

AC
MTS EMDB
SDB
AC≈
DC =

60 Cm

30 Cm
5 Cm
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
NEW ELECTRICAL DISTRIBUTION TENDER DOCUMENTS.
UNOPS

S2-01
SHAHID AL JANATI SCHOOL PLAN
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
JULY /13/2019 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL OUTDOOR OUTLETS, SOCKET OR WIRING
ACCESSORIES SHALL BE WEATHER PROOF TYPE.
5. ALL DISTANCE BETWEEN SYSTEM COMPONENTS INSIDE
BATTERY ROOM TO BE DISTRIBUTE AS PER MANUFACTURE
INSTALLATION INSTRUCTION.

S&H D
CONNECTION BOX
BETWEEN CHARGE
CONTROLLER AND
BATTERY RACK

AC≈
HYBRID INVERTER
2 RACKS DC=

MPPT BATTERY CHARGER

BATTERY RACK.

COUPLING
PANEL
AC COUPLING PANEL
AC
EXHAUST FAN

BATTERY SMOKE & HEAT


S&H D
DETECTOR

FIRE EXTINGUISHER POWDER

FIRE EXTINGUISHER CO2


S&H D

AC≈
DC =

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
CONTROL ROOM TENDER DOCUMENTS.
UNOPS

S2-02
SHAHID AL JANATI SCHOOL
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
JULY /13/2019 1:4
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. ALL CABLE SHALL BE ROUTE IN PERFORATED GI
CABLE TRAY.
5. CABLE TRAY SHALL BE FIXED ABOVE UNISTRUT NOT
DIRECT IN ROOFTOP.

PHOTOVOLTAIC MODULE

+
_
DC-COMBINER
BOX-01 COMBINER BOX

SOLAR SINGLE CORE CABLE


1C X 6 SQ.MM (RED COLOR)

SOLAR SINGLE CORE CABLE


1C X 6 SQ.MM (BLACK COLOR)

SOLAR SINGLE CORE CABLE


1C X 35 SQ.MM (RED COLOR)

SOLAR SINGLE CORE CABLE


1C X 35 SQ.MM (BLACK
COLOR)

SWH SOLAR WATER HEATER

COMBINER BOX

100
FROM COMBINER BOX
TO CONTROL ROOM

50
GI CABLE TRAY
100MM * 50MM
CABLE TRAY DC-COMBINER
BOX-1

COLD FORMED STEEL


+

_
C CHANNEL

+
_
+
_

_
+

+
_
+
_
+

ANCHOR
_

SWH

_
+

+
BOLT

_
+
_
+

_
+
NOT TO SCALE.

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV MODULE DISTRIBUTION TENDER DOCUMENTS.
UNOPS

S2-03
SHAHID AL JANATI SCHOOL ROOFTOP PLAN DETAILS.
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY:UNOPS DESIGN REVIEW
JULY /13/2019 1:1
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. LIGHTNING ARRESTER SHALL BE INSTALL IN
SUITABLE LOCATION AND HEIGHT TO COVER ALL
ROOFTOP AREA.
5. ALL EACH PV STRINGS SHALL BE EARTHED
SEPARATELY UP TO EARTHING BUS BAR IN
ROOFTOP.

PHOTOVOLTAIC MODULE

+
_
DC-COMBINER
BOX-01 COMBINER BOX

EARTHING BUS BAR

EARTHING CABLE

LIGHTNING ARRESTOR

TO LIGHTNING
ARRESTER
1C*25 SQ.MM

TO EARTHING EARTHING
BUS BAR NO.2 BUS BAR NO.1
1C*16SQ.MM

LIGHTNING TO EARTHING EARTHING


PIT BUS BAR NO.2 PIT
1C*25SQ.MM

TO EARTHING FROM COMBINER BOX


PIT TO CONTROL ROOM
LIGHTNING ARRESTOR

CABLE TRAY
DC-COMBINER
BOX-1

TO EARTHING PIT

_
+
1C
*6SQ
.MM

_
+
_
1C
*6SQ

+
_ .MM

_
+

+
_
+
_
+
_

_
+

+
_
+
_
+

_
+
1C*10SQ.MM

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
PV STRINGS & COMBINER BOX TENDER DOCUMENTS.
UNOPS

S2-04
SHAHID AL JANATI SCHOOL EARTHING PLAN DETAILS.
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
JULY /13/2019 1:50
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. EARTHING PIT SHALL BE CARRY OUT AS BE SITE
ENGINEER INSTRUCTION.

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
EARTNING DETAILS. TENDER DOCUMENTS.
UNOPS

S2-05
SHAHID AL JANATI SCHOOL
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
JULY /13/2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

MANUAL CHANGE OVER

AC FUSE

CIRCUIT BREAKER
(MCCB/MCB)
HYBRID SOLAR SYSTEM INVERTER OUTPUT AC FUSE

MTS 100A

NEW EMDB

RCBO,
63A,300mA

40A, 2P 40A, 2P 40A, 2P 40A, 2P 25A, 2P 25A, 1P 20A, 1P 20A, 1P 16A, 1P 10A, 1P
MCB 10kA
MCB, MCB, 10kA MCB, 10kA MCB, 10kA MCB, 10kA MCB 10kA
MCB, MCB
MCB, 10kA MCB
MCB, 10kA MCB 10kA
MCB, MCB, 10kA
CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B CLASS B

SDB SDB SDB SDB SPARE SPARE SPARE SPARE SPARE OUTDOOR
LIGHTING

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SINGLE LINE TENDER DOCUMENTS.
UNOPS

S2-06
SHAHID AL JANATI SCHOOL DIAGRAM DETAILS.
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
JULY /13/2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

Inside View Front View Side View

40A , 10 kA 25A , 10 kA

40 A , 10 kA 20 A , 10 kA

40 A , 10 kA 20 A , 10 kA

40 A , 10 kA 16 A , 10 kA

25 A , 10 kA 10 A , 10 kA

50
E

ABB
DDA204 AC
In=0.3A

PUSH

RCBO
63A,300mA N

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
NEW EMDB BLOCK DIAGRAM TENDER DOCUMENTS.
UNOPS

S2-07
SHAHID AL JANATI SCHOOL
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
JULY /13/2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.

PV Module Combiner Box Battery Charger Hybrid INVERTER


2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
Connection UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

PHOTOVOLTAIC MODULE

+
_
DC =
AC≈
HYBRID INVERTER

MANUAL CHANGE OVER


Total: 0.99Kwp
3 PV MODULE
STR NO.1

_
+

MPPT BATTERY CHARGER


Total: 0.99Kwp
3 PV MODULE
STR NO.2

85A
SURGE ARRESTER
150 VDC
_
+

XPLE/PVC/CU1.0KV
3X6
4X6 SQ.mm

CIRCUIT BREAKER (MCB)


AC≈
Total: 0.99Kwp
3 PV MODULE

HYBRID SOLAR SYSTEM INVERTER OUTPUT


STR NO.3

DC =
_
+

CIRCUIT BREAKER (RCBO)


XPLE/PVC/CU1.0KV
3X6 SQ.mm
2(1x50 SQ.mm)
Total: 0.99Kwp
3 PV MODULE
STR NO.4

(RED& BLACK)

DC FUSE
_
+

2(1x35 SQ.mm)
(RED& BLACK)
POSITIVE & NEGATIVE
2(1x50 SQ.mm)
125A,2P
CONNECTION BOX
(RED& BLACK)

DC SWITCH ISOLATOR
Bus Bar 150A
Positive & Negative

2(1x50 SQ.mm)
(RED& BLACK)

125 A, 2P
Battery Rack

1x50 SQ.mm

24 Batteries
2V ,600 Ah
48 Volt

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
SOLAR SYSTEM SCHEMATIC TENDER DOCUMENTS.
UNOPS

S2-08
SHAHID AL JANATI SCHOOL DIAGRAM
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
SANA'A - YEMEN. Amran CITY-YEMEN ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
JULY /13/2019 AS SHOWEN.
1. ALL DIMENSIONS AND ELEVATIONS ARE IN
CENTIMETERS AND METERS RESPECTIVELY,
UNLESS OVER WISE MENTIONED.
2. ALL DIMENSIONS TO BE CHECKED AND CONFIRMED
ON SITE BEFORE COMMENCEMENT OF ANY WORK.
3. ANY DISCREPANCY TO BE REPORTED TO THE
UNOPS SITE ENGINEER/ PROJECT MANAGER
PROMPTLY BEFORE PROCEEDING.
4. NEW DISTRIBUTION BOARD SHALL BE INSTALL IN
THE SAME LOCATION OF EXISTING ONE.

Inside View Front View Side View MANUAL TRANSFER


SWITSH
SURGE ARRESTER

CIRCUIT BREAKER
(MCCB/MCB)

CIRCUIT BREAKER (RCB)

AC FUSE

25A , 10 kA 16A , 10 kA

25 A , 10 kA 16 A , 10 kA

25 A , 10 kA 10 A , 10 kA

20 A , 10 kA 10 A , 10 kA

20 A , 10 kA 6 A , 10 kA

20 A , 10 kA 6 A , 10 kA

50
E

ABB
DDA204 AC
In=0.3A

PUSH

RCBO
32A,300mA N

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: DESIGN BY: STATUS: NORTH: DRAWING NO:
NEW SDB SINGLE LINE DIAGRAM TENDER DOCUMENTS.
UNOPS

S2-09
SHAHID AL JANATI SCHOOL DETAILS.
CHECKED BY: PROJECT NO: PAPER SIZE:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5 A3.
FOR RESULTS THAT MATTER. WORLD BANK GROUP. PROJECT LOCATION: DRAWING TYPE: DATE: SCALE:
ELECTRIC PLANS. APPROVED BY: UNOPS DESIGN REVIEW
SANA'A - YEMEN. AMRAN CITY-YEMEN JUNLY 12 2019. AS SHOWEN.
PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
SHAHID AL JANATI 6PV MOUNTING ANCHOR DESIGNED BY: A3 1:1 OF ISSUE

BOLTS ROOFTOP PLAN IFA 13/7/19


SCHOOL PROJECT NO:

S2-10
REVIEWED BY:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5
FOR RESULTS THAT MATTER. DRAWING TYPE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW
DATE:
JULY /13/2019
GALV (L)
50x50x3
STAINLESS
STEEL BOLTS ∅8 3mm
E-70 Channel C 80x40x1.25
GROUT
A B

2400
GALVANIZED BASE
PLATE 200x150x4 mm
1.25

80
350
2 2

10
4∅ 10 ANCHOR
GALVANIZED CONCRETE BOLTS 40
C 80x40x1.25 14cm LENGTH
FOR ALL POSTS
350 Channel C 60x30x1.25

2900
2 BASE PLATE - PLAN
STRUCTURE DETAILS

60
1.25
4∅ 10 ANCHOR
CONCRETE BOLTS

30
14cm LENGTH CONCRETE WITH
GALVANIZED EPOXY GROUT
BASE PLATE
1 1 4 mm THICK
GALV (L)
50x50x3 MASTER
SEAL 470
ROOF TILES RSH 43 in DN

100
120
A B CEMENT
MORTAL 1.5mm
i n
EXISTING 3/4
MASTER FLOW ROOF SLAB
GROUT
932 AN(EPOXY)

1 ANCHOR BOLTS PLAN CONNECTION - SEC - DETAILS


STRUCTURE DETAILS 3 STRUCTURE DETAILS

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
SHAHID AL JANATI 6PV MOUNTING DESIGNED BY: A3 AS SHOWN OF ISSUE
IFA 13/7/19
SCHOOL ANCHOR BOLTS PLAN PROJECT NO:

S2-11
REVIEWED BY:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5
FOR RESULTS THAT MATTER. DRAWING TYPE: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW JULY /13/2019
A B
A B
350 2400 350
2 2
2 2
C (60x30x1.25)

C (60x30x1.25)
C 80x40x1.25

C 80x40x1.25
C (60x30x1.25)

C (60x30x1.25)

1 1 1 1
A

1 FULL FRAMING PLAN


A STRUCTURE DETAILS B
A B
2 PV PANELS PLAN

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
SHAHID AL JANATI 6PV MOUNTING
DESIGNED BY: A3 AS SHOWN OF ISSUE
IFA 13/7/19
SCHOOL FULL PLAN REVIEWED BY: PROJECT NO:
OPERATIONAL EXCELLENCE
FOR RESULTS THAT MATTER.
SANA'A - YEMEN. Amran CITY-YEMEN
DRAWING TYPE:
STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW
IUS-OPS-ECS-AMR-003.5
DATE:
JULY /13/2019
S2-12
GALV (L) SECTION
GALV (C) SECTION
(40x40x3) mm
(60x30x1.25) mm
4 STAINLESS
2 STAINLESS STEEL BOLTS ∅6
STEEL BOLTS ∅6

420
50 860 DETAIL A
4 STAINLESS
420
420 STEEL BOLTS ∅8

860
420

2 JOINT - DETAIL A
STRUCTURE DETAILS
RSH 43 in DN,
1.5mm THICK C 80x40x1.25

DETAIL B

GALV RSH 43 in DN,


1 2 1.5mm THICK

2 STAINLESS
SIDE SECTION A-A STEEL BOLTS ∅8
1 STRUCTURE DETAILS

3 JOINT - DETAIL B

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
SHAHID AL JANATI 6PV MOUNTING DESIGNED BY: A3 AS SHOWN OF ISSUE
IFA 13/7/19
SCHOOL SIDE ELEVATION
S2-13
REVIEWED BY: PROJECT NO:
OPERATIONAL EXCELLENCE IUS-OPS-ECS-AMR-003.5
FOR RESULTS THAT MATTER. DRAWING TYPE: DATE:
SANA'A - YEMEN. Amran CITY-YEMEN STRUCTURAL DESIGN APPROVED BY:
UNOPS DESIGN REVIEW JULY /13/2019
DETAIL B

DETAIL A

L25X1.25

BACK ELEVATION
1 STRUCTURE DETAILS

2 1
C 80x40x1.25
GALV (L25x1.25) 2 08mm

PL 3mm
L25x1.25
2 08mm
JOINT - DETAIL A 3 JOINT - DETAIL B
2 STRUCTURE DETAILS STRUCTURE DETAILS

PREPARED BY: FUNED BY: PROJECT TITLE: DRAWING TITLE: T-DSGN-BY PAPER SIZE: SCALE: PURPOSE REV. DATE DRAWING NO:
SHAHID AL JANATI 6PV MOUNTING DESIGNED BY: A3 AS SHOWN OF ISSUE
IFA 13/7/19
OPERATIONAL EXCELLENCE
FOR RESULTS THAT MATTER.
SCHOOL

Amran CITY-YEMEN
BACK ELEVATION
DRAWING TYPE:
REVIEWED BY:

APPROVED BY:
PROJECT NO:
IUS-OPS-ECS-AMR-003.5
DATE:
S2-14
SANA'A - YEMEN. STRUCTURAL DESIGN UNOPS DESIGN REVIEW JULY /13/2019

You might also like