The construction of a high-rise building However, regardless of the task for which
in Dubai presents different requirements you wish to employ our pumps, machinery
than work on the Yeywa hydro-electric has to withstand everyday working condi-
power station in Myanmar (Burma). tions. That explains why we only provide
Construction of a rail link in Tibet at an products that are extremely robust, reliable,
altitude of 5,000 metres is a significantly user friendly, fuel efficient and have a long
different proposition to working on the life.
Sutong Bridge in China where Putzmeister
pumps had to contend with an extremely in- This in turn means that you will quickly es-
homogeneous and coarse-grained material. tablish, as you will continue to do for many a
How much concrete needs to be trans- long year, that your decision in favour of
ported, how far in terms of height, distance Putzmeister was the right one – because
or both in such cases? What are the ambi- you are able to work very pro- ductively with
ent conditions and what is the quality of the our pumps, because they are very easy to
concrete? Questions that you have to ask handle, because their operating costs are
yourself prior to every practical application. very reasonable, and because you seldom
need to give any thought to service and
maintenance.
2 3
Expertise gives you a leading edge –
not all concrete is equally good
Consistent planning for extensive projects Every country has its own specific concrete
For large projects in which heavy concrete needs to be moved very high or very far, you need Wherever concrete flows, the material that comes into contact with it becomes worn.
more than the required delivery performance, you also need an appropriate total solution. Abrasion and other damage to components such as concrete hoppers, transfer tubes,
Machines, concrete spreaders, accessories and service should all be carefully matched to agitators, pumps and delivery lines are unavoidable. The extent of the wear depends on
achieve a good ratio of productivity to cost-effectiveness. the composition of the concrete. Concrete differs significantly from country to country and
even within a country.
For process-optimized planning of your delivery tasks, you can rely upon our engineers to
give you professional advice. Not only when you are involved in construction sequence plan- The ingenious geometry of Putzmeister concrete pumps was designed for all standard
ning and set-up at the building site, but well beforehand. For example when computing the concretes. Delivery and drive cylinders operate in perfect harmony with one another to
delivery pressure or testing the ‘pumpability’ of the material you will be using. This makes it ensure the machine performs outstandingly in combination with all other components.
possible, where necessary, to have some influence on the concrete recipe at an early stage in As a result, our pumps can deliver even the heaviest grades of concrete at output rates of
proceedings. Which in turn assures an optimum match between concrete and pump, and a up to 200 m³/h without requiring the installation of additional equipment. Specific details
very efficient delivery processes as an outcome. such as durable delivery pistons, standard chrome-plated delivery cylinders and the
S transfer tube system designed by Putzmeister ensure that all machines are able to
withstand long periods of intensive use.
5
Above-ground civil engineering –
where stationary can also be very flexible Manhattan Hudson Yards –
the new New Yorker Skyline
Between 10th Avenue and West 30th Street,
to the west of Manhattan, a new district is
being built, similar to the World Trade
Working under high pressure Center, with apartments and offices. One
skyscraper after the other is being
integrated into the New York High Line.
A concrete pump and its accessories are subjected to a very particular kind of stress Not only are architectural best performances
loading when required to pump concrete upwards. For example, if required to pump con- required to drive the magnificent glass
crete up to extreme heights the delivery pressure needs to be correspondingly high. This facades and steel structures into the sky.
is needed in part to overcome the height differences and in part because the return flow A sophisticated and well-conceived concrete
of concrete develops a counteracting level of energy. This of course necessitates a cor- pumping process optimally adapted to the
respondingly high level of motor or engine power. Moreover, the machine has to be built local conditions and specifications of the
to withstand the enormous forces to which it is subjected in operations such as this. construction process is also needed.
6 7
Building construction – deliberately Bridge construction – best performance for
beyond the ordinary connecting elements
At 255 m high, the spectacular skyscraper dominates the skyline of Moscow‘s new inter- Bridge construction demands a great deal of know-how from everyone involved.
national trade center “Moscow City“. What is most striking is the spiral design of the Particularly as far as concreting is concerned, some factors are critical for the project
building. To achieve this, each of the planned 54 floors are rotated by 3° to the one be- success: such as the consistent high quality of the concrete and a high pumping capacity
low, and the resulting effect is further enhanced by the pillars on the building corners. for the concretes, that are difficult to pump in most cases, as well as for large conveying
These are constructed to form a spiral, and thus they both tilt and twist. distances or heights. Efficient solutions are needed that can also withstand extreme cost
and deadline pressure.
The core walls and ceilings were concreted in three sections per floor, and were com-
pleted with a Putzmeister BSA 14000 HP D. It pumped 120,000 m³ of concrete for a Stationary Putzmeister concrete pumps are the first choice here. What type? That
distance of up to 300 m; 200 m vertically and 100 m horizontally, in order to deliver the depends on the required pumping output, the length and diameter of the pipeline,
concrete to its required placement site. Because of the restricted space on site, the the pumping height, the expected friction factor, and above all, the pumping behaviour of
high-performance pump was placed in the basement of the building but still achieved the concrete. This results in the required pumping pressure and driving power of the ma-
the desired results with ease. chine.
Korabelniy most –
with endurance towards
the objective
The approx. 11 kilometre long construction
section of the Western High Speed Dia
meter Project in St. Petersburg comprises,
among other things, the construction of a
cable-stayed bridge – the “Korabelniy
most” (the Ship’s Bridge).
8 9
Underground civil engineering – far-reaching Specialist underground civil engineering –
challenge, maximum delivery performance levels intelligent technology for specific tasks
10 11
Massive force and very well-behaved Maximum transparency
and clear layout
12 13
Easily accessible so that
everything runs smoothly
During the construction of our cement ■■ T he position of hydraulics and ■■ ptimised hopper shape simplifies the
O
pumps, we have paid strict attention to good changeover cylinder outside job of cleaning, reduces interruptions in
accessibility of all machine components, the concreting area prevents the supply of concrete and cuts down on
simple handling as well as uncomplicated pollution concrete residue
cleaning and maintenance. The result can
be noticed daily in every detail and in sum ■■ External non-return ■■ mooth outer surface simplifies the
S
total is indispensable over the long term slide valve connection job of cleaning
(standard from 1,400 mm stroke)
■■ E nlarged support area and longer
■■ E asy to change all components service life through angled support legs
on the S tube
■■ ractical hand winch for set-up work,
P
■■ F ast piston change using water with a lifting force of 3 tons
boxes that open at top, readily (standard from 2,100 mm stroke)
accessible water drain cock and
automatic Piston Pull System on ■■ dditional lashing fasteners on the
A
all HP machines machine, e.g. using clamping locks
(from 2,100 mm stroke)
■■ apid supply of all the main lube
R
points in the hopper area by the
central lubrication unit
Swing doors, for example, ensure easy access, and protect the machine operator from
rain and sun while working inside the machine
Good access for Freely accessible water connection Mini-measuring strip: All hydraulic measuring points at a central location (BSA latest
service work generation)
14 15
Its greatest strength is its great strength! The long-stroke piston pump
A2
A1
16 17
Nothing can make these pumps
‘lose their cool’
18 19
With everything that goes along with it
Special shape slide frame F80 road running gear SK standard coupling system ZX delivery line system PX hose system
Sophisticated and practical – for your stationary concrete pump you have a
comprehensive range of machine-type-dependent equipment (standard or optional)
in good Putzmeister quality.
20 21
Directive 97/68/EC aims to reduce The main advantages of
Greater efficiency and fewer emissions with nitrogen oxides and particle emissions
by 90 %, and the reduction in these
the new BSA D4
Deutz diesel
engine, Stage IV
AdBlue® pump construction machinery, including sta- machines in sensitive areas such as – Smoother running performance
and lines tionary concrete pumps, came into force inner cities or conservation zones that protects the machine
in Europe and the USA on 1st January – Reduction in noise development
2014 ■■ T he new Putzmeister BSA models BSA – Up to 10 % reduction in average
1407 D4* and BSA 1409 D4* al-ready fuel consumption
■■ ll new machines brought into
A conform to Directive 97/68/EC – CE mark
circulation must meet Stage IV or emission Stage IV/Tier 4 final, other
specifications models will follow suit
AdBlue® tank
* You can tell which of the stationary concrete pumps from Putzmeister meet the standard on the “D4” in the product description
22 23
Pumps that grow
alongside their appointed tasks…
BSA 1000 BSA 2100
The compact multi-purpose concrete pump, fitted with The long stroke concrete pumps with high performance and
a Deutz diesel motor of emissions level 3B or an electric high pump pressures are ideally suitable for use that involves
motor is suitable for flexible use on small construction sites long pumping distances. With 220 bar maximum pump
and for concrete wet spraying – anywhere where space is pressure and an output of up to 102 m³/h you are on the
limited. Normal concrete of up to 32 mm grain can be safe side even in building construction. Diesel motors of
pumped with no problem at all. level 3 or 4 are also available in the BSA 2100 class.
* highest, legal. required emissions level up to 55 kW in the EU Stage 3B* or US EPA tier 4i Stage IV or US EPA tier 4 final
1405 E 1408 E 1407 D 1409 D 1407 D4 1409 D4 14000 HP D 14000 HP D 14000 SHP D 14000 HP D4
Output up to 55 m³/h 79 m³/h 71 m³/h 97 m³/h 71 m³/h 97 m³/h Output up to 82 m³/h 102 m³/h 71 m³/h 102 m³/h
Concrete pressure up to 106 bar 106 bar 106 bar 106 bar 106 bar 106 bar Concrete pressure up to 231 bar 220 bar 250 bar 220 bar
Engine 75 kW (electric) 110 kW (electric) 115 kW (diesel) 140 kW (diesel) 105 kW (diesel) 150 kW (diesel) Engine 470 kW (diesel) 470 kW (diesel) 470 kW (diesel) 470 kW (diesel)
Delivery cylinder 200 mm 200 mm 200 mm 200 mm 200 mm 200 mm Delivery cylinder 180 mm 200 mm 180 mm 200 mm
Piston stroke 1,400 mm 1,400 mm 1,400 mm 1,400 mm 1,400 mm 1,400 mm Piston stroke 2,100 mm 2,100 mm 2,100 mm 2,100 mm
Weight 4,600 kg 4,600 kg 4,300 kg 4,500 kg 4,500 kg 4,900 kg Weight 10,500 kg 10,500 kg 11,000 kg 10,800 kg
Thanks to state-of-the-art technology, our employees have all the relevant technical The Putzmeister service support points
information about your machine at their fingertips, should the need arise. Allowing us to offer you these services – all provided by
provide you with the best possible support for emergencies, repairs or preventive main our experienced service staff:
tenance.
Subject to technical modifications and errors © by Putzmeister Concrete Pumps GmbH 2017 All rights reserved Printed in Germany (1707Sc) CT 2632-18 EN
resistant, designed for a long stroke piston pump, free-flow hydraulics,
service life S-transfer tube and EPS electronic
control unit (Ergonic® Pump System) for
■■ road performance range makes the
B exceptionally high performance and
potential applications on construction uniform concrete flow
sites and in industry very versatile indeed
■■ omprehensive, practical equipment
C
■■ E xtremely powerful performance in configuration as standard, and a
the transport of concrete, in terms of functional range of accessories assure
height and of distance flexible application options and a high
level of machine utilisation
■■ any user-friendly details ensure
M
easy operation and maintenance ■■ E xcellent service from Putzmeister
maximises the availability of your
stationary concrete pump