Professional Documents
Culture Documents
Services
and solutions.
The power to get more done
Our customers rely on being able to meet the most exacting demands.
They know they can expect 100 % performance from us. And they can be
sure that we renew their faith in us every day – willingly.
We’d like to show you in the next few pages exactly how we do this and
what you can expect from us.
The M 63 large boom is the first choice for jobs requiring an extreme Mixokret M 760 floor screed Auto-climbing stationary boom on a high-rise Land reclamation off the coast of Japan
vertical or horizontal reach conveyor in use building concrete pour in Cologne
2
Truck-mounted concrete pumps
M 20-4
M 36-4
M 6X
4
Ergonic® Systems
Following on from EBC, there are further Ergonic® modules that facilitate
day-to-day work on the concrete pump and make its operation more
efficient. EOC, for example – the Ergonic® Output Control maintains the
engine's speed of rotation at an efficient rate. Or EPS – Ergonic® Pump
System undertakes the control of the concrete pump and ensures an
optimised pumping process.
Without EBC
with EBC
EBC reduces vertical movement of the boom by approximately one-third, while simultaneously limiting end
hose deflection in all directions
6
PUMI® truck mixer concrete pumps
The Original
The PUMI® pump and mixer has long been a part of the truck mixer fleet
of a service-orientated supplier of ready-mixed concrete. It has revolution-
ised work on small and narrow construction sites throughout Germany
since 1976.
The PUMI® comes with booms with a 16 to 31 m vertical reach and two
pumping systems (rotor or piston) with outputs up to 60 m3/h.
Rotary-PUMI®
CS-PUMI®
Unique to Putzmeister – the economical rotary The CS piston pump: compact, robust and
pump: smooth, quiet and leaves behind hardly any powerful
residual concrete
9
Telebelt® –
the mobile telescopic belt conveyor
Feed and distribute the pour quickly and economically
This is where the Telebelt® comes into its own. It offers a new and econ-
omical solution for supplying and distributing materials of all kinds,
including gravel, sand, substrate, soil and all kinds of concrete.
Its range of application is huge: landscaping and agriculture, low build-
ings, embankments, tanks and pipelines, railway lines, and much more.
The Telebelt® mobile telescopic conveyor belt has a reach of up to 39 m from a material Telebelt® filling intermediate spaces during tunnel Telebelt® supplying substrate for interior and
placement site construction rooftop landscaping
10
Stationary concrete pumps and booms
600 metres up? Or two kilometres away? It doesn’t really matter – our stat-
ionary concrete pumps and booms bring the concrete to wherever it’s
needed. And they continue to set records for height and reach.
Additional horsepower and sound advice are available for large pro-
jects, if needed. Everything to make machines, concrete distributors,
accessories and service a comprehensive and cost effective
solution.
P 715
BSA 14000 HP
Stationary concrete pumps and boom accesso- S-transfer tubes for outputs up to 200 m3/h and
ries on the new Rhein/Main ICE rail link concrete pressures up to 260 bar
12
Putzmeister equipment
for dense materials
Coal? Sludge? Special waste? We pump it!
Putzmeister systems for handling the most difficult dense materials are
today’s optimal solution for numerous industrial applications. We offer
turnkey systems for the storage, preparation and transport of many dense
materials.
Pumps operating at pressures up to 200 bar, with outputs of 500 m3/h are
used. Silo designs can involve storage capacities up to 1,000 m3.
HSP
KOS
KOV
EKO
Pumping of screenings in New York/USA Supply of sewage sludge for burning in coal-fired The right pumping system for every application
power stations
15
Putzmeister systems for underground
applications
Supply and safety in tunnels and mines
When it comes to the delivery of pit water, seat valve pumps are among
the equipment used.
HSP 3080 seat valve pit water pump Concrete spraying using Putzmeister Sika 500 wet spray
in shaft at Vouteurs/France manipulators is a part of modern tunnel construction
16
PM mortar machines
P 13: the twin piston pump with ball valves is very robust and pumps
smoothly with minimal wear, even at high pressures with more difficult
mortars with a granulation of up to 8 mm.
P 715 trailer concrete pump with S transfer tube: the fine concrete pump
with S transfer tube. Pumps and sprays fine concrete with up to 16 mm
granulation and liquid screed at rates up to 20 m3/h.
P 13 EMR
P 715 TD
Sprayboy P 12
S 5 EVTM
18
Dynajet
Cleaning of construction machines Dynajet 150 to 2,800 bar high-pressure Removal of latex paint
cleaners for hot and cold water
21
Research & Development
The Ergonic® remote control is the central interface between the concrete
pump operator and the machine. Two proportional joysticks control six
directions of boom movement without the operator having to intervene
once. Tangible innovation!
Skywash aircraft cleaner Putzmeister Data Information System (Daisy) fleet The Ergonic® Boom Control (EBC) revolutionised
management software for economical management the operation of concrete distribution booms
of onsite applications
22
Putzmeister Services
Even the most reliable machines can break down sometimes. Fast and
professional advice is needed to prevent all work coming to a halt at the
construction site. Putzmeister Services provides for the unexpected:
with a high-performance emergency breakdown service, with remote diag-
nosis technicians, 24-hour delivery service of original spare parts, plus
top-class training and education – to prevent the emergency occurring in
the first place.
All from the one source: Putzmeister and its partners throughout the world
know their products and solutions inside out and can provide first-rate
service.
Monitoring of condition data Manufacturer inspections Electronic spare parts list Individual training on site and in the The latest training modules
through Ergonic® Tele Service (ETS) increase work safety Putzmeister Academy
24
Set-up sites: soon to be world-wide
Germany:
■ Putzmeister AG in Aichtal / Gründau / Althengstett
■ Branches in Berlin-Basdorf, Hamburg-Seevetal, Essen-Kettwig,
München-Eching, Gera-Korbußen, Frankfurt-Gründau
■ Putzmeister Mörtelmaschinen GmbH / Aichtal
■ Brinkmann Maschinenfabrik GmbH & Co. KG / Schloss Holte-Stukenbrock
■ Strobl Beschichtungstechnik GmbH / Biberach
27
The Putzmeister story
There is nothing which cannot be improved
1958 Engineer Karl Schlecht founds KS-Maschinenbau to build roughcast 1988 Construction of Eurotunnel with PM concrete, injection and waste-removal
machinery. pumps.
1961 First construction phase of Works I in Filderstadt near Stuttgart airport. 1989 Take-over of Wibau/Scheele in Rothenbergen.
1963 New name „Putzmeister“ - for professional roughcasting. 1990 Establishment of Putzmeister Halle.
1964 Establishment of Munich, Rhein-Ruhr, Hamburg branches. 1992 Putzmeister Japan founded.
1965 Creation of the Gipsomat, the first automatic, continuous roughcasting 1993 Foundation of Putzmeister Racine near Chicago, headquarters in the USA.
machine in the world for gypsum plaster – a revolution in casting 1994 World record: 532 m concrete lift at Riva del Garda power station in Italy.
technology. Formation of Putzmeister Berlin branch in Berlin/Basdorf.
1966 Mixokret screed machines go into production. 1995 Putzmeister Mörtelmaschinen becomes a limited company (GmbH)
1968 Start of manufacture of Putzmeister concrete pumps with 2 m concrete lift 1996 Founding of subsidiary in Shanghai/China and Putzmeister Gera branch,
for large, non-blocking outputs. new service support point for the new German states.
1971 Aichtal Works established. 1000th concrete pump supplied. 1997 Putzmeister becomes an AG (public limited company).
Elephant series transfer tube pump patented world-wide. New world record for remote supply with 2,015 m in Le Refrain, France
1972 20,000th roughcasting machine supplied. First Skywash equipment goes into operation at DLH.
1974 Other subsidiaries (production/sales) in France, Italy, Spain, GB and Brazil. 1998 Founding of Putzmeister Korea.
1976 High-rise pumping: 310 m to telecommunications tower in Frankfurt am 2001 The computer-controlled Ergonic® Boom Control revolutionises control of
Main. booms. The world’s largest KOS 25200 S piston pump transfer tube deliv-
Start of production of industrial pumps as 3rd sector. ers up to 550 m3/h.
1978 New world record with 340 m high-rise concrete pump from distance of 2003 Co-operation with Swiss company SIKA AG and development of
600 m in St. Gotthard Tunnel. SIKA Putzmeister 500 as tunnel spraying machine.
1980 Foundation of 4th sector: tunnel concreting machines. 2004 Introduction of the M 6X large boom as part of a new generation able to
1982 Delivery of the largest concrete pump in the world – close to 50 m boom reach a distance of more than 60 m. The Ergonic® family grows, with the
height and 150 m3/h output. addition of further systems, e.g. EPS (Ergonic® Pump System).
Take-over of Thomsen (USA) as Putzmeister America. 2005 Contract for the delivery of concrete pumps, booms and pipelines to the
1984 Another pioneering effort: the „Spritzbüffel“, the largest wet-spray concrete Burj Dubai. The BSA 14000 SHPD super high pressure pump is devel-
pump in the world with two huge spray arms. oped, for concrete pressures of over 300 bar.
1985 High-rise pumping: 432 m pump height in power station in Spain. Introduction of the PUMI 31.89 S.
1986 Supply of largest truck-mounted concrete pump in the world with 62 m 2006 Putzmeister Russia Moscow is established. The representative office in
boom. Putzmeister concrete pumps with special spray protection for secur- Dubai is established. Acquisition of Strobl Beschichtungstechnik GmbH in
ing Chernobyl reactor. Biberach, to complete the product range with paint pumps and small
1987 Delivery of 5000th Putzmeister Elephant. machines for painters and refurbishers.
1958 – Engineer Karl Schlecht founds KS- 1986 – Supply of largest truck-mounted concrete 2001 – The world’s largest KOS 25200 S piston 2006 – Putzmeister super high pressure concrete
Maschinenbau to build roughcast machinery pump in the world with 62 m boom pump transfer tube (delivery 550 m3/h) pumps participate in building the Burj Dubai
28 29
Facts & Figures
h Turnover growth
1000
900*
PM Group total
800 731
600 553
0
‘98 ‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06
3200*
Employee growth
3000
PM Group total
2800 2775
2600
2400 2357
2200
2019
2001
2000 1934
1822
1784
1800
1700*
PM Group in
1556 Germany
1600
1405
1400
1295 1301
1193
1200 1160
1109
1000
0 * 12/2006
‘98 ‘99 ‘00 ‘01 ‘02 ‘03 ‘04 ‘05 ‘06
30
Putzmeister AG
Max-Eyth-Str. 10 · D-72631 Aichtal
P.O.Box 21 52 · D-72629 Aichtal
Tel. +49 (71 27) 599-0 · Fax +49 (71 27) 599-520
www.putzmeister.com
PM 3617-1 GB E-mail: pmw@pmw.de