CLIENT : ONGC Petro Additions Limited (OPaL)

PMC : Engineers India Ltd.


Main Contractor : Samsung Engineering Co. Ltd.
Subcontractor :
Title : Load Application Record
Format No. :- Q - 03B
As per IS : 2911 (Part - 4)
PROJECT NAME : HDPE UNIT IN DAHEJ PETROCHEMICALS
SCOPE OF WORK : PILING WORKS
TYPE OF TEST : Intial Vertical Load Test Date of Commencement :- 21/09/2011
Pile No. :- TP-19 Date of Completion :- 23/09/2011
Pile Dia :- 600 mm Location :- Battrry Limit
Number of Jacks used :- 1 Area of Ram :- 490.874 Sq cm
Design Load :- 67.80 MT/664.627KN
Pressure Guage Least Count :- 15.0 KN Test Load :- 135.50MT/ 1329.255KN
Pressure Guage Capacity :- 3000.0 KN

OBSERVATION SHEET
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
SUB CON. SAMSUNG ENGINEERING CO LTD ENGINEERS INDIA LTD
CLIENT : ONGC Petro Additions Limited (OPaL)
PMC : Engineers India Ltd.
Main Contractor : Samsung Engineering Co. Ltd.
Subcontractor :
Title : Load Application Record
Format No. :- Q - 03B
As per IS : 2911 (Part - 4)
PROJECT NAME : HDPE UNIT IN DAHEJ PETROCHEMICALS
SCOPE OF WORK : PILING WORKS
TYPE OF TEST : Intial Vertical Load Test Date of Commencement :- 21/09/2011
Pile No. :- TP-19 Date of Completion :- 23/09/2011
Pile Dia :- 600 mm Location :- Battrry Limit
Number of Jacks used :- 1 Area of Ram :- 490.874 Sq cm
Design Load :- 67.80 MT/664.627KN
Pressure Guage Least Count :- 15.0 KN Test Load :- 135.50MT/ 1329.255KN
Pressure Guage Capacity :- 3000.0 KN

OBSERVATION SHEET
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
21/9/2011 15.55 26.24 27.24 26.31 24.93 26.18 0.000
15.55 135 20% 26.11 26.84 25.42 24.39 25.69 0.490 0.490
17.55 120 Minuts 270 40% 26.11 26.79 25.33 24.37 25.65 0.530 0.040
18.25 30 Minuts 405 60% 26.11 26.73 25.19 24.28 25.5775 0.603 0.072
20.25 30 Minuts 540 80% 25.9 26.49 24.95 24.14 25.37 0.810 0.208
22.25 30 Minuts 675 100% 25.59 26.22 24.45 24.19 25.1125 1.068 0.258
23.25 60 Minuts 810 120% 25.37 26 24.45 24.19 25.0025 1.178 0.110
22/9/2011 0.25 120.0 Minuts 930 140% 25.19 25.76 24.26 24.06 24.8175 1.363 0.185
2.25 120.0 Minuts 1065 160% 24.91 25.44 23.94 23.79 24.52 1.660 0.298
4.25 120.0 Minuts 1200 180% 24.57 24.18 23.74 23.6 24.0225 2.158 0.498
6.25 60 Minuts 1335 200% 24.58 24.51 23.14 22.99 23.805 2.375 0.218
7.25 24.58 24.46 23.1 22.95 23.7725 2.408 0.032
24'00 Hrs Observation

8.25 24.58 24.35 23 22.86 23.6975 2.483 0.075


9.25 24.58 24.3 22.95 22.82 23.6625 2.518 0.035
10.25 24.58 24.26 22.93 22.8 23.6425 2.538 0.020
11.25 24.58 24.23 22.87 22.74 23.605 2.575 0.038
12.25 24.59 24.17 22.85 22.74 23.5875 2.593 0.017
13.25 24.6 23.95 22.68 22.58 23.4525 2.728 0.135
14.25 24.61 23.76 22.52 22.41 23.325 2.855 0.127
15.25 24.61 23.76 22.48 22.39 23.31 2.870 0.015
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
16.25 24.61 23.71 22.42 22.32 23.265 2.915 0.045
17.25 24.61 23.63 22.35 22.28 23.2175 2.963 0.047
18.25 24.61 23.6 22.3 22.2 23.1775 3.003 0.040

24'00 Hrs Observation


19.25 24.61 23.52 22.22 22.12 23.1175 3.063 0.060
20.25 24.6 23.45 22.14 22.06 23.0625 3.118 0.055
21.25 24.59 23.42 22.1 22.01 23.03 3.150 0.032
22.25 24.58 23.42 22.08 21.97 23.0125 3.168 0.018
23.25 24.58 23.42 22.07 21.95 23.005 3.175 0.008
23/9/2011 0.25 24.58 23.39 22.03 21.91 22.9775 3.203 0.027
1.25 24.58 23.38 22.01 21.9 22.9675 3.213 0.010
2.25 24.59 23.34 21.99 21.87 22.9475 3.233 0.020
3.25 24.59 23.34 21.97 21.84 22.935 3.245 0.012
4.25 24.58 23.34 21.95 21.82 22.9225 3.258 0.013
5.25 24.58 23.32 21.92 21.78 22.9 3.280 0.023
6.25 24.58 23.3 21.91 21.78 22.8925 3.288 0.008

6.25 1200 24.58 23.29 21.9 21.78 22.8875 3.2925 0.005


6.55 1065 24.58 23.46 22.02 21.89 22.9875 3.19 0.100
7.25 930 24.58 23.46 22.02 21.9 22.99 3.19 0.003
8.25 810 24.58 23.66 22.18 22.05 23.1175 3.0625 0.127
8.55 675 24.6 23.8 22.25 22.14 23.1975 2.9825 0.080
9.55 540 24.6 24.09 22.47 22.38 23.385 2.795 0.187
10.25 405 24.61 24.11 22.46 22.38 23.39 2.79 0.005
10.55 270 24.62 24.25 22.51 22.42 23.45 2.73 0.060
11.25 135 24.62 24.34 22.55 22.46 23.4925 2.6875 0.042
11.55 0 24.63 24.57 22.76 22.66 23.655 2.525 0.163
0.25 24.63 24.59 22.75 22.67 23.66 2.52 0.005
0.55 24.64 25.54 23.69 23.26 24.2825 1.8975 0.623
13.25 24.65 25.69 24.35 23.9 24.6475 1.5325 0.365
13.55 24.65 25.71 24.45 24 24.7025 1.4775 0.055
14.25 24.64 25.72 24.62 24.16 24.785 1.395 0.082
14.55 24.65 25.73 24.75 24.23 24.84 1.34 0.055

GROSS SETTLEMENT : 3.288


NET SETTLEMENT : 1.34
REBOUND : 1.9475
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
SUB CON. SAMSUNG ENGINEERING CO LTD ENGINEERS INDIA LTD
ITD Cementation India Limited Format: 20110CF-02
Date : 23/9/2011
Project : Piling works - HEPE for OPaL Dahej
By : sanjay sahu
Subject: Initial Vertical load Test on Pile no. TP-19 Chkd. : Arun Khairnar

LOAD VS SETTLEMENT

Increment No. Applied Load (KN) Settlement in mm Remarks

0 0.00 0.000
1 135.00 0.490
2 270.00 0.530
3 405.00 0.603
Loading

4 540.00 0.810
5 675.00 1.068
6 810.00 1.178
7 930.00 1.363
8 1065.00 1.660
9 1200.00 2.158
10 1335.00 2.375
After 24 Hrs observation

3.287

0 1335.00 3.293
1 1200.00 3.193
2 1065.00 3.190
3 930.00 3.063
4 810.00 2.983
Loading

5 675.00 2.795
6 675.00 2.790
7 405.00 2.730
8 270.00 2.688
9 135.00 2.525
10 0.00 2.520
After 3 Hrs observation

1.90
1.53
1.48

1.395
1.34
Gross Settlement : 3.287 mm
Net Settlement : 1.34 mm
Rebound : 1.947 mm
PILE LOAD RECORD
DRIVEN CAST IN SITU PILE
Name of Sub Agency : ITD CEMENTATION INDIA LIMITED
Project Name : Piling works for HDPE, OPaL Dahej Ref Speci/DWG No:6987-LEPC4-SH-CV-ZB 1051
Type of Test: Initial Vertical Load Test
Pile No : TP-19 Location : N- 656000, E-2807000
Pile Type : 600mm dia, Driven Pile Date of Start & Time: 21/09/2011
Weather: Date of Completion & Time : 23/09/2011
Temperature: Pile Dia. : 600 mm
Number of Jacks used : 1 Area Of RAM- 490.874CM²
Ram Diameter of Jack : 250 mm Design Load: 67.80 MT/664.627KN
Pressure Gauge Least Count : 15.0 KN Test Load: 135.50MT/ 1329.255KN
Pressure Gauge Capacity: 3000.00 KN

LOAD INCREMENT CHART

INCREMENT % INCREASE OF APPLIED LOAD


SR.NO LOAD kn
NO DESIGN LOAD (KN)

1 1 20% 132.93 135.00


2 2 40% 265.85 270.00
3 3 60% 398.78 405.00
4 4 80% 531.70 540.00
5 5 100% 664.63 675.00
6 6 120% 797.55 810.00
7 7 140% 930.48 930.00
8 8 160% 1063.40 1065.00
9 9 180% 1196.33 1200.00
10 10 200% 1329.25 1335.00

For ITD Cementation India Ltd For Samsung Engineering Limited


PILE LOAD RECORD
DRIVEN CAST IN SITU PILE
Name of Sub Agency : ITD CEMENTATION INDIA LIMITED
Ref Speci/DWG No:6987-LEPC4-SH-CV-ZB 1051

LOAD INCREMENT CHART

EIL