OBSERVATION SHEET
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
SUB CON. SAMSUNG ENGINEERING CO LTD ENGINEERS INDIA LTD
CLIENT : ONGC Petro Additions Limited (OPaL)
PMC : Engineers India Ltd.
Main Contractor : Samsung Engineering Co. Ltd.
Subcontractor :
Title : Load Application Record
Format No. :- Q - 03B
As per IS : 2911 (Part - 4)
PROJECT NAME : HDPE UNIT IN DAHEJ PETROCHEMICALS
SCOPE OF WORK : PILING WORKS
TYPE OF TEST : Intial Vertical Load Test Date of Commencement :- 21/09/2011
Pile No. :- TP-19 Date of Completion :- 23/09/2011
Pile Dia :- 600 mm Location :- Battrry Limit
Number of Jacks used :- 1 Area of Ram :- 490.874 Sq cm
Design Load :- 67.80 MT/664.627KN
Pressure Guage Least Count :- 15.0 KN Test Load :- 135.50MT/ 1329.255KN
Pressure Guage Capacity :- 3000.0 KN
OBSERVATION SHEET
Average
Time of Applied Load Applied DIAL GUAGE READING Settlement Rate of
Date / Time Observation Time Interval (KN) Load (KN) % Settlement ITDC SECL EIL
0 1 2 3 Avg. (mm)
21/9/2011 15.55 26.24 27.24 26.31 24.93 26.18 0.000
15.55 135 20% 26.11 26.84 25.42 24.39 25.69 0.490 0.490
17.55 120 Minuts 270 40% 26.11 26.79 25.33 24.37 25.65 0.530 0.040
18.25 30 Minuts 405 60% 26.11 26.73 25.19 24.28 25.5775 0.603 0.072
20.25 30 Minuts 540 80% 25.9 26.49 24.95 24.14 25.37 0.810 0.208
22.25 30 Minuts 675 100% 25.59 26.22 24.45 24.19 25.1125 1.068 0.258
23.25 60 Minuts 810 120% 25.37 26 24.45 24.19 25.0025 1.178 0.110
22/9/2011 0.25 120.0 Minuts 930 140% 25.19 25.76 24.26 24.06 24.8175 1.363 0.185
2.25 120.0 Minuts 1065 160% 24.91 25.44 23.94 23.79 24.52 1.660 0.298
4.25 120.0 Minuts 1200 180% 24.57 24.18 23.74 23.6 24.0225 2.158 0.498
6.25 60 Minuts 1335 200% 24.58 24.51 23.14 22.99 23.805 2.375 0.218
7.25 24.58 24.46 23.1 22.95 23.7725 2.408 0.032
24'00 Hrs Observation
LOAD VS SETTLEMENT
0 0.00 0.000
1 135.00 0.490
2 270.00 0.530
3 405.00 0.603
Loading
4 540.00 0.810
5 675.00 1.068
6 810.00 1.178
7 930.00 1.363
8 1065.00 1.660
9 1200.00 2.158
10 1335.00 2.375
After 24 Hrs observation
3.287
0 1335.00 3.293
1 1200.00 3.193
2 1065.00 3.190
3 930.00 3.063
4 810.00 2.983
Loading
5 675.00 2.795
6 675.00 2.790
7 405.00 2.730
8 270.00 2.688
9 135.00 2.525
10 0.00 2.520
After 3 Hrs observation
1.90
1.53
1.48
1.395
1.34
Gross Settlement : 3.287 mm
Net Settlement : 1.34 mm
Rebound : 1.947 mm
PILE LOAD RECORD
DRIVEN CAST IN SITU PILE
Name of Sub Agency : ITD CEMENTATION INDIA LIMITED
Project Name : Piling works for HDPE, OPaL Dahej Ref Speci/DWG No:6987-LEPC4-SH-CV-ZB 1051
Type of Test: Initial Vertical Load Test
Pile No : TP-19 Location : N- 656000, E-2807000
Pile Type : 600mm dia, Driven Pile Date of Start & Time: 21/09/2011
Weather: Date of Completion & Time : 23/09/2011
Temperature: Pile Dia. : 600 mm
Number of Jacks used : 1 Area Of RAM- 490.874CM²
Ram Diameter of Jack : 250 mm Design Load: 67.80 MT/664.627KN
Pressure Gauge Least Count : 15.0 KN Test Load: 135.50MT/ 1329.255KN
Pressure Gauge Capacity: 3000.00 KN
EIL