1 GENERAL ASSUMPTIONS

1.1.Foundations

The overall substructures of the bridge will be using bored piles. The assumptions used for the
foundation are provided below:

No. Type of upper structure Length of Diameter No of piles Overall bored pile
pile of pile per pile cap productivity rate
1. Causeway
2. Approach bridge
3. Main bridge

The drilling will use counter circulation drilling machines to boost the progress. This project assumes
to use drilling machines of KP3000 model.