You are on page 1of 4

CURRICULUM-VITAE

Designation : Surveyor

Experience : 07 Years

Name : Nabaraj bashyal

Date of Birth : 02-10-1991

Marital Status : Married

Nationality : Indian

Mobile No. : 07079736600, 07485094128

E-mail : nabrajbansal@gmail.com

Permanent Address : At. Lucky bagh, Post. Gaya, Ta.Manpur, Dist.


Bihar. Pin Code 823001

Educational Qualification : Diploma in civil perusing, S.L.C.

Computer Skills : Ms-Office.

Language Known : Read Write Speak

Hindi Excellent Excellent Excellent


English Excellent Excellent Excellent
Key Qualification

More than 06 years of Professional Experience in Survey in National Highways , State Highways &
Airport Survey. (Knowledge of Highway Work.)
Operating Instruments : Total Station Nikon DTM552, Leica TS02,TS06+, Sokkia500,1030 and
Topcon DTM101AC With the down loading software of the same. Auto Level, Dumpy Level, And All
types of leveling instruments.
IL&FS Engineering Construction Company Limited.
Employment Record : 21-07-2016 to Till Date

PROJECT: Two Laning of Birpur To Bihpur section of NH-106 from KM. 000+000
To KM 106+000 (In the State of Bihar to be executed as under MORTH on EPC Basis
Client : Morth (Ministry of Road Transport & Highways)

Consultant : LASA Consultants

Project Cost : 675 Crores.

Designation : Sr. SURVEYOR

Job Responsibility :
1. Topographical Survey,
2. All Structure Co-ordinates Prepare in Autocad and Layout marking at site Major Bridge, Minor Bridge,
Fly-over, Vup, Pup, Box Culvert, Slab Culvert, ROB, Toll Plaza and Building. (Layout Marking
Excavation, Pcc, Raft, Wall, Pier Center, Pier Cap, Pedestral, Slab, Crash Barrier & Canopy.)
3. BC & DBM Laying & Preparation of DBM & BC Level Sheet.
4. Center line Marking Every 10 Metres interval & Kerb Marking
5.. Checking of TBM’s every Month with Consultants and approval from Consultants.
6.. Taking Ogl & Hard Rock Levels.
7. Prepare of Autocad Drawings Major Junctions, Minor Junction, Bus bays & Truck Lay bye.
8. Fixing of Closing Traverse Points along with Road with respect to the GPS Station.
9. Fixing of TBM’s every 200 Meters & ROW Pillar Fixing Every 50 Meters.
10. Checking of GPS Points from one GPS to another GPS .
11. Land Survey.
12. Monitoring of all survey activities.
IL&FS Engineering Construction Company Limited

Employment Record : 09-01- 2015 to 21-07- 2016


PROJECT : Four Laning of Patna-Gaya-Dhobi section of NH-83 from KM.
0+000 To KM 127+358 (In the State of Bihar to be executed as
BOQ on under Bihar NHDP Jaica Loan Basis)
Client : National Highway Authority of INDIA

Project Cost : 1235 Crores

Consultant : CEG & NIPPON JV.

Designation : SURVEYOR
Job Responsibility :
1. Topographical Survey,
2. All Structure Co-ordinates Prepare in AutoCAD and Layout marking at site Major Bridge, Minor Bridge,
Fly-over, Vup, Pup, Box Culvert, Slab Culvert, ROB, Toll Plaza and Building. (Layout Marking
Excavation, Pcc, Raft, Wall, Pier Cap, Pier Centre, Pedestal, Slab & Crash Barrier)
3. Checking of GPS Points from one GPS to another GPS.
4. Fixing of Closing Traverse Points along with Road with respect to the GPS Station.
5. Center line Marking Every 10 Meters interval & Kerb Marking.
6. Taking Ogl & Hard Rock Top Levels.
7. Checking of TBM’s every Month with Consultants and taking approval from Consultants.
8. Fixing of TBM’s every 200 Meters & ROW Pillar Fixing Everey 50 Meters.
9. Prepare of AutoCAD Drawings Major Junctions, Minor Junction, Bus bays & Truck Lay bye.
10. Preparation of DBM & BC Level Sheet & Approved for Consultant.
11. Land Survey.
12. Monitoring of all survey activities.

ORIENTAL STRUCTURAL ENGINEERS


Employment Record : 01-04- 2011 TO 08-01-2015

PROJECT : Six Laning of Etawa to Shakeri Section of NH-02 KM 300+000 to 400+873 Section in the state of
Uttar Pradesh to be executs as BOT(Toll)on DBFO Pattern under NHDP.

CLIENT : National Highway Authority of INDIA

Contractor : ORIENTAL STRICTURES ENGINEERS

Consultant : STUP Consultants

Designation : Jr.SURVEYOR

Job Responsibility:
1. All Structure Layout marking at site Major Bridge, Minor Bridge, Box Culvert, Slab Culvert and
Pipe Culvert.
2. Centre Line Marking Every 10 Metre interval.
3. Checking of TBM’s every Month with Consultants and taking approval from Consultants.
4. Checking of Center line Reduced Levels as per Design levels and any correction in the RL immediately
notice to the Consultants.
5. Fixing of Traverse Points along the Road .
6. Monitoring of all survey activities.

I here by declare that all the information furnished above is true to the best of my knowledge.

PLACE : Madhepura

DATE :

Nabaraj bashyal

You might also like