You are on page 1of 8

2-Hr to 3-Hr

Time (Hr) 2-Hr UH S-Curve Method


0 0
1 75 Time (Hr)
2 250 0
3 300 1
4 275 2
5 200 3
6 100 4
7 75 5
8 50 6
9 25 7
10 0 8
9
10
11

S-Curve Method (2-Hr to

Time (Hr)
0
800 1
700 2
3
600
4
5
UH

500 Time
S- 6
400 Curve 7
300 3-Hr 8
9
200
10
100 11
0
1 2 3 4 5 6 7 8 9 10 11 12

3-Hr to 2-Hr

S-Curve Method
Time (Hr)
0
1
2
3
4
5
6
7
8
9
10
11

S-Curve Method (3-Hr to


500.0
450.0
400.0
Time (Hr)
350.0
0
UH

300.0 Time 1
S-
250.0 Curve 2
200.0 2-Hr 3
150.0 4
5
100.0
6
50.0
7
0.0 8
1 2 3 4 5 6 7 8 9 10 11
9
10
2-Hr to 3-Hr 2-Hr to 1-Hr

S-Curve Method S-Curve Method

2-Hr UH SUM Time (Hr)


0 0 0
75 75 1
250 0 250 2
300 75 375 3
275 250 0 525 4
200 300 75 575 5
100 275 250 0 625 6
75 200 300 75 650 7
50 100 275 250 0 675 8
25 75 200 300 75 675 9
0 50 100 275 250 0 675 10
25 75 200 300 75 675 11

S-Curve Method (2-Hr to 3-Hr) S-Curve Method (2-Hr to


S-Curve
S-Curve Lagged 3 Diferenc 3-Hr UH
Ord Hr E Ord Time (Hr)
0 0 0.0 0
75 75 50.0 1
250 250 166.7 2
375 0 375 250.0 3
525 75 450 300.0 4
575 250 325 216.7 5
625 375 250 166.7 6
650 525 125 83.3 7
675 575 100 66.7 8
675 625 50 33.3 9
675 650 25 16.7 10
675 675 0 0.0 11

3-Hr to 2-Hr 3-Hr to 1-Hr

S-Curve Method S-Curve Method


3-Hr UH SUM Time (Hr) 3-Hr UH
0.0 0.0 0 0.0
50.0 50.0 1 50.0
166.7 166.7 2 166.7
250.0 0.0 250.0 3 250.0 0.0
300.0 50.0 350.0 4 300.0 50.0
216.7 166.7 383.3 5 216.7 166.7
166.7 250.0 0.0 416.7 6 166.7 250.0
83.3 300.0 50.0 433.3 7 83.3 300.0
66.7 216.7 166.7 450.0 8 66.7 216.7
33.3 166.7 250.0 0.0 450.0 9 33.3 166.7
16.7 83.3 300.0 50.0 450.0 10 16.7 83.3
0.0 66.7 216.7 166.7 450.0 11 0.0 66.7

S-Curve Method (3-Hr to 2-Hr) S-Curve Method (3-Hr to 1-Hr)

S-Curve S-Curve
S-Curve Lagged 2 Diferenc 2-Hr UH S-Curve Lagged 1
Ord Hr E Ord Time (Hr) Ord Hr
0.0 0.0 0.0 0 0.0
50.0 50.0 50.0 1 50.0 0
166.7 0.0 166.7 166.7 2 166.7 50.0
250.0 50.0 200.0 200.0 3 250.0 166.7
350.0 166.7 183.3 183.3 4 350.0 250.0
383.3 250.0 133.3 133.3 5 383.3 350.0
416.7 350.0 66.7 66.7 6 416.7 383.3
433.3 383.3 50.0 50.0 7 433.3 416.7
450.0 416.7 33.3 33.3 8 450.0 433.3
450.0 433.3 16.7 16.7 9 450.0 450.0
450.0 450.0 0.0 0.0 10 450.0 450.0
2-Hr to 1-Hr

S-Curve Method

2-Hr UH SUM 800


0 0
700
75 75
250 0 250 600
300 75 375

UH
500
275 250 0 525
200 300 75 575 400
100 275 250 0 625 300
75 200 300 75 650
50 100 275 250 0 675 200
25 75 200 300 75 675 100
0 50 100 275 250 0 675
0
25 75 200 300 75 675 1 2 3 4 5 6 7

S-Curve Method (2-Hr to 1-Hr)


S-Curve
S-Curve Lagged 1 Diferenc 1-Hr UH
Ord Hr E Ord
0 0 0.0
75 0 75 150.0 800
250 75 175 350.0 700
375 250 125 250.0
600
525 375 150 300.0
575 525 50 100.0
UH

500
625 575 50 100.0
400
650 625 25 50.0
675 650 25 50.0 300
675 675 0 0.0
200
675 675 0 0.0
675 675 0 0.0 100

0
1 2 3 4 5 6 7 8 9 10 11 1

500
450
400
500
SUM
0.0 450
50.0 400
166.7 350

UH
250.0 300
Tim
350.0 250 S-
383.3 Cu
200
0.0 416.7
150
50.0 433.3
166.7 450.0 100
250.0 0.0 450.0 50
300.0 50.0 450.0 0
1 2 3 4 5 6 7 8 9 10 11 12
216.7 166.7 450.0

500.0
Diferenc 1-Hr UH
E Ord 450.0
0.0 0.0 400.0
50.0 100.0 350.0
116.7 233.3
UH

300.0 T
83.3 166.7 S
250.0 C
100.0 200.0
200.0 1
33.3 66.7
33.3 66.7 150.0
16.7 33.3 100.0
16.7 33.3 50.0
0.0 0.0 0.0
0.0 0.0 1 2 3 4 5 6 7 8 9 10 11
Time
S-
Curve

2 3 4 5 6 7 8 9 10 11 12

Time
S-
Curve
1-Hr

6 7 8 9 10 11 12
Time
S-
Curve

9 10 11 12

Time
S-
Curve
1-Hr

9 10 11

You might also like