- Planning: Horizontal and Vertical Alignment, Inner Cross Section, Auxiliary


Facilities - Construction
2. Planning and
Investigation

- Investigation: Ground Condition (Route, Topography, Geology, Hydrology, Planning


Geological Research during Construction), Location Condition (Environment,
Laws, Compensation)

- Investigation Results: Ground conditions, Location conditions


(Evaluation of Ground: Ground Classification, Class of Ground)

- Design Condition: Ground condition, Location condition, Shape and Dimension, Conditions considering
acting external loads
3. Design, 6. Auxiliary Methods, 7. Tunnels in Special Ground,

Special
Evaluation of Design Condition
Design for Special Conditions
Standard 7. Tunnels in Special Ground
Standard Similar or 8. Urban Mountain Tunneling
Selection of Design Method Methods
Special
Evaluation of
Similar or Special Design
Conditions
8.Urban Mountain Tunneling Methods

①Standard Design ②Design Based on Similar Conditions ③Design by Analytical Method

Modified Design Original Design / Modified Design


Design of Excavation
Change of - Excavation Cross Section
Construction - Excavation Method, Tunnel Driving Method
Method

Change of Design of Support


Support - Support - Lining - Invert - 6. Auxiliary Methods

Other Design
Change of - Waterproofing and Drainage - Portal Zones and Portals -
Design Neighboring Construction - Branches and Enlargements

Re-evaluation of Ground Construction and Construction Management


Characteristics

- Research and Measurement Excavation and Support Observation and Measurement


7. Construction Management

during Construction
- Utilization of Observation
and Measurement Results
(Re-evaluation (Continue Construction and
NO and Change) Construction Management)
4. Construction

Feedback to Design and Construction


- Satisfy the Design Condition and Construction Condition? YES
- Selection of the Supports and Auxiliary Methods are
reasonable? - Ground is stable?

Confirm the Ground Displacement has converged (End of Excavation)


Other Works - Lining and Invert, Waterproofing and Drainage, Portal Zones and Portals

Fig. 1.1.1 Flowchart of planning, investigation, design, construction


and construction management of mountain tunneling