This document provides instructions for installing a general anchorage using a front-on crawler rig for either case or auger drilling methods along with a KG 10/10 mixer/pump grouting station. The rig will be used to drill the hole and the grouting station will mix and pump grout into the drilled hole.
This document provides instructions for installing a general anchorage using a front-on crawler rig for either case or auger drilling methods along with a KG 10/10 mixer/pump grouting station. The rig will be used to drill the hole and the grouting station will mix and pump grout into the drilled hole.
This document provides instructions for installing a general anchorage using a front-on crawler rig for either case or auger drilling methods along with a KG 10/10 mixer/pump grouting station. The rig will be used to drill the hole and the grouting station will mix and pump grout into the drilled hole.