SN Basic step of the Job Hazard(s) associated Existing control measure to Existing / Base Additional control measure Responsible Implementation Residual Risk
Impact
with the step mitigate hazard P Risk S Risk Official to Status P S Risk
1 Positioning of crane Crane wheel/jack may Injury or property 3 4 12 The ground should be PA&implement
WG Before start the job 1 2 2
go down in soil damage due to toppled Iron plate should be placed on compacted and levelled. it was complited
the crane ground before posting of crane.
Hydra may be hit to Injury to 3 3 9 1.Ensure Reverse horn on the PA& WG Training 1 3 3
workman at the time people/workman Keep distance minimum 3 mtr hydra. 2. Proper signalling implimentaid
base plate fixing. from hydra. during marching should be
ensured.
2 Fixe the siling with lifting Hand injury during hand injury 1.Tested / standard hand tools 3 1 3 WG Implemented
material & Lift it from fixing the sling. to be used. 2. Use cotton
ground to Fixing position. hand gloves. 3. Avoid to use D-
spanner.
Fall of Material due to Possibility of serious to 1.Load should be lifted as per 4 5 20 First lift it 500mm from ground PA& WG During the Job 1 5 5
failure of lifting tools or fatal accident crane capacity. 2.Encure & take hold for 10m then start ensure the load
machine. Crane & lifting tools & Tackles lift. 2. Area lifting
with valid test certificate to be should be evacuated.
use. 3.Barricading should be done in
the surrounding area.
Fall from height of Possibility of serious to 1.Make ensure proper working 3 5 15 1.Manlift use in place of AO,PA & WG Training provided 1 5 5
person or object at the fatal accident platform for work at height. working platform. to the workers.
time of guide to fix the 2. Use double lanyard safety 1.Make
platform. harness. ensure proper working
platform for work at height.
2. Use double lanyard safety
3 Fix & bolting the platform Electrocution Fire burn /Possibility of 1.Use ELCB with 30mA.2. Use 3 5 15 harness.
1.before start the work ensure PA& WG Implemented 1 5 5
on the base serious to fatal accident dry safety shoes.2.Welding the ELCB in good condition by
machine connection to be taken manually tripping method.2.
from ELCB & VRD. Use rubber mat during welding
work.
Fall of bolts & slip tools Head injury Proper hand tools to be used. 4 2 8 1.Area should be evacuated. WG Implemented 2 1 2
from hands. 2.Barricading should be done in
the surrounding area.
4 Remove the sling from Fall from height of 1.Make ensure proper working 3 5 15 1.Manlift use in place of AO,PA & WG Training provided 1 5 5
platform. person or object at the Possibility of serious to platform for work at height. working platform. to the workers.
time remove the sling. fatal accident 2. Use double lanyard safety 2. Height
harness. pass approved
person/technician engaged for
height work
Remove of existing
1 damaged one & fit-up new
one.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/002 Date:- .
Section/ Location: 230-TT-1
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Bhargav Normal/Abnormal/Emergency Normal
1.Use ELCB with 30mA.2. Use 3 5 15 1.before start the work ensure PA& WG
dry safety shoes.2.Welding the ELCB in good condition by
machine connection to be taken manually tripping method.2.
from ELCB & VRD. Use rubber mat during welding
work.
outine
l
Area cleaned 1 2 2
implemented
Another earthing 1 5 5
through earth rod is
provided
Electrocution
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/003 Date:-
Section/ Location: 230-TT-1
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
ghav Normal/Abnormal/Emergency Normal
utine
LOTOTO system 1 5 5
implemented
implemented.
implemented.
implemented. 1 3 3
implemented. 1 5 5
LOTOTO system 1 5 5
implemented
implemented.
HAZARD IDENTIFICATION A
Department: Mechanical HIRA No.
Job Title Vibrating screen Hardrox mesh replacement.
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Hand Injury to
the person
Spanner slip.
Body Injury to
the person due
Material (Bauxite) fall
from 231-DG-1. to material fall.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/004 Date:-
cement. Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
K.Bharghav Normal/Abnormal/Emergency
Existing control measure to mitigate Existing / Base Risk Additional control measure
hazard P S Risk
1.Standatd/ tested hand tools to be
used. 2. Use cotton hand gloves. 3.
Avoid to use D-spanner. 4 1 4
Reviewed by:
Signature:
Name
SN 1/2
Non Routine
Normal
WG implemented
implemented &
workmen are
awarded on
WG PPE's.
Before starting
the job it will be
PA&WG implemented
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Vibrating screen PM
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Possibility of
start the screen
serious to fatal
drive.
accident
2 Screen deck, Marsh Possibility of
mellow & hardox plat hand injury
checking. spanner slip.
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/005 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
ami, Mr. K.Bharghav Normal/Abnormal/Emergency
Existing control measure to mitigate Existing / Base Risk Additional control measure
hazard P S Risk
1.Standatd/ tested hand tools to be
used. 2. Use cotton hand gloves. 3.
Avoid to use D-spanner. 4 1 4
Reviewed by:
Signature:
Name
SN 1/2
Non Routine
Normal
WG implemented
implemented &
workmen are
WG awarded on PPE's.
LOTOTO system
implemented 1 5 5
AO & PA
WG implemented
implemented &
workmen are
PA & WG awarded on PPE's.
implemented &
workmen are
WG awarded on PPE's.
Approved by:
Signature:
Name
HAZARD IDENTIFI
Department: Mechanical HIRA No.
Job Title Skrit rubber replacement.
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
1
Possibility of
start the screen drive. serious to fatal
accident
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/006 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
mi, Mr. K.Bharghav Normal/Abnormal/Emergency
Reviewed by:
Signature:
Name
Non Routine
Normal
implemented
AO & PA LOTOTO system 5
implemented 1 5
WG
implemented
WG
implemented
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No. UAIL/BHP/O&M/HIRA/007
Job Title Diverter Gate PM
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Remove all fitted Fall & Slip hazard Possibility 1.Standatd/ tested hand
bolts from skirt of body tools to be used. 2. Use
rubber frame. injury cotton hand gloves. 3.
Avoid to use D-spanner.
1
Possibility of Proper isolation to be
serious to done of same & before
start the screen drive. fatal accident
conveyor.
4 1 4
implemented
LOTOTO procedure ensure AO & PA LOTOTO system
before the job. implemented
4 5 20 1
WG
4 1 4
implemented
WG
4 1 4
implemented
Approved by:
Signature:
Name
Residual Risk
S Risk
5
5
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No. UAIL/BHP/O&M/HIRA/008
Job Title Conveyor belt patching
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with Existing control measure
the step Impact to mitigate hazard
Injury due to Possibility of Proper isolation to be
Drive/Conveyor start. serious to fatal done of same & before
accident conveyor.
WG
implemented &
3 2 6 workmen are
awarded on PPE's.
1.before start the work PA & WG
ensure the ELCB in good
condition by manually
tripping method.2. Use
3 5 15 rubber mat or work on the
belt during grinding work.
3. Use cotton Handgloves
implemented
WG implemented &
2 2 4 workmen are
awarded on PPE's.
implemented &
WG workmen are
2 2 4
awarded on PPE's.
WG
implemented &
2 2 4 workmen are
awarded on PPE's.
Approved by:
Signature:
Name
Residual Risk
P S Risk
1 5 5
2 1 2
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No. UAIL/BHP/O&M/HIRA/009
Job Title Scraper replacement.
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with Existing control measure
the step Impact to mitigate hazard
1 Remove all fitted Possibility of 1.Standatd/ tested hand
bolts from scraper hand injury tools to be used. 2. Use
frame. Hand Injury due to cotton hand gloves. 3.
spanner slip. Avoid to use D-spanner.
4 1 4
implemented
LOTOTO procedure ensure AO&PA LOTOTO system
before the job. implemented
4 5 20
WG
4 1 4
implemented
WG
4 1 4
implemented
WG
3 1 3
implemented
Approved by:
Signature:
Name
Residual Risk
P S Risk
1 5 5
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Chute liner replacement
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Possibility of
serious to
Fire hazard burn injury
Possibility of
Injury due to material serious body
(Bauxite) fall from chute. injury
Remove of existing
2 damaged Liner plate &
Possibility of
fit-up new one.
Hand Injury due to hand injury
spanner slip.
Possibility of
Hand Injury due to serious hand
injury
spanner slip.
Remove of working
3 platform & all
Accessories
Remove of working
3 platform & all Possibility of
Accessories serious to
burn injury
Fire hazard
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/010 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Mr. K.Bharghav Normal/Abnormal/Emergency
Reviewed by:
Signature:
Name
Non Routine
Normal
implemented
AO,PA&WG LOTOTO 1 5 5
procedure
ensure before the
job.
PA & WG 1 3 3
implemented &
workmen are
awarded on
PPE's.
AGT,AO&PA It is the part of 1 4 4
Hot work PTW
system, and also
same was
implemented.
PA & WG It is the part of 1 3 3
PTW system,
and also same
was
implemented.
WG
implemented &
workmen are
awarded on
PPE's.
WG It is the part of
Hot work PTW
system, and also
same was
implemented.
PA & WG Before start the
Job
WG
implemented
WG 1 5 5
implemented &
workmen are
awarded on
electrical safety.
PA & WG 2 2 4
implemented
WG
implemented
WG It is the part of
Hot work PTW
system, and also
same was
implemented.
Approved by:
Signature:
Name
HAZARD IDENTIFICATIO
Department: Mechanical HIRA No. UAIL/BHP/O&M/HIRA/011
Job Title
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with Existing control measure to
the step Impact mitigate hazard
ZARD IDENTIFICATION AND RISK ASSESSMENT
BHP/O&M/HIRA/011 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Making arrangement
for lifting & fixing Injury due to Possibility of
1 Drive/Conveyor start. serious to fatal
manual working
platform inside chute. accident
Possibility of
serious to
burn injury
Fire hazard
Remove of existing
Possibility of
Injury due to material serious body
(Bauxite) fall from chute. injury
Possibility of
hand injury
Hand Injury due to spanner
slip.
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/012 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Mr. K.Bharghav Normal/Abnormal/Emergency
1.Use ELCB with 30mA.2. Use 1.before start the work ensure
dry safety shoes.2.Welding the ELCB in good condition by
machine connection to be taken manually tripping method.2.
from ELCB & VRD. 3 5 15 Use rubber mat during welding
work.
Reviewed by:
Signature:
Name
Non Routine
Normal
implemented &
workmen are
awarded on
work at height.
WG
implemented &
workmen are
awarded on
same work
AO,PA&WG LOTOTO 1 5 5
procedure
ensure before
the job.
PA & WG 2 2 4
implemented
WG
implemented &
workmen are
awarded on
PPE's.
WG,PA It is the part of
Hot work PTW
system, and also
same was
implemented.
PA & WG Before start the
Job
WG
implemented &
workmen are
awarded on
same work
WG 1 5 5
implemented &
workmen are
awarded on
electrical safety.
PA & WG 2 2 4
implemented &
workmen are
awarded on
work at height.
WG
implemented &
workmen are
awarded on
same work
WG,PA It is the part of
Hot work PTW
system, and also
same was
implemented.
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical
Job Title Oil replacement
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Dust hazard
Prepared by:
Signature:
Name
HIRA No. UAIL/BHP/O&M/HIRA/013 Date:-
Section/ Location:
Reference OCP (SOP/
Routine /NonRoutine
gaswami, Mr. K.Bharghav Normal/Abnormal/E
Reviewed by:
Signature:
Name
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
WG implemented &
workmen are
awarded on same
work
WG implemented &
workmen are
awarded on PPE's.
WG All area /surface are
clear.
WG implemented &
workmen are
awarded on same
work
WG implemented &
workmen are
awarded on PPE's.
WG All area /surface are
clear.
implemented &
workmen are
awarded on same
work
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Conveyor PM
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/014 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
.Bharghav Normal/Abnormal/Emergency
Existing control measure to mitigate hazard Existing / Base Risk Additional control
P S Risk measure
1.Standatd/ tested hand tools to be used.
2. Use cotton hand gloves. 3. Avoid to use
D-spanner. 4 1 4
Reviewed by:
Signature:
Name
Non Routine
Normal
WG
implemented &
workmen are
awarded on same
work
WG
implemented &
workmen are
awarded on PPE's.
WG
implemented &
workmen are
awarded on same
work
WG
implemented &
workmen are
awarded on same
work
WG
implemented &
workmen are
awarded on same
work
WG
WG
implemented &
workmen are
awarded on same
work
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Vertical Take-up Pulley lagging
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/015 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
arghav Normal/Abnormal/Emergency
Existing control measure to mitigate hazard Existing / Base Risk Additional control measure
P S Risk
Proper isolation to be done of same & 4 5 20 LOTOTO procedure ensure
before conveyor. before the job.
1.Use ELCB with 30mA.2. Use dry safety 3 5 15 1.before start the work
shoes.2.Grinding machine connection to be ensure the ELCB in good
taken from ELCB. condition by manually
tripping method.2. Use
rubber mat during welding
work.
Reviewed by:
Signature:
Name
Non Routine
Normal
WG implemented &
workmen are
awarded on same
work
WG implemented
WG implemented &
workmen are
awarded on PPE's.
WG implemented &
workmen are
awarded on same
work
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Trolley Take-up Pulley lagging
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
1 Position the crane for lift the Crane wheel/jack may go down in Possibility of
counter weight of take-up till soil & injury or property damage serious fatal
required height & rest on zero due to toppled the crane. accident &
height. property damage.
4 Removal of old lagging for surface Fall from height of person or Possibility of
preparation& lagging new rubber object at the time lagging the fracture injury/
sheet rubber sheet/pulley. Fatal accident
6 Lift the counter weight of take-up Crane wheel/jack may go down in Possibility of
till required height for conveyor soil & injury or property damage serious fatal
tension. due to toppled the crane. accident &
property damage.
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/016 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
ghav Normal/Abnormal/Emergency
3 3 9
Keep distance minimum 3 mtr from hydra.
3 4 12
Iron plate should be placed on ground
before posting of crane.
3 3 9
Keep distance minimum 3 mtr from hydra.
Reviewed by:
Signature:
Name
Date:-
Section/ Location: CV230-002, CV230-006, CV231-004A,
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
1.Ensure Reverse horn on the hydra. 2. WG/PA Use of Hydra SWI already
Proper signalling during marching should implemented at site.
be ensured.
WG Implemented
First lift it 500mm from ground & take hold WG/PA Tools & tackles are tested
for 10m then start lift. before use & good
2. Area should be evacuated. condition machine used at
3.Barricading should be done in the site.
surrounding area.
1.Area should be evacuated. 2.Barricading WG/PA During the job area will be
should be done in the surrounding area. cleaned & standard tools
are already implemented
at site.
1. Take height permit. WG/PA implemented & Work at
2. Height pass approved height trained already
person/technician engaged for height work given to workers. Also
they are very well know
about use of PPE.
WG implemented
WG implemented
1.before start the work ensure the ELCB in WG/PA implemented & workmen
good condition by manually tripping are awarded on electrical
method.2. Use rubber mat during welding safety.
work.
The ground should be compacted and WG/PA Area already compacted &
levelled. implemented all necessary
requirement as per lifting
standard.
1.Ensure Reverse horn on the hydra. 2. WG/PA Use of Hydra SWI already
Proper signalling during marching should implemented at site.
be ensured.
Approved by:
Signature:
Name
Residual Risk
P S Risk
1 4 4
1 3 3
1 5 5
1 5 5
1 5 5
3 1 3
1 5 5
1 3 3
2 2 4
1 5 5
3 1 3
1 5 5
1 4 4
1 3 3
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical
Job Title Screw Take-up Pulley lagging
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Fall of materials
Prepared by:
Signature:
Name
HIRA No. UAIL/BHP/O&M/HIRA/017 Date:-
y lagging Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
angaswami, Mr. K.Bharghav Normal/Abnormal/Emergency
Reviewed by:
Signature:
Name
Date:-
Section/ Location: CV230-003, CV231-002A/B, CV231-003A/B, CV231-0
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
WG implemented &
workmen are
awarded on same
work
WG implemented
WG implemented &
workmen are
awarded on PPE's.
WG implemented &
workmen are
awarded on same
work
WG implemented &
workmen are
awarded on same
work
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Chute Mother plate Replacement
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
1 Making arrangement for lifting & Injury due to failure of Lifting Possibility of
fixing manual working platform tools. serious hand
inside/outside chute. injury
Suffocation Possibility of
serious to fatal
accident due
to breathing
problem.
3 Remove all fitted bolts from skirt Hand Injury due to spanner slip. Possibility of
rubber frame. serious hand
injury
4 Remove all damage skirt rubber hand tools/ spanner slip during Possibility of
from skirt rubber frame the job. fracture injury
7 Remove of working platform & all hand tools/ spanner slip during Possibility of
Accessories the job. fracture injury
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/018 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
harghav Normal/Abnormal/Emergency
Proper isolation to be done of same & 4 5 20 LOTOTO procedure ensure before the
before conveyor. job.
1.Gas Test should be done before 4 4 16 1. If flammable gas present then purging
starting the job & Ensured that no should be done. 2.A Proper rescue plane
flammable gas should be present should be available & brief to the
inside the confined space. workman.
2. Fire extinguisher keep near by
work place. 3. There should be proper
means of access should be provided
for the access & egress.
1.Use ELCB with 30mA.2. Use dry 3 5 15 1.before start the work ensure the ELCB
safety shoes.2.Welding machine in good condition by manually tripping
connection to be taken from ELCB & method.2. Use rubber mat during
VRD. welding work.
Reviewed by:
Signature:
Name
Non Routine
Normal
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Inspection door replacement/ modification.
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
3 Remove all damage skirt hand tools/ spanner slip during the Possibility of
rubber from skirt rubber job. fracture injury
frame
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/019 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
ghav Normal/Abnormal/Emergency
Existing control measure to mitigate Existing / Base Risk Additional control measure
hazard P S Risk
Chain block(Lifting tools) in good 4 3 12 1. Physical inspection ensure
condition & with valid test certificate. before used. 2. Unauthorized
persons are not allowed.
3.Barricading should be done
in the surrounding area. 4.
Use oversize lifting tools &
tackle.
1.Use ELCB with 30mA.2. Use dry 3 5 15 1.Before start the work ensure
safety shoes.2.Welding machine the ELCB in good condition by
connection to be taken from ELCB & manually tripping method.2.
VRD. Use rubber mat during
welding work.
Reviewed by:
Signature:
Name
Non Routine
Normal
Same will be
implemented
before the job.
WG Implemented
WG implemented &
workmen are
awarded on same
work
WG implemented
WG It is the part of Hot
work PTW system,
and also same was
implemented.
WG implemented &
workmen are
awarded on same
work
WG implemented & 1 5 5
workmen are
awarded on
electrical safety.
WG implemented &
workmen are
awarded on same
work
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Take-up Pulley position adjustment
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
4 Open all base bolts Hand Injury due to spanner slip. Possibility of
of plumber block for fracture injury
cover remove.
6 Alignment and fit up Packing Sims may be cut the Possibility of finger
all bolts. finger pressed under load
or get cut injury on
finger.
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/020 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
hav Normal/Abnormal/Emergency
Reviewed by:
Signature:
Name
(CV230-007,CV230-008A,CV231-005A,CV231006A)
Non Routine
Normal
WG Implemented
WG Implemented
WG Implemented.
Approved by:
Signature:
Name
HAZAR
Department: Mechanical HIRA No.
Job Title Triporcar Pulley lagging
Date of Review at Job site:
Area 230
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Fall of materials
Fall from height of person or object at
the time locking the belt.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/021 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Normal/Abnormal/Emergency
4 3 12
Reviewed by:
Signature:
Name
SMENT
Date:-
Section/ Location: Stracker
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Approved by:
Signature:
Name
Residual Risk
Risk
3
5
5
4
3
HAZARD IDEN
Department: Mechanical HIRA No.
Job Title Boom Conveyor Pulley lagging
Date of Review at Job site:
Area 230
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Fall of materials
3 Proper isolation to be
done of same & Fall from height of person or object
before conveyor. at the time lagging the rubber
sheet/pulley.
1.Area should be
cleaned.
2. .Standard/ tested
hand tools to be used. Electric shock may be connecting
with grinder.
1.Standatd/ tested
hand tools to be used.
2. Use cotton hand Chemical hazard (May belt joint
gloves. 3. Avoid to solution split over the body/ eye
use D-spanner. during lagging work).
4 Proper isolation to be
done of same & Fall from height of person or object
before conveyor. at the time remove locking from
conveyor belt.
1.Area should be
cleaned.
2. .Standard/ tested
Hand Injury due to spanner slip.
hand tools to be used.
5 1.Standatd/ tested
hand tools to be used.
2. Use cotton hand
gloves. 3. Avoid to Hand Injury due to spanner slip.
use D-spanner.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/022 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
4 3 12
2 2 4
4 1 4
Reviewed by:
Signature:
Name
SSESSMENT
Date:-
Section/ Location: Stacker/ Reclimer
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
WG/PA
WG
WG
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Belt Patching
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
3 Hammering the jointed May hit one own finger Hand Injury
area
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/023 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
harghav Normal/Abnormal/Emergency
Existing control measure to mitigate Existing / Base Risk Additional control measure
hazard P S Risk
Proper isolation to be done of same & 4 5 20 LOTOTO procedure ensure
before conveyor. before the job.
1.Use ELCB with 30mA.2. Use dry safety 3 5 15 1.before start the work
shoes.2.Grinding machine connection to ensure the ELCB in good
be taken from ELCB. condition by manually
tripping method.2. Use
rubber mat during welding
work.
Reviewed by:
Signature:
Name
All Conveyor
Non Routine
Normal
WG implemented &
workmen are
awarded on
PPE's.
WG implemented &
workmen are
awarded on
PPE's.
WG/PA
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Carrying Idler replacement.
Date of Review at Job site:
Area 230/231
Risk assessment team membersMr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
3 Lowering the belt & Hand Injury due to spanner slip. Possibility of
remove the chain fracture
block. injury
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/024 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Bharghav Normal/Abnormal/Emergency
Existing control measure to mitigate Existing / Base Risk Additional control measure
hazard P S Risk
Proper isolation to be done of same 4 5 20 LOTOTO procedure ensure
& before conveyor. before the job.
Reviewed by:
Signature:
Name
Non Routine
Normal
WG implemented &
workmen are
awarded on same
work
WG implemented &
workmen are
awarded on same
work
WG implemented &
workmen are
awarded on same
work
WG implemented &
workmen are
awarded on same
work
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title GEAR BOX & MOTOR ALIGNMENT.
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/025 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Bharghav Normal/Abnormal/Emergency Normal
1.Use ELCB with 30mA.2. Use dry 3 5 15 1.before start the work WG/PA
safety shoes.2.Heatter connection to be ensure the ELCB in good
taken from ELCB/MCB.. condition by manually
tripping method.2. Use
rubber mat during electric
work.
Use Cotton dress. 2 1 2 WG/PA
implemented &
workmen are awarded
on same work
LOTOTO procedure 1 5 5
ensure before the job.
implemented &
workmen are awarded
on same work
implemented & Work 2 2 4
at height trained
already given to
workers. Also they are
very well know about
use of PPE.
implemented & 3 1 3
workmen are awarded
on Equipment lifting
procedure.
implemented &
workmen are awarded
on same work
implemented &
workmen are awarded
on same work
implemented & 3 1 3
workmen are awarded
on electrical safety.
implemented &
workmen are awarded
on handle hot material
implemented &
workmen are awarded
on handle hot material
implemented & 2 2 4
workmen are awarded
on same work
implemented & 3 1 3
workmen are awarded
on Equipment lifting
procedure.
implemented &
workmen are awarded
on same work
implemented &
workmen are awarded
on same work
implemented &
workmen are awarded
on same work
implemented & Work 1 5 5
at height trained
already given to
workers. Also they are
very well know about
use of PPE.
implemented &
workmen are awarded
on same work
HAZARD IDENT
Department: Mechanical HIRA No.
Job Title Air blaster fixing/ replacement
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
3 Lift the air blaster & fixing Failure of Lifting tools. Possibility of serious
at fixing point. hand injury
1.Must be tested Oxygen leave between 19.5 3 4 12 1. Training is required for all
to 23.5 inside chute by multi gas tester. 2. employees working in /
Take confined space permit from with Permit required
authorization person. confined spaces. 2. pass
holder only allow to work
inside confined space. 3.
Attendant must be deployed
near the entrance location.
1.Gas Test should be done before starting the 4 4 16 1. If flammable gas present
job & Ensured that no flammable gas should then purging should be
be present inside the confined space. done. 2.A Proper rescue
2. Fire extinguisher keep near by work plane should be available &
place. 3. There should be proper means of brief to the workman.
access should be provided for the access &
egress.
1.Use ELCB with 30mA.2. Use dry safety 3 5 15 1.before start the work
shoes.2.Welding machine connection to be ensure the ELCB in good
taken from ELCB & VRD. condition by manually
tripping method.2. Use
rubber mat during welding
work.
Chain block(Lifting tools) in good condition 4 3 12 1. Physical inspection ensure
& with valid test certificate. before used. 2.
Unauthorized persons are
not allowed. 3.Barricading
should be done in the
surrounding area. 4. Use
oversize lifting tools &
tackle.
1.Use ELCB with 30mA.2. Use dry safety 3 5 15 1.before start the work
shoes.2.Welding machine connection to be ensure the ELCB in good
taken from ELCB & VRD. condition by manually
tripping method.2. Use
rubber mat during welding
work.
WG implemented &
workmen are
awarded on same
work
WG
WG
WG implemented & 1 5 5
workmen are
awarded on
electrical safety.
PA & WG Before start the Job 2 2 4
WG Same will be
implemented before
the job.
WG
WG implemented & 1 5 5
workmen are
awarded on
electrical safety.
WG implemented &
workmen are
awarded on same
work
Breathing Diffi
Suffocation
Move position of Boom
conveyor receiving
1
chute to create space
for working Trap in fire
Fire hazard
Breathing Diffi
Suffocation
Move position of Boom
conveyor receiving
3
Breathing Diffi
Suffocation
Move position of Boom
conveyor receiving
3
chute to create space
for working
Trap in fire
Fire hazard
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/027 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
av Normal/Abnormal/Emergency
Reviewed by:
Signature:
Name
ESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
2 2 4
WG&PA
Approved by:
Signature:
Name
HAZARD IDENTIF
Department: Mechanical HIRA No.
Job Title PM of PCRD and CCRD
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Reviewed by:
Signature:
Name
ESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Approved by:
Signature:
Name
HAZARD ID
Department: Mechanical HIRA No.
Job Title JSA for Rail bolt tightening
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Reviewed by:
Signature:
Name
SSESSMENT
Date:-
Section/ Location: Reclimer & Stracker
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
PA & WG
Following Covid -19 precautions PA & WG 1 1
PA & WG
Approved by:
Signature:
Name
Residual Risk
Risk
1
2
1
HAZARD IDEN
Department: Mechanical HIRA No.
Job Title Boom Conveyor PM.
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Spanner slip.
Coupling checking,
2 cleaning &
lubrication.
Foreign particle may be inside to
the eye.
Spanner slip.
Discharge chute liner
4 checking
Material (Bauxite) fall hazard
Spanner slip.
7 Skirt rubber checking.
WG
WG
WG
WG
PA & WG
WG
WG
WG
WG
5
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title JSA for Divertor Gate replacement
Date of Review at Job site:
Area BHP
Risk assessment team membersMr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/031 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
arghav Normal/Abnormal/Emergency
1.Use ELCB with 30mA.2. Use dry safety 3 5 15 1.before start the work
shoes.2.Welding machines will be connected ensure the ELCB in good
through VRD in the secondary unit & ELCB condition by manually
in the primary unit 3. Proper electrical tripping method.2. Rubber
connection shall be provided to machine & mat shall be provided for
switches. welding machine. 3.
Competent / authorized
and licensed electrician with
trade validation certificate
shall only be permitted to
work on electrical lines.
1. Valve protection caps shall be in placed on 3 4 12 1. Gas cutter must be use
gas cylinder and secured properly. 2. Flash safety helmet, safety shoes,
back arrester must be connected at both end hand gloves, full sleeve
of cutting set. Hose shall be connected with cotton dress, leg guard etc.
cutting torch as well as with the cylinder by Hose pipe, regulator, cutting
crimping clamp only. 3. Gas cutting work torch, Flash back arrester
shall be done in enclosed areas with proper shall be checked before use.
supervision. Cotton dress shall be used
by gas cutters. 2. Fire
extinguishers, sand buckets,
water shall be kept ready at
site. Ceramic cloth/Spatter
arrester tray shall be used
for arrest the spatters falling
from height.
1.Use ELCB with 30mA.2. Use dry safety 3 5 15 1.before start the work
shoes.2.Welding machines will be connected ensure the ELCB in good
through VRD in the secondary unit & ELCB condition by manually
in the primary unit 3. Proper electrical tripping method.2. Rubber
connection shall be provided to machine & mat shall be provided for
switches. welding machine. 3.
Competent / authorized
and licensed electrician with
trade validation certificate
shall only be permitted to
work on electrical lines.
1. Proper approach.2. Use of Full body 3 5 15 1. Take height permit.
harness with shock absorber double lanyards, 2.
Height pass approved
person/technician engaged
for height work
1.Standatd/ tested hand tools to be used. 2. 4 1 4
Use cotton hand gloves. 3. Avoid to use D-
spanner.
1.Use ELCB with 30mA.2. Use dry safety 3 5 15 1.before start the work
shoes.2.Welding machines will be connected ensure the ELCB in good
through VRD in the secondary unit & ELCB condition by manually
in the primary unit 3. Proper electrical tripping method.2. Rubber
connection shall be provided to machine & mat shall be provided for
switches. welding machine. 3.
Competent / authorized
and licensed electrician with
trade validation certificate
shall only be permitted to
work on electrical lines.
Reviewed by:
Signature:
Name
Non Routine
Normal
AO,PA&WG LOTOTO 1 5 5
procedure ensure
before the job.
WG implemented &
workmen are
awarded on same
work
WG implemented & 1 5 5
workmen are
awarded on
electrical safety.
WG/PA Same will be 3 1 3
implemented
before the job.
WG implemented &
workmen are
awarded on same
work
WG implemented &
workmen are
awarded on same
work
PA/WG implemented & 1 5 5
Work at height
trained already
given to workers.
Also they are
very well know
about use of PPE.
WG implemented &
workmen are
awarded on same
work
PA & WG implemented & 2 2 4
workmen are
awarded on same
work
WG implemented & 1 5 5
workmen are
awarded on
electrical safety.
WG/PA Same will be 1 5 5
implemented
before the job.
WG implemented &
workmen are
awarded on same
work
WG implemented & 1 5 5
Work at height
trained already
given to workers.
Also they are
very well know
about use of PPE.
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title JSA for Drive base strenghting.
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
1 Make proper working Fall from height of person during Possibility of fracture
platform(Scaffold). platform preparation. injury/ Fatal accident
3 Lifting the beam to Failure of lifting tools during lift Possibility of serious body
fixing location & locking the load. injury/fatal accident.
by proper welding.
Fall from height of person or object Possibility of fracture
at the time of lift. injury/ Fatal
accident/property damage.
4 Welding the stipneer Fall & Slip hazard Possibility of serious body
plate for beam injury
strengthen.
strengthen.
5 Remove all arrangement. Fall from height of person or object Possibility of fracture
at the time remove the sling. injury/ Fatal
accident/property damage.
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/032 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Normal/Abnormal/Emergency
Reviewed by:
Signature:
Name
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
WG implemented &
workmen are
awarded on same
work
Approved by:
Signature:
Name
Risk
Risk
3
4
5
5
3
4
5
5
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title JSA for Take-up Pulley replacement
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
5 Lift the take-up pulley Personal injury due to Possibility of serious body
from ground to take-up unauthorized person injury
floor. inside the erection area.
6 Both side conveyor belt Fall of tools and Belt Possibility of serious to
locking/ clamping. clamp injury.
locking/ clamping.
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/033 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Normal/Abnormal/Emergency
3 3 9
Keep distance minimum 3 mtr from hydra.
Reviewed by:
Signature:
Name
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
WG Implemented
WG Implemented
Approved by:
Signature:
Name
HAZARD IDEN
Department: Mechanical HIRA No.
Job Title JSA for Drive Pulley replacement
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Spanner slip.
Dust hazard
Fall from height of person during
lift the chain block.
Failure of crane,slings/D-shackle.
Lift the take-up pulley
5 from ground to take-up
floor.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/034 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
4 5 20
Reviewed by:
Signature:
Name
SESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Approved by:
Signature:
Name
HAZARD IDENTI
Department: Mechanical HIRA No.
Job Title JSA for Snub Pulley replacement.
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Spanner slip.
Dust hazard
Fall from height of person during
lift the chain block.
Failure of crane,slings/D-shackle.
Lift the take-up pulley
5 from ground to take-up
floor.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/035 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
4 5 20
Reviewed by:
Signature:
Name
ESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Approved by:
Signature:
Name
HAZARD IDENT
Department: Mechanical HIRA No.
Job Title Replacement of conveyor belt CV-230-007/008
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/036 Date:-
/008 Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
2 4 8
Hand glooves to be worn at all times
1 2 2
2 3 6
1.Based on calculated belt load to
drag/pull the existing conveyor with wire
ropes slings force clamp & D-shackle to
be used.
2 2 4
2 2 4
Reviewed by:
Signature:
Name
SESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
It is desirable to place I
beam/channel at correct
position under the gravity
takeup to avoid free fall of 2 1 2
takeup during any
eventuality
It is desirable to place I
beam/channel at correct
position under the gravity
takeup to avoid free fall of 2 2 4
takeup during any
eventuality
ELCB to be operated
manually before resuming
task to ensure that it's
functioning 1 2 2
ELCB to be operated
manually before resuming
task
1 2 2
1.Dynomometer to be 2 1 2
installed between the
wirerope sling and
payloader to ensure that
the force/tension while
pulling is within the sling
capacity
Approved by:
Signature:
Name
HAZARD IDE
Department: Mechanical HIRA No.
Job Title Screen PM
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Hand injury
2 Spanner slip.
Screen deck
pannel,Eye bolts,
Marsh mellow and slip hazard
hardox plat checking.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/037 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
1 1 1
Using PPEs and Safety plain goggles.
1 1 1
Tested hand tools to be used
Reviewed by:
Signature:
Name
ASSESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Approved by:
Signature:
Name
Residual Risk
Risk
2
2
2
HAZARD IDENT
Department: Mechanical HIRA No.
Job Title TBP Shaft replacement
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
3 All 6 no's of link pin Fall from height of person or object at the
remove one by one & time fixing the chain block.
locking.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/038 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
2 2 4
Proper hand tools to be used
2 2 4
Load should be lifted less than lifting tools capacity
2 2 4
Trained technicians should be engaged.
Safety full body anchors it to a rigid point. 2 2 4
2 2 4
Tools tackles should be used not less than TBP shaft
2 2 4
Trained technicians should be engaged for lifting the
TBP..
Reviewed by:
Signature:
Name
SESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Approved by:
Signature:
Name
HAZARD IDENTIF
Department: Mechanical HIRA No.
Job Title Toe Bar replacement
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
3
Failure of lifting tools & tackles.
Fall Of materials.
Fall & Slips hazards( Hand Tools,
Toebar Dismentaling Persons, chain, etc.)
& rest the ground.
Fall of Toebar.
Cleaning by Hydrojet
Fall Hazards.
m/c.
Cleaning by Hydrojet
m/c.
6
Fall of Toebar.
7
Failure of lifting tools & tackles.
8
Fall of bolts & slip tools from hands
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/039 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
3 2 6
Load should be lifted less than lifting tools capacity
3 2 6
Area Should Be baricated .
3 2 6
Tested hand tools to be used
3 2 6
Load should be lifted less than lifting tools capacity
3 2 6
Area Should Be baricated .
3 2 6
Tested hand tools to be used
3 2 6
Load should be lifted less than lifting tools capacity
3 2 6
Tested hand tools to be used
2 2 4
2 2 4
Reviewed by:
Signature:
Name
SESSMENT
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
2 2 4
Chain block with valid test
certificate should be used
Use PPES. 2 2 4
1 2 2
Apart from using mandatory PPE
like safety Harness, Safety Halmet,
Gloves etc.
Approved by:
Signature:
Name
HAZARD IDEN
Department: Mechanical HIRA No.
Job Title Crusher PM
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
2 Spanner slip.
Scoup coupling, Oil and dust may enter inside eye.
pump,hose & teeth
inspection.
slip hazard
3 Spanner slip.
Oil and dustmay be inside eye.
Scoup coupling,
pump,hose & teeth
inspection. slip hazard
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/040 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
2 2 4
Use safety full body harness
2 2 4
use PPEs and Safety plain goggles
Reviewed by:
Signature:
Name
SESSMENT
Date:-
Section/ Location: BHP
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
1 2 2
Hard barricaded at screen
discharge.
1 2 2
Use PPEs and Safetyfull body
Harness.
Approved by:
Signature:
Name
HAZARD IDE
Department: Mechanical HIRA No.
Job Title Screen Bearing replacement
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
2
Fall & Slip hazard
All guard and coupling
decouple and
dismantling.
Fire hazard
6
All required platform
refitting and remove Fall of height & Slip hazard
the chain pulley.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/041 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
3 3 9
2 3 6
Load should be lifted less than lifting tools
load capacity.
2 2 4
Safety plain goggles to be used
3 2 6
Tested hand tools to be used.
2 2 4
Area should be evacuated.
3 2 6
Reviewed by:
Signature:
Name
SSESSMENT
Date:-
Section/ Location: BHP
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
2 2
Use PPEs and safety full
body harness.
used tested tools & tackle 2 2
with valid certificate.
1 2
Proper housekeeping to be 1 2
done before start the job.
Additional locking by PP 1 2
rope.
2 2
Use PPEs and Safety full
body Harness.
Approved by:
Signature:
Name
Residual Risk
Risk
4
2
6
3
4
4
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical
Job Title Gear Box and Coupling Replacement
Date of Review at Job site:
Area 230/231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Failure of D-shackle.
2 Decouple the all coupling Fall of bolts & slip tools from
bolt and remove the gear hands.
box base bolts.
Failure of slings.
Prepared by:
Signature:
Name
HIRA No. UAIL/BHP/O&M/HIRA/042
g Replacement
Reviewed by:
Signature:
Name
Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
4 WG Same will be
implemented before
the job.
9 Tested tools & tackle with valid certificate. Implemented
9 Implemented
4 WG Same will be
implemented before
the job.
4 WG Same will be
implemented before
the job.
9 Physical inspection should be done before implemented &
using, 2.Use safety hand gloves workmen are awarded
on same work
4 WG implemented &
workmen are awarded
on same work
4 implemented &
workmen are awarded
on same job.
4 implemented &
workmen are awarded
on same job.
9 Trained technicians should be engaged. implemented & Work
at height trained
already given to
workers. Also they are
very well know about
use of PPE.
4 WG implemented &
workmen are awarded
on same work
Approved by:
Signature:
Name
Residual Risk
P S Risk
2 3 6
2 3 6
2 3 6
2 3 6
2 3 6
2 3 6
2 3 6
2 3 6
2 3 6
2 3 6
2 3 6
1 3 3
2 3 6
HAZARD IDE
Department: Mechanical HIRA No.
Job Title Removing the TBP Link pin
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
3 fire hazards
Remove the link of TBP
link pin
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/043 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
3 3 9
Trained rigger should be engaged to control
the height during removing & locking the
lock pin
3 3 9
Trained technicians (MF) should be engaged.
3 3 9
3 3 9
Load should be lifted less than lifting tools
capacity
3 3 9
Reviewed by:
Signature:
Name
SSESSMENT
Date:-
Section/ Location: BHP
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
2 3
2 3
Before using physical
verification should be done
2 3
Tested and valied certified
chain pulley should be used
2 3
Trained cutter and leather
apron should be used for
the job
2 3
Chain block with valid test
certificate should be used
2 3
Make standered working
platform.
Approved by:
Signature:
Name
Residual Risk
Risk
6
6
6
6
6
6
HAZARD IDE
Department: Mechanical HIRA No.
Job Title Screen PM
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Hand injury
2 Spanner slip.
Screen deck pannel,Eye
bolts, Marsh mellow
and hardox plat slip hazard
checking.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/044 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
1 1 1
Using PPEs and Safety plain goggles.
1 1 1
Reviewed by:
Signature:
Name
SSESSMENT
Date:-
Section/ Location: BHP
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Approved by:
Signature:
Name
Residual Risk
Risk
2
2
2
HAZ
Department: Mechanical HIRA No.
Job Title crusher cage bar Replacement
Date of Review at Job site:
Area 231
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
2
Eye Injury
3 Bauxite to be
removed & Cleaning Hand tools may slipped.
to be done.
fall of material.
4 Making arrangement
for lifting & fixing
manual working
platform inside chute.
Deficiency of Oxygen
platform inside chute.
Deficiency of Oxygen
Hand injury
5 Remove of existing
damaged Cage bar
one by one & also fit-
up new one in same Fall & Slip hazard
sequence.
Deficiency of Oxygen
Fire hazard
Hand Injury
6
Spanner slip.
Remove of working
platform & all
6
Hand injury
Remove of working
platform & all
Accessories
Fire hazard
7
Fall of bolts & slip tools from
hands
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/044 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
rghav Normal/Abnormal/Emergency
3 3 9
4 3 12
before starting job check the chute condition
for any material jamming
4 3 12
4 3 12
Make working platform to perform the job.
3 3 9
3 3 9
3 3 9
3 3 9
Fire extinguisher keep near by work place.
3 3 9
cleaning to done before enter into the chute.
3 3 9
Chain pulley and di-shycacle in good
condition & with valid test certificate.
3 3 9
Tested and valied certified hand tools to be
used
Trained technicians should be engaged for 3 3 9
the job.
3 3 9
3 3 9
Fire extinguisher keep near by work place.
3 3 9
Tested and valied certified hand tools to be
used
3 3 9
Cover should be rest at ground proper by
holing chain pulley.
3 3 9
Reviewed by:
Signature:
Name
D RISK ASSESSMENT
Date:-
Section/ Location: BHP
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
2
Mechanical locking to be done
2
Area should be evacuated
Use cotton hand gloves. 2
2
Area should be evacuated
2
Mechanical locking should be done
2
isolationtghe crusher drive motor
Area should be evacuated 2
Approved by:
Signature:
Name
Residual Risk
S Risk
3 6
3 6
2 4
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title : Screen Motor replacement
Date of Review at Job site:
Area 231
Risk assessment team members
3 Make arrangement for fitting 1.Hand tools may be slip 1.Body injury
coupling. from hand 2.Hand Injury
2.Hand may compact
with coupling while fixing
3.Fire
injury if Coupling is
heated .
4 Lift the new motor with 1.Failure of chain pulley Body injury
coupling and place it on block
base. 2.Fall ofperson during
fixing of Chain Block
5 Alignment and fit up the 1.Hand tools may be slip 1.Body injury
codon shaft with motor. from hand 2.Hand Injury
2.Hand may compact
with coupling while fixing
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date:17-02-2021
Section/ Location: BAUXITE Handling plant
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Normal
1.Isolate the motor and make 2 3 6 1.LOTO and Permit system to PA & WG
the divertorgate in other screen be implemented
position. 2.Proper
Hand tools to be used.
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
HAZARD IDENTIFICATION AND RIS
Department: Mechanical HIRA No.
Job Title Crusher Motor Replacement
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
1 Positioning of crane for 1. Crane wheel/jack may May lead to fatal incident
lifting the motor. go down in soil.
2. Hydra may be hit the
workman.
2 Fixing the sling for lifting & 1. Fall from height of Body Injury
person or object at the
time fixing the sling.
3 Lift the old motor from CR- 1. Failure of crane. Hand injury
231-001A/CR-231-001B to 2. Failure of slings.
ground level 3. Fall of Material.
4. Fall from height of
person or object at the
time of lifting the motor
4 Dismantling of coupling 1. Chances of Hand tools Finger Entrapment
from old motor & may be slip from hand .
assembling in new motor. 2 Coupling may be fall on
ground.
3. Fire may be
cache on the hydraulic
oil.
5 Remove the sling from old 1. Fall from height of Leg injury
motor & fixing in new motor. person or object at the
time fixing the sling.
7 Fix & bolting the motor on t 1. Fall from height of 1.Hand injury
person or object at the 2.Slip ,Trip and fall
time fixing the sling.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/050 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
ghav Normal/Abnormal/Emergency Normal
1 3 3
2 2 4
2 2 4
2 2 4
2 2 4
2 2 4
HAZARD IDENTIFICATION AND RIS
Department: Mechanical HIRA No.
Job Title
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Fall of counterweight
due to failure of lifting
tools or crane.
Takeup complete
structure's lifting from
existing base and re-
fixed at new
foundation(Mechanical
stool base) by 200MT
crane. And fixed by
proper welding.
1 Motor, gear box & coupling Spanner may slip Hand Injury
checking with base bolt
tightning.
2 All pulleys Plummer block Fall hazard. First aid case
base bolt tightness &
lubrication.
3 Top-up of Transformer oil in Oil and Dust splash in eyeEye Injury
4 thruster.
Torqueing of Slew bolts if Spanner /torque wrench Hand Injury
necessory may slip
5 Lube pump checking & Spanner /torque wrench ma Hand Injury
lubrication.
6 Hydraulic pump checking & Oil and Dust splash in eyeEye Injury
oil top-up.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/057 Date:-
imer Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
ghav Normal/Abnormal/Emergency Normal
Name Name
utine
2 2 4
2 2 4
2 2 4
2 2 4
2 2 4
HAZARD IDENTIFICATION AND RIS
Department: Mechanical HIRA No.
Job Title PM of LT of Stacker and Reclaimer
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/058 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
ghav Normal/Abnormal/Emergency Normal
1 2 2
1 2 2
1 2 2
1 2 2
1 2 2
1 2 2
HAZARD IDENTIFICATION AND RIS
Department: Mechanical HIRA No.
Job Title :Boom Conveyor coupling inspection.
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
1 Fixing of chain block for 1.lifting tools may be slip Body Injury
lifting Fluid Coupling 2..Fall
from height of person or
object at the time fixing
the chain block.
2 Remove all fitted bolts from fl 1.Drive may be start. Hand injury
2.Spanner slip.
3.material Fall hazard
5 Lift the fluid coupling from 1.Failure of chain block Hand injury
platform to its position by 2. Failure of slings.
chain block.
6 Fitting of removed bolts of flu 1.Drive may be start. Hand injury
2.Spanner slip.
3.material Fall hazard
7 Removing the chain blocks 1.lifting tools may be slip Body Injury
2..Fall
from height of person or
object at the time fixing
the chain block.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/059 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
ghav Normal/Abnormal/Emergency Normal
1.Chain Blocks within loaded 2 4 8 1.Chain block with valid test PA&WG
capacities should be used certificate by third party should
be used
2.Safety Harness use to be 2.Trained technicians to be
mandotory. 3.Sling engagaed for the job
inspection should be Done 3.Ensure area Barrication
before usage
1.Safety Goggles should be 2 2 4 1.House jkeeping to be ensured PA&WG
used 2. Hand tools of in surroundings
exact size to be used
1.Chain Blocks within loaded 2 4 8 1.Chain block with valid test PA&WG
capacities should be used certificate by third party should
be used
2.Safety Harness use to be 2.Trained technicians to be
mandotory. 3.Sling engagaed for the job
inspection should be Done 3.Ensure area Barrication
before usage
1.Proper hand tools to be used 2 4 8 1.Permit and LOTO should e PA&WG
2.Make displayed.
Standard working platform. 2.Area should be evacuated
3.Trained fitter & rigger 3.Hand Gloves usage to be
should be engaged. mandotory
4.Boom conveyor Isolation
should be done
1.Chain Blocks within loaded 2 3 6 1.Chain block with valid test PA&WG
capacities should be used certificate by third party should
be used
2.Safety Harness use to be 2.Trained technicians to be
mandotory. engagaed for the job
2 2 4
2 2 4
2 2 4
2 2 4
2 2 4
2 2 4
HAZARD IDENTIF
Department: Mechanical HIRA No.
Job Title Carrying Idler frame replacement.
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
SN Basic step of the Job Hazard(s) associated with the step Impact
Injury due to Drive/Conveyor start. Possibility of serious to
fatal accident
Fire injury
Removals of old
2 carrying/return idler
Fire hazard
frame & replace a new.
Possibility of brunt /
facture injury
Fall of idler
Possibility of hand fracture
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/060 Date:
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Routine
Normal/Abnormal/Emergency
Residual Risk
Implementation Status
P S Risk
LOTOTO procedure 1 5 5
ensure before the job.
implemented & 2 2 4
workmen are awarded
on same work
implemented &
workmen are awarded
on same work
3 1 3
implemented
implemented &
workmen are awarded
on same work
2 Remove all fitted bolts from fluid coupling. 1.Drive may be start.
2.Spanner slip.
3.material Fall hazard
3 Lift the fluid coupling by chain block & place 1.Failure of chain block
on the platform. 2. Failure of slings.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
HIRA No. Date:
Section/ Location:
Reviewed by:
1/11/2021
Bauxite Handling Plant
Approved by:
HAZA
Department: Mechanical
1 Loosing the screw take up to zero. Fall and slip of hand tools and bolt from
hand.
2 Existing conveyor cutting & clamp with a new 1.Fall of persons/ trip hazard on the
conveyor by mechanical fastener. conveyor due to unstable surface 2.Belt
cutting knife may cut the hand during
conveyor cutting work
3 Winch/Exavator/Pay loader rope fixing at carrying 1.The fore clamp/knot may rupture and
site of old belt for carrying purpose. lead to accident if not adequately
secured to pull the belt
2.Failure of winch and tools tackle
3.Injury to near by workmen
4 Existing conveyor belt dismantling & new conveyor 1.Failure of winch and tools tackle
belt laying 2.Fall of persons/ trip hazard on the
conveyor due to unstable surface
Fire
6 Removing of clamps after new belt jointing 1.Fall of persons/ trip hazard on the
conveyor due to unstable surface 2.Belt
cutting knife may cut the hand during
conveyor cutting work
7 Provide tension to conveyor belt by screw take-up fall and slip of hand tools and bolt
from hand.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
HIRA No. Date:
Section/ Location:
Normal/Abnormal/Emergency
hand Injury 2 3 6
Hand gloves to be used
Hand injury 2 3 6
Hand gloves to be used
Body injury 2 3 6
Tested and visullay checked hook chuck to be
used
Electric shok 3 3 9
No loose connection to be done
BodY injury 2 3 6
Flammable materials should be taken away & fire
fighting equipments should be in place.
Reviewed by:
2/4/2021
Normal/Abnormal/Emergency : Normal
Approved by:
HAZARD IDENTIFICATION AN
Departmen Mechanical HIRA No.
Job Title Cardon Shaft replacement of Vibrating screen
Date of Review at Job site:
Area 231 - Screen Floor Crusher House
Risk assessment team members
5 Both side bearing with 1.Fall hazard of tools and Body Injur& eye injury
housing fitting and tackles 2.fire
lubrication hazard 3.Fall
of Beraing from hand
4.Grease
may splash in eye
7 Fixing the counter weight 1.Fall hazard of guard & Body Injury
guard,cardon shaft slip tools from hands.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/10/2021
Section/ Location: BHP
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency: Normal
implemented 2 2 4
implemented 2 2 4
implemented 2 2 4
implemented 2 2 4
implemented 2 2 4
implemented 2 2 4
HAZARD IDENTIFICATION A
Department: Mechanical HIRA No.
Job Title Dust Extraction system PM
Date of Review at Job site:
Area 231
Risk assessment team members
Spanner slip.
Hand Injury
Drive motor base bolt
1
tightness checking. Drive may be start.
Body Injury
2 'V' belt condition checking & Spanner slip.
replacement. Hand Injury
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 28th Jan 2021
Section/ Location: Bauxite Handling plant
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Normal
V- belt of suited size should be 3 3 9 Trained fitter & technician should PA & WG
used be engaged.
2 2 4
2 2 4
1 2 2
2 2 4
1 2 2
2 2 4
2 2 4
2 2 4
2 2 4
HAZARD IDENTIFICATION AND RI
Department: Bauxite Handling plant HIRA No.
Job Tit Magnetic seperator bearing Replacement
Date of Review at Job site:
Area All area
Risk assessment team members
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/10/2020
Section/ Location: BHP
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Normal
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title : Magnetic Seperator Motor replacement
Date of Review at Job site:
Area All Area
Risk assessment team members
2 Base bolt removal &Lift the 1.Below conveyor may Body Injury
magnetic seperator motor start
with chain blocks. 2.Failure of lifting tools
during lift the load.
3.Fall of bolts & slip tools
from hands. 4.Fire
hazard
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title : Oil replacement of Gear Box
Date of Review at Job site:
Area All area BHP
Risk assessment team members
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/11/2021
Section/ Location: Bauxite Handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Normal
Implemented
Implemented
Implemented
Implemented
HAZARD IDENTIFICATION A
Department: Mechanical HIRA No.
Job Title Online Lubrication and Checking of Conveyor
Date of Review at Job site:
Area All Area BHP
Risk assessment team members
1 Drive motor & gear box Spanner slip. Hand Injury/ Body Injury
base bolt tightness
checking
2 All pulleys Plummer block Spanner slip. Hand Injury/ Body Injury
base bolt tightness &
lubrication.
3 Internal & external scraper Spanner slip. Hand Injury/ Body Injury
checking & adjustment
4 Skirt rubber checking and Spanner slip. Hand Injury/ Body Injury
adjusting
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 28th Jan 2021
Section/ Location: Bauxite Hadling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency Normal
2 2 4
2 2 4
2 2 4
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title : Pulley lagging
Date of Review at Job site:
Area All Area BHP
Risk assessment team members
2 Both side converyor belt 1.Fall of tools and Belt Body Injury
locking/ clamping. clamp.
2.Fall of persons/ trip
hazard on the conveyor
due to unstable surface
3.Conveyor may start
7 Both side converyor belt 1.Fall of tools and Belt Body Injury
locking/ clamping opening clamp.
2.Fall of persons/ trip
hazard on the conveyor
due to unstable surface
3.Conveyor may start
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/11/2020
Section/ Location: Buaxite Hnadling Plant
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Normal
Implemented 2 2 4
Implemented 2 2 4
Implemented 1 2 2
Implemented
Implemented 2 2 4
Implemented 2 2 4
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title : Crusher Toe bar and Rotor cleaning
Date of Review at Job site:
Area: 231
Risk assessment team members
2 Crusher inspection door & 1.Fall of bolts & slip tools 1.Body Injury
top cover to be removed. from hands 2.Fall 2.Hand Injury
of materials/hood cover.
3 Making arrangement for 1.Slip link pin & tools 1.Hand Injury
removing coupling guard & from hands 2.Body Injury
rotor lock. 2.Rotor may move.
4 Bauxite dust & Lumps to be 1.Hand tools may slip. 1.Hand Injury
removed & cleaning to be 2.Material fall from 2.Body Injury
done. screen.
6 Crusher box-up to be done 1.Fall of bolts & slip tools 1.Body Injury
rotor lock to be removed & from hands 2.Fall 2.Hand Injury
coupling guard to be fixed. of materials/hood cover.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/15/2020
Section/ Location: Bauxite Handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency :Normal
1.Screen to be isloated. 2. 2 2 4
Trained techicians should be
engaged to control the cleaning
activity.
Trained operators to be 2 2 4
deplpyed
Implemented. 2 2 4
Implemented. 2 2 4
Implemented. 2 2 4
HAZARD IDENTIFICA
Departmen Mechanical HIRA No.
Job Title Shieve pulley replacement
Date of Review at Job site:
Area BHP all area
Risk assessment team members
1 Positioning of crane for lifting counter 1. Crane wheel/jack may May lead to fatal incident
weight go down in soil.
2. Hydra may be hit the
workman.
2 Remove Counter weight rope from take-up 1.Hand Injury Hand injury
pulley 2.Fall of D-shackle & slip
tools from hands
3 Fit-up a new sheave pulley & lubricate. 1. Electric shock may be 1.Electric Hazard
connecting with 2.Hand Injury
technician during 3.Eye injury
welding.
2.Fire during gas cutting.
3.fall and
slip of hand tools and bolt
from hand.
4.Grease may splash
in the eye.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/10/2021
Section/ Location: Bauxite handling plant
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Normal
Existing control measure to Existing / Base Risk Additional control measure Responsible
mitigate hazard P S Risk Official to
1.The ground should be 3 4 12 implement
1. During work on hydra follow PA&WG
compacted and leveled. the SWI of hydra operation.
2. Iron plate should be placed
on ground before posting of 2. 6mtr guide rope to
crane. be used.
3. Proper signaling during 3.Trained workmen should be
marching should be ensured. engaged for the job.
4. Keep distance minimum 3 mtr
from hydra.
Implemented 2 2 4
Implemented 1 2 2
Implemented 2 2 4
Implemented 1 3 3
HAZARD IDENTIFICATION
Department: Bauxite Handling HIRA No.
Job Title Tail Pulley Adjustment
Date of Review at Job site:
Area All area BHP
Risk assessment team members
2 Both side converyor belt locking/ 1.Fall of tools and Belt Body Injury
clamping. clamp.
2.Fall of persons/ trip
hazard on the conveyor
due to unstable surface
3.Conveyor may start
5 Move the pulley shaft to 1.Chances of leakages of hand injury & body injury
original position with Hydraulic hydraulic oil with
jack pressure.
2. Failure of slings.
3. Failure of chainblock.
6 Alignment of base and fit up all 1.Slip tools/bolt from hand injury & Finger
bolts hands. injury
2.Finger may be contact
and crush with base.
3.Packing
Shims may be cut the
finger
8 Both side converyor belt locking/ 1.Fall of tools and Belt Body Injury
clamping opening clamp.
2.Fall of persons/ trip
hazard on the conveyor
due to unstable surface
3.Conveyor may start
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/10/2020
Section/ Location: Bauxite Handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Normal
1.Trained fitter should operate 2 3 6 Tools with valid test certificate PA & WG
the hydraulic jack. should be used.
2.Tested and visullay checked
sling to be used along with
tested. 3.Load
should be lifted as per chain
block capacity
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title : Crusher Toe Bar adjustment
Date of Review at Job site:
Area
Risk assessment team members
3 Both side packing plate 1.Chain Block may fall 1.Body injury
Removal & toebar hold bolt 2. Fall of Materials. 3. 2.Hand Injury
removal Fall / slip of hand tools
from hand
4.Failure of tools abnd
Tackles
5.hand struck between
toe bar and its base
4 Cleaning by Hydro jet m/c. 1.High Pressure air can 1.Eye Injury
damage eye 2.Slip &
trip hazards.
5 Installing both side packing 1.Chain Block may fall 1.Body injury
plate and hold bolt 2. Fall of Materials. 3. 2.Hand Injury
Fall / slip of hand tools
from hand
4.Failure of tools abnd
Tackles
6 Making arrangement for 1.Failure of chain pulley 1.Body injury
removing the chain Block block 2.Hand Injury
2.Work at height while
installing Chain Block
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date: 2/12/2020
Section/ Location: Bauxitte Handling Plant
Reference OCP (SOP/SMP) No.
Routine /NonRoutine : Routine
Normal/Abnormal/Emergency : Routine
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
Implemented 2 2 4
HAZARD IDENTIFICATION AND RI
Department: Mechanical HIRA No.
Job Title Material Handling
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/00 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
av Normal/Abnormal/Emergency Normal
3 1 3
Fall protection
guideline for worker
3 1 3
Fall protection
guideline for worker 3 1 3
Fall protection
guideline for worker
3 1 3
Fall protection
guideline for worker
3 1 3
HAZARD IDENTIFICATION AND R
Department: Mechanical HIRA No.
Job Title Wintch Machine Fitting / dismentaling & Rope Laying
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
2 Winch machine lift by Hand injury during fixing the hand injury
Hydra. sling.
Possibility of serious to
fatal accident
Fall of martial or person
during loading and unloading.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/060 Date:-
ying Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
Normal/Abnormal/Emergency Normal
Name Name
utine
Implemented
Implemented
Training 1 3 3
implimentaid
Implemented
Implemented 2 1 2
Training provided 1 5 5
to the workers.
Implemented 2 1 2
HAZARD IDENTIFICATION AND RIS
Department: Mechanical HIRA No.
Job Title Wintch Machine Fitting & dismentaling.
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Possibility of serious to
Fall of martial or person fatal accident
during loading and
unloading.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/060 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
ghav Normal/Abnormal/Emergency Normal
Name Name
utine
Training 1 3 3
implimentaid
Implemented
Implemented 2 1 2
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Counter weight replacement from take-up
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
2
Conveyor may be start. Possibility of serious
to fatal accident
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/054 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
v Normal/Abnormal/Emergency Normal
Name Name
utine
Training 1 5 5
provided to the
workers.
Implemented
Implemented 2 1 2
Training 1 3 3
implimentaid
LOTOTO system 1 5 5
implemented
Implemented
Training 1 5 5
provided to the
workers.
LOTOTO system 1 5 5
implemented
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Department: Mechanical HIRA No.
Job Title Counter weight replacement from take-up
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
2
2 Conveyor may be start. Possibility of serious
to fatal accident
Prepared by:
Signature:
Name
UAIL/BHP/O&M/HIRA/094 Date:-
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
v Normal/Abnormal/Emergency Normal
Training 1 5 5
provided to the
workers.
Implemented
Implemented 2 1 2
Training 1 3 3
implimentaid
LOTOTO system 1 5 5
implemented
Implemented
Training 1 5 5
provided to the
workers.
LOTOTO system 1 5 5
implemented
HAZARD IDENTIFICATION AND
Department: HIRA No.
Job Title Counter weight rope & hook replacement.
Date of Review at Job site:
Area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
2 Fixing the chain block for Fall from height of person or Possibility of serious to
lifting the counter weight. object at the time fixing the fatal accident
sling/chain block.
Making arrangement & lift Failure of chain block/Lifting Possibility of fracture injury
the take-up counter weight tools tackle.
by chain block.
Fire hazard
Hand Injury
5
Electric shock may be
connecting with technicians.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/074 Date:
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Normal/Abnormal/Emergency
3 3 9
outside to be clean by 3 1 3
housekeeping labor.
1.Area should be 1 3 3
evacuated.2.Proper hand
tools to be used.
Name Name
Implementation Residual Risk
Status P S Risk
Training 1 3 3
provided to the
workers.
Implemented 1 3 3
Training provided 1 5 5
to the workers.
Implemented
Training 2 3 6
provided to the
workers.
LOTOTO system 1 5 5
implemented
Training 1 3 3
provided to the
workers.
Training 1 3 3
provided to the
workers.
Implemented 2 1 2
Implemented
1 3 3
2 Position bucket wheel boom 1. Rest platform may be toppled. Possibility of serious to
and mast over the pre 2. Fall from height of person or fatal accident
erected loose support near object at the time of bolting &
suspension pin welding.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/0 Date:
Section/ Location:
Reference OCP (SOP/SMP) No.
Routine /NonRoutine
Normal/Abnormal/Emergency
1. Load should be lifted as per crane 4 5 20 1. Slings with valid test certificate
capacity. should be used.. 2.Trained
rigger should be engaged to control
2. Crane with valid test certificate should
the height during lifting the counter
be used. weight.
3. Crane operator should be engaged for 3. Trained foreman should be
operation of crane. engaged to guide the crane
4. Area should be evacuated. operator.
5. Barricading should be done in the 4. Man basket proper locking with
surrounding area. crane hook.
1. Load should be lifted as per crane 4 5 20 1. Slings with valid test certificate
capacity. should be used.. 2.Trained rigger
2. Crane with valid test certificate should be engaged to control the
should be used.
3. Crane operator should be engaged height during lifting the counter
for operation of crane. weight.
4. Area should be evacuated. 3. Trained foreman should be
5. Barricading should be done in the engaged to guide the crane
surrounding area. operator.
4. Man basket proper locking with
crane hook.
Reviewed by:
Signature:
Name
Responsible Implementation Residual Risk
Official to Status P S Risk
implement
PA & AO LOTOTO system 1 5 5
implemented
Training provided 1 5 5
to the workers.
WG.PA
WG Implementation 1 3 3
Status
Approved by:
Signature:
Name
HAZARD IDENTIFICAT
Department: HIRA No.
Job Title Counter weight trolly frame modification & reposition.
Date of Review at Job site:
Area BHP
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Lift new counter 1. Fall from height of person Possibility of serious to fatal
weight to take-up or object at the time removing accident/Fracture injury.
frame . same.
6
7 Take-up to be fixed 1. Fall of D-shackle & slip tools from Hand Injury
back & fixing of D- hands.
shackle. 2.Hand Injury
8 Lift the counter weight of 1.Crane wheel/jack may go down in Possibility of serious to fatal
take-up till required height soil. 2.Failure of accident/Fracture injury.
for conveyor tension. Lifting tools. 3.Fall from height
of person or object at the time of
lifting the counter weight.
Prepared by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/098 Date:
Section/ Location:
Reference OCP (SOP/SMP) No.
P Routine /NonRoutine
Normal/Abnormal/Emergency
1.Make proper safe working platform. 4 5 20 1. Slings with valid test certificate
2. Trained fitter & rigger should be should be used.. 2.Trained
rigger should be engaged to control
engaged.
the height during lifting the counter
3.Trained technicians should be engaged weight.
for remove the D-shackle . 3. Trained foreman should be
4.Proper platform to be provided. engaged to guide the crane
5.Fire extinguisher keep near by work operator.
place . 4. Unauthorized persons should not
6.Authorize electrician connected the be entry inside the work area.
power supply. 5.Use Proper PPE.
7.Chain block(Lifting tools) in good
condition & with valid test certificate.
2. Trained fitter & rigger should be
rigger should be engaged to control
engaged.
the height during lifting the counter
3.Trained technicians should be engaged weight.
for remove the D-shackle . 3. Trained foreman should be
4.Proper platform to be provided. engaged to guide the crane
5.Fire extinguisher keep near by work operator.
place . 4. Unauthorized persons should not
6.Authorize electrician connected the be entry inside the work area.
5.Use Proper PPE.
power supply.
7.Chain block(Lifting tools) in good
condition & with valid test certificate.
1. Welding M/C connect with VRD & 5 5 25 1. Use proper PPE, like safety shoes,
ELCB. Safety Helmet, Heat resistance
2. Gas cutting set connect with FBA gloves. 2.Fire extinguisher placed
& NRV .
3. Flammable materials should be near work place.
taken away & fire fighting 3.Area should be clean.
equipments should be in place. 4. Earthing proper check before job.
4. Use proper hand tools as for 5.Unauthorized persons should not
requirement be entry inside the work area.
5. Barricading should be done in the
surrounding area.
6.Trained technicians should be
engaged
Reviewed by:
Signature:
Name
Non Routine
WG.PA Training 1 4 4
provided to the
workers.
Training provided 1 5 5
to the
workers./During
the Job ensure the
load lifting
WG.PA
workers./During
the Job ensure the
load lifting
WG.PA
Approved by:
Signature:
Name
HAZARD IDENTIFICATION AND RISK
Department: Mechanical HIRA No.
Job Title DSS PM
Date of Review at Job site:
Area All area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/ Date:
Section/ Location: 230-TT-1
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
, Mr. K.Bharghav Normal/Abnormal/Emergency Normal
Trained fitter & rigger should be Use PPEs and Full Body Safety
engaged. 2 2 4 Harness WG & PA
Use indivisual life line for each Safety Belt anchors it to a rigid
person 3 3 9 WG & PA
point.
on Routine
ormal
implemented 1 2 2
implemented 1 2 2
implemented 1 2 2
2 3 6
implemented & Work at
height trainning given to
technicians.
2 3 6
implemented 1 2 2
implemented 1 2 2
implemented 1 2 2
implemented 1 2 2
HAZARD IDENTIFICATION AND RISK
Department: Mechanical HIRA No.
Job Title FEEDING TABLE PM
Date of Review at Job site:
Area RECLAIMER
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/ Date:
Section/ Location: 230-TT-1
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
, Mr. K.Bharghav Normal/Abnormal/Emergency Normal
on Routine
ormal
implemented 1 2 2
implemented 1 2 2
implemented 1 2 2
implemented 1 2 2
implemented 1 2 2
pproved by:
HAZARD IDENTIFICATION AND RISK
Department: Mechanical HIRA No.
Job Title Online girth gear checking & lubrication
Date of Review at Job site:
Area RECLAIMER / STACKER
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/ Date:
brication Section/ Location: 230-TT-1
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
, Mr. K.Bharghav Normal/Abnormal/Emergency Normal
on Routine
ormal
P S Risk
Before start the job 1 2 2
training was completed
implemented 1 2 2
implemented 1 2 2
implemented 1 2 2
pproved by:
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title Flow meter installation & gate valve replacement.
Date of Review at Job site:
Area All area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Possibility of
Fall & Slip hazard serious body
injury
Possibility of
Electric shock may be serious to fatal
4 Welding the both end point connecting to the accident due to
of the pipe. technicians. electrocution
4 of the pipe.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/ Date:
alve replacement. Section/ Location: 230-TT-1
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
, Mr. K.Bharghav Normal/Abnormal/Emergency Normal
Existing control measure to mitigate Existing / Base Additional control measure Responsi
hazard P Risk S Risk ble Official
1.Power supply for pump shall be
to
physically disconnect. ELCB to be operated manually before
2.Double insulated portable tools to 3 2 6 resuming task PA & WG
be used
1. Valve protection caps shall be in 1. Gas cutter must be use safety helmet,
placed on gas cylinder and secured safety shoes, hand gloves, full sleeve
properly. 2. Flash back arrester must cotton dress, leg guard etc. Hose pipe,
be connected at both end of cutting regulator, cutting torch, Flash back
set. Hose shall be connected with 3 4 12 arrester shall be checked before use.
cutting torch as well as with the Cotton dress shall be used by gas cutters. PA & WG
cylinder by crimping clamp only. 3. 2. Fire extinguishers, sand buckets, water
Gas cutting work shall be done in shall be kept ready at site. Ceramic
enclosed areas with proper cloth/Spatter arrester tray shall be used
supervision. for arrest the spatters falling from height.
1.Load should be lifted as per lifting 1. Physical inspection ensure before used.
tools capacity. 2.Encure all lifting 2. Unauthorized persons are not allowed.
4 3 12 3.Barricading should be done in the PA & WG
tools & Tackles with valid test surrounding area. 4. Use oversize lifting
certificate to be use.
tools & tackle.
1.Use ELCB with 30mA.2. Use dry 1.before start the work ensure the ELCB in
safety shoes.2.Welding machines will good condition by manually tripping
be connected through VRD in the method.2. Rubber mat shall be provided
secondary unit & ELCB in the 3 5 15 for welding machine. 3. Competent / WG
primary unit 3. Proper electrical authorized and licensed electrician with
connection shall be provided to trade validation certificate shall only be
machine & switches. permitted to work on electrical lines.
Tested hand tools to be used 2 1 2 Area should be evacuated WG / PA
Non Routine
Normal
Approved by:
HAZARD IDENTIFICATION AN
Department: Mechanical HIRA No.
Job Title SLD INSPECTION & REPLACEMENT
Date of Review at Job site:
Area All area
Risk assessment team members Mr. P.P.Bal, Mr. S.Rangaswami, Mr. K.Bharghav
Inspection & replacement of Fall & Slip hazard Body injury &
1 Cartridge,battery & also hand injury
Machine
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
UAIL/BHP/O&M/HIRA/ Date:
ENT Section/ Location: 230-TT-1
Reference OCP (SOP/SMP) No.
Routine /NonRoutine Non Routine
, Mr. K.Bharghav Normal/Abnormal/Emergency Normal
Existing control measure to mitigate Existing / Base Additional control measure Responsi
hazard Risk ble Official
P S Risk to
implement
Make working platform to perform
the job. 3 2 6 Mechanical locking to be done WG & PA
Trained technician should be 3 2 6 Use PPEsa and Safety full body Harness. WG & PA
engaged.
Non Routine
Normal
P S Risk
implemented 1 2 2
implemented 1 2 2
Approved by:
Department:Mechanical HIRA No.
Job Title:TBP Driven shaft replacement
Date of Review at Job site:
Area:231
Risk assessment team members
body injury
Slip link pin & tools from hands.
body injury
body injury
Fall of TBP shaft
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date:
Section/ Location:bauxite Handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine :Routine
Normal/Abnormal/Emergency:Normal
2 2 4
Tools tackles should be used not less than TBP shaft
2 2 4
Trained technicians should be engaged for lifting the
TBP..
Reviewed by:
SSESSMENT
Additional control measure Responsible Official to implement Implementation Status Residual Risk
P
Area should be evacuated. 1
When work done to be
PA&WG evacuated
PA&WG Ensure before use by PA 1
used valied testedchani pulley PA&WG Ensure before use by PA 1
should be used
Area should be evacuated PA&WG Ensure before use by WG 1
Chain block with valid test PA&WG Ensure before use by
certificate should be used PA&WG
1
Use Proper PPES. WG Ensure before use by PA 1
PA&WG Ensure before use by PA
Area should be evacuated
1
Area of working platform should WG Ensure before use by PA
be cleaned. 1
Apart from using mandatory PPE PA&WG Ensure before use by WG
like safety Harness, Safety
Hamlet, Gloves etc.
1
Proper hand tools may be used. WG Ensure before use by PA
1
Tested with vailed date should WG Ensure before use by WG
be used 1
Chain block with valid test WG Ensure before use by WG
certificate should be used. 1
Barricading should be done in PA&WG Ensure before use by PA
the surrounding area.
1
Tools tackle with valid test PA&WG Ensure before use by PA
certificate should be used 1
PA&WG Ensure before use by PA
Unauthorized persons should not
be entry inside the work area
1
Use Proper PPE's. PA&WG Ensure before use by PA
1
WG Ensure before use by WG
Area should be evacuated
1
Chain block with valid test PA&WG Ensure before use by PA
certificate should be used 1
Make proper working platform. PA&WG Ensure before use by PA 1
Area should be evacuated PA&WG Ensure before use by PA 1
Chain block with valid test PA&WG Ensure before use by PA
certificate should be used 1
PA&WG Ensure before use by PA
Make proper working platform.
1
Approved by:
Residual Risk
S Risk
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
Department:Mechanical HIRA No.
Job Title:TBP Link Replacement
Date of Review at Job site:
Area:231
Risk assessment team members
body injury
TBP Chain link looseness by Slip link pin & tools from hands.
removing packing plate both
hand injury
sideand lift the shaft by chain
pulley
Failure of chains body injury
Failure of lifting tools & tackles.
body injury
3 fire hazards
Remove the link of TBP link pin body injury
4
Fall of link pin body injury
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date:
Section/ Location:Bauxite Handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine :Routine
Normal/Abnormal/Emergency:Normal
3 3 9
Trained rigger should be engaged to control
the height during removing & locking the
lock pin
3 3 9
Trained technicians (MF) should be engaged.
3 3 9
Tested hand tools to be used.
3 3 9
Tested hand tools to be used
Reviewed by:
ASSESSMENT
Additional control measure Responsible Official to implement Implementation Status Residual Risk
P
full body harness should be used WG WHEN PERFORMED AT
JOB 2
PA&WG WHEN PERFORMED AT 2
Trained technicians and safety
full body harness should be JOB
used.
Area should be evacuated. wg WHEN PERFORMED AT 2
JOB
Before using physical PA&WG WHEN PERFORMED AT 2
verification should be done JOB
PA&WG WHEN PERFORMED AT 2
Approved by:
Residual Risk
S Risk
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
HAZA
Department:Mechanical HIRA No.
Job Title:screen pad palte replacement
Date of Review at Job site:
Area:231
Risk assessment team members
Body injury
hand injury
Failure of lifting tools.
5 drive shaft locking to
be done at one side
while removing Body injury
bearing housing. Fall from height of person or object
at the time fixing the sling.
6 Both site existing pad
plate dismantling. Body injury
Body injury
Fall from height of person or object
at the time removing same.
6 Both site existing pad
plate dismantling.
Body injury
hand injury
Hand Injury
7 Both side pad plate
area grinding. Body injury
Body injury
Braking of grinding wheel.
Shock while applying power tool Body injury
socket
8 Both side new pad Failure of chain block. hand injury
plate fixing &
welding.
Body injury
Fire hazard
Body injury
Electrocution
9 Both side bearing hand injury
with housing fitting. Hand Injury
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date:
Section/ Location:Bauxite Handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine :Non Routine
Normal/Abnormal/Emergency:Normal
4 3 12
4 3 12
3 3 9
Reviewed by:
RISK ASSESSMENT
Additional control measure Responsible Official to implement Implementation Status Residual Risk
P
Use full body harness. WG IMPLEMENT AT JOB 1
Use PPEs. WG IMPLEMENT AT JOB 1
WG IMPLEMENT AT JOB 2
All tools & tackle are tested
with valid certificate to be
used
Use PPEs. WG IMPLEMENT AT JOB 2
Trained technicians should PA&WG IMPLEMENT AT JOB 2
be engaged.
WG IMPLEMENT AT JOB 2
Proper housekeeping to be
done before start the job.
WG IMPLEMENT AT JOB 2
Tested lifting tools & tackle
to be used.
WG IMPLEMENT AT JOB 2
Tested lifting tools & tackle
to be used.
WG IMPLEMENT AT JOB 2
Trained technicians should
be engaged.
WG IMPLEMENT AT JOB 2
Proper housekeeping to be
done before start the job.
WG IMPLEMENT AT JOB 2
WG IMPLEMENT AT JOB 2
Trained technician to be
deployed.
WG IMPLEMENT AT JOB
WG IMPLEMENT AT JOB
WG IMPLEMENT AT JOB 2
Approved by:
Residual Risk
S Risk
3 3
3 3
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
3 6
HAZARD ID
Department:Mechanical HIRA No.
Job Title:Replacement of marshmellow of screen
Date of Review at Job site:
Area:231
Risk assessment team members
1
Body injury
Fall from height of person or object
Make arrangement at the time fixing the sling.
Hand injury
for fixing the chain
block.
Failure of chain block.
Hand injury
2 Hand crush
Jacking arrangement
to be provided for Hand injury
lifting the pannel
5 Remove of existing
damaged marsh Hand injury
Mellow & fit-up new Fall & Slip hazard
one. Hand injury
Hand Injury
Hand injury
Failure of Lifting tools.
Hand injury
Hand injury
8 Body injury
Remove all lifting Fall from height of person or object
arrangements at the time fixing the sling. Body injury
including jacking
&chain pulley Body injury
arrangement. Failure of chain block.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date:
Section/ Location:bauxite Handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine :Routine
Normal/Abnormal/Emergency:normal
2 2 4
Load should be lifted as per chain block 2 2 4
capacity.
2 2 4
Trained rigger should be engaged to control
the height during lifting the Panel.
2 3 6
Make proper working platform.
3 3 9
Trained fitter & rigger should be engaged.
3 3 9
Chain block(Lifting tools) in good condition &
with valid test certificate.
Reviewed by:
SSESSMENT
2 3
WG Implement at job
1 2
PA&WG Implement at job 1 2
visual inspections conduct
before used.
WG Implement at job
WG Implement at job
WG Implement at job 2 3
Unauthorized persons should
not be entry inside the work
area.
WG Implement at job
Use cotton Hand gloves PA&WG Implement at job
2 3
Area should be evacuated. PA&WG Implement at job 2 0
WG Implement at job 2 3
Use PPEs and safety full
body harness
All tools & tackle tested WG Implement at job 2 3
with valid certificate.
Approved by:
Residual Risk
Risk
4
2
2
6
6
6
6
HAZARD IDENT
Department:Mechanical HIRA No.
Job Title:Crusher Cage Bar Replacement
Date of Review at Job site:
Area:231
Risk assessment team members
2
Eye Injury Eye injury
3 Bauxite to be
removed & Cleaning Hand tools slippage. Hand injury
to be done.
4 Making arrangement
for lifting & fixing
manual working safagation
platform inside chute.
Deficiency of Oxygen
safagation
platform inside chute.
Deficiency of Oxygen
safagation
5 Remove of existing
damaged Cage bar Hand injury
one by one & also fit- Fall & Slip hazard
up new one in same Hand injury
sequence.
Deficiency of Oxygen
safagation
safagation
safagation
Body injury
Jammed bauxite fall hazard
6 Hand injury
Spanner slip.
safagation
Remove of working
platform & all
Accessories safagation
Fire hazard
safagation
7 Fall of bolts & slip tools from Hand injury
hands
Body injury
Fall of materials/hood cover
Crusher all inspection
door & hood cover Hand injury
Slip coupling bolt,inspection
box-up to be done
door,hood cover bolts & tools from
rotor lock to be
hands
removed & coupling
guard to be fitup.. Hand injury
Drive shaft rotate.
Hand injury
Spanner slip.
Prepared by:
HAZARD IDENTIFICATION AND RISK ASSESSMENT
Date:
Section/ Location:Bauxite handling
Reference OCP (SOP/SMP) No.
Routine /NonRoutine :Non routine
Normal/Abnormal/Emergency:Normal
3 2 6
Trained rigger should be engaged to control
the height during removing & locking the
lock pin
3 3 9
Mechanical lockingto be done
3 3 9
3 3 9
3 3 9
Trained fitter & rigger should be engaged.
3 3 9
Fire extinguisher keep near by work place.
3 3 9
cleaning to done before enter into the chute.
3 3 9
Fire extinguisher keep near by work place.
Tested and valied certified hand tools to be 3 3 9
used
Cover should be rest at ground proper by 3 3 9
holing chain pulley.
3 3 9
Trained technician should be engaged to
control the height during removing & locking
the lock pin
3 3 9
Mechanical lockingto be done
3 3 9
Tested hand tools to be used
Reviewed by:
SSMENT
Approved by:
JOB SAFE
DEPARTMENT: MECHANICAL
NAME OF WORKING AGENCY: JCPL
JOB TITLE: Crusher Scoop Replacement
JOB DURATION: 08Hrs.
AREA: 231
RISK ASSESSMENT TEAM MEMBERS:
HAZARD IDENTIFICATION
S.NO Description of Task
Step ( Sequence of basic
steps )
Hazard
2
Positioning of crane for
lifting the motor.
Hydra may hit the workman during
Iron plate Positioning .
Starting of the
Allignment work from
crusher to scoop
10 coupling then scoop Finger
scoop .
may be trapped with base of
coupling to motor and
fitting up all coupling
bolts.
Allignment work from
crusher to scoop
10 coupling then scoop
coupling to motor and
fitting up all coupling
bolts.
P S R
RISK CONTROL
Additional Control Residual Risk Respon Complet Ref to
Measures sible ion date SOP,
Person SMP,
SWI
P S R
2 1 2
Crane operator should be engaged
for operation of crane. Area
should be evacuated.Crane with 2 2 4
valid test certificate should be
used.
1 2 2
visual inspection should be done
before performing work.Trained
technicians should be engaged
1 2 2
1 2 2
visual inspection of chain blocks
must be done & load should be
handled less than chain block
capacity.Barication should be
made.
2 1 2
2 1 2
2 1 2
Failure of rope.
usher
P S R
RISK CONTROL
Additional Control Residual Risk Respon Complet Ref to
Measures sible ion date SOP,
Person SMP,
P S R SWI
2 1 2
. 1 3 3
1 1 1
1 1 1
1 2 2
1 2 2
1 1 1
1 1 1
1 1 1
1 1 1
SWI shoud be follwed.
Failure of rope.
usher
P S R
RISK CONTROL
Additional Control Residual Risk Respon Complet Ref to
Measures sible ion date SOP,
Person SMP,
P S R SWI
2 1 2
. 1 3 3
1 1 1
1 1 1
1 2 2
1 2 2
1 1 1
1 1 1
1 1 1
1 1 1
SWI shoud be follwed.