Professional Documents
Culture Documents
Grafik Modul Mektan 1
Grafik Modul Mektan 1
RM WATER CONTENT
UNIVERSITAS MERCU BUANA
Jalan Meruya Selatan No.1, Meruya Selatan FO
Project : Job No. :
Tested : Checked :
No. Penjelasan
Sampel 1 Sampel 2 Sampel 3 Sampel 4 Sampel 5 Sampel 6 Sampel 7 Sampel 8
1 No Sampel Unit
2 Berat cawan + tanah basah gr
3 Berat cawan + tanah kering gr
4 Berat air gr
5 Berat cawan gr
6 Berat kering gr
7 Kadar air %
8 Rata- rata %
No. Penjelasan
Unit Sampel 9 Sampel 10 Sampel 11 Sampel 12 Sampel 13 Sampel 14 Sampel 15 Sampel 16
1 No Sampel
2 Berat cawan + tanah basah gr
3 Berat cawan + tanah kering gr
4 Berat air gr
5 Berat cawan gr
6 Berat kering gr
7 Kadar air %
8 Rata- rata %
No. Penjelasan
Unit Sampel 17 Sampel 18 Sampel 19 Sampel 20 Sampel 21 Sampel 22 Sampel 23 Sampel 24
1 No Sampel
2 Berat cawan + tanah basah gr
3 Berat cawan + tanah kering gr
4 Berat air gr
5 Berat cawan gr
6 Berat kering gr
7 Kadar air %
8 Rata- rata %
LABORATORIUM MEKANIKA TANAH
RM UNIT WEIGHT
UNIVERSITAS MERCU BUANA
Jalan Meruya Selatan No.1, Meruya Selatan
FO
Project : Job No. :
Tested : Checked :
No. Penjelasan
1 No Sampel Unit Sampel 1 Sampel 2 Sampel 3 Sampel 4 Sampel 5 Sampel 6 Sampel 7 Sampel 8
2 No Cincin
3 Berat tanah + berat cincin gr
4 Berat cincin gr
5 Berat tanah basah gr
6 Volume tanah / Isi cincin gr
7 Berat isi cm³
8 Rata- rata (ϒn) gr/cm³
No. Penjelasan
1 No Sampel Unit Sampel 9 Sampel 10 Sampel 11 Sampel 12 Sampel 13 Sampel 14 Sampel 15 Sampel 16
2 No Cincin
3 Berat tanah + berat cincin gr
4 Berat cincin gr
5 Berat tanah basah gr
6 Volume tanah / Isi cincin gr
7 Berat isi cm³
8 Rata- rata (ϒn) gr/cm³
No. Penjelasan
1 No Sampel Unit Sampel 17 Sampel 18 Sampel 19 Sampel 20 Sampel 21 Sampel 22 Sampel 23 Sampel 24
2 No Cincin
3 Berat tanah + berat cincin gr
4 Berat cincin gr
5 Berat tanah basah gr
6 Volume tanah / Isi cincin gr
7 Berat isi cm³
8 Rata- rata (ϒn) gr/cm³
LABORATORIUM MEKANIKA
SPECIFIC GRAVITY OF SOIL
TANAH RM
O
UNIVERSITAS MERCU BUANA
SOLIDS F
Jalan Meruya Selatan No.1, Meruya Selatan
Project : Job No. :
Tested : Checked :
GS = (W 2 - W 1) Relative Density
((W2 - W1 ) + (W4 - W3 )) Temperature (˚C) Correction Factor Of K
Of Water
18 0.9986244 1.0004
19 0.9984347 1.0002
20 0.9982343 1
21 0.9980233 0.9998
22 0.9978019 0.9996
23 0.9975702 0.9993
24 0.9973286 0.9991
25 0.997077 0.9989
26 0.9968156 0.9986
27 0.9965451 0.9983
28 0.9962652 0.998
29 0.9959761 0.9977
30 0.995678 0.9974
LABORATORIUM MEKANIKA ATTERBERG
TANAH O RM LIMITS
UNIVERSITAS MERCU BUANA F
Project : Jalan Meruya Selatan No.1, Meruya Selatan Job No. :
Location : Soil Description :
Date : Depth :
Tested : Checked :
LIQUID LIMIT
PLASTIC LIMIT
No. of Blows
Container No.
Wt. Container + Wet Soil g
Wt. Water g
Wt. Container g
FLOW CURVE
90
80
Water Content (%)
70
60
50
10 100
Number of Blows
RESULT SUMMARY
LIQUID LIMIT %
PLASTIC LIMIT %
PLASTICITY INDEX %
CLASSIFICATION
LABORATORIUM MEKANIKA TANAH PARTICLE SIZE DISTRIBUTION
UNIVERSITAS MERCU BUANA RM ANALYSIS
Jalan Meruya Selatan No.1, Meruya Selatan FO
Project : Job No. :
Location : CBR LAP No. :
Date : Depth :
Tested : Checked :
NOTES :
Percent
Sieve Opening Wt. Soil Cumulative Percent Finer (%)
Sieve No. Retained
(mm) Retained Percent
(%)
Retained (%)
3" 101.600
2" 75.000
1 1/2" 38.100
1" 25.400
3/4" 19.050
1/2" 12.700
3/8" 9.525
4 4.760
10 2.000
20 0.840
40 0.420
80 0.177
100 0.149
200 0.074
Pan
Total
NOTES :
100.00 0.1490 0.00 0.00 - - - 0.149
100.00 0.1770 0.00 0.00 - - - 0.177
0.0050 #NUM!
- - - - 0.177 - -
- - - - 0.420 - -
- - - - 0.840 - -
- - - 2.380 - - -
- - - 4.760 - - -
- - - 9.525 - - -
- - - 12.700 - - -
- - - 19.050 - - -
- - - 25.400 - - -
- - - 38.100 - - -
- - 75.000 - - - -
ASTM D 422 BS 1377
Silt Clay Cobbles Gravel Sand Silt Clay
#NUM! #NUM! 0 0 2.00 24.24 73.76
0.0600 97.79
Silt max 0.0515 97.46
0.0020 73.76
Date : Depth :
Drawed : Checked :
1 1/4
200
100
1/2
3/4
1/4
80
40
20
10
2
4
3
0.074
0.42
0.84
12.7
0.149
0.177
2.00
4.76
8.35
25.4
76.1
19.1
50.8
30.1
mm
100
0
90
10
80
20
70 30
Retaining
Percentage
Percentage Passing
60 40
50 50
40 60
30 70
80
20
90
10
100
0
0.002
0.005
2
0.02
0.05
0.5
20
50
0.2
01
0.0
10
0.0
00
0.1
00
1.0
10.
00
0.0
00
10
0
Particle Size (mm)
Penentuan BJ Pasir
No. Penjelasan Sampel Pasir Unit
1 Berat Gelas Ukur + Pasir gr
2 Berat Gelas Ukur gr
3 Berat Pasir ( 1 - 2) gr
4 Volume Pasir cm3
BJ Pasir ( 3/4 ) (A ) gr/cm3
FAKTOR KALIBRASI =
PERHITUNGAN KADAR AIR
Penambahan air
Nomor Cawan 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3 1 2 3
Berat Cawan (gr)
Cawan + Tn Basah (gr)
Cawan + Tn Kering (gr)
Berat Air (gr)
Berat Tanah Kering (gr)
Kadar Air (%)
Kadar Air Rata - Rata (%)
PERHITUNGAN BERAT ISI KERING GS =
Sampel No. 1 2 3 4 5 6
Kadar Air Asumsi
Kadar Air, w (%)
Berat Tn + Mold (gr)
Berat mold (gr)
Diameter Mold (cm)
Tinggi Mold (cm)
Volume Mold (cm³)
Berat Tanah (gr)
Berat Isi (ϒ) (gr/cm³)
Brt Isi Kering (ϒ) (gr/cm³)
KURVA PEMADATAN
8.00
7.00
Kompaksi ZAV
Brt Isi Kering (ϒ) (gr/cm³)
6.00
5.00
4.00
3.00
MDD = gr/
2.00
OMC = %
1.00
0.00
0.00 1.00 2.00 3.00 4.00 5.00
Kadar Air (%)
LABORATORIUM MEKANIKA
TANAH CBR
RM
LABORATORIUM
UNIVERSITAS MERCU BUANA FO
Jalan Meruya Selatan No.1, Meruya Selatan
Project : Job No. :
Location : Sampel No. :
Date : Depth :
Tested : Checked :
Penetrasi 0
1 1
1 1
1 1
1 1
1 1
Brt Isi Kering (ϒ) (gr/cm³)
Beban (Lb)
1 1
0 0
0 0
0 0
0 0
0 0
0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1 0 0.1 0.2 0.3 0.4 0.5
Kadar Air (%) Penurunan (Inch)
Project :
O
F Job No. :
Location : Sampel No. :
Date : Depth :
Tested : Checked :
Perhitungan
ln (h0/h1)
a ×l 0 cm³
A×t 0 cm³
k
C. Hasil Pengujian
…..
PERMEABILITY TEST
:
:
:
: