GAZA CENTRAL WASTEWATER PROJECT

Contract 3 Gravity Pipelines

Measurements Table for Water Tightness Test


Building name: Interception Chamber Building No.:

Designed water level: 33.59 Actual water level: 33.59

Test Start Date: 07/04/2020 Test Finish Date: 09/04/2020

Difference between Designed and Actual water level (cm): 0.00


Interception Chamber Water Tightness Test Readings Consultant Contractor
Day #1 Day #2 Day #3 Signature Signature
1st 2nd 1st 2nd 1st 2nd
Room # Reading Reading Reading Reading Reading Reading
12:00pm 16:00pm 9:00am 16:00pm 10:00am 16:30pm
Water Level (m)
Room #1 (PS11) _ 1.254 1.254 1.255 1.247 1.247    
Room #2 (PS1) 1.077 1.074 1.063 1.061 1.057 1.055    
Room #3 (Slaughter House) 1.612 1.616 1.614 1.614 1.613 1.614    
Room #4 (PS 6A) 1.625 1.626 1.623 1.623 1.62 1.617    
Room #5 (PS 7b) 1.637 1.636 1.636 1.634 1.633 1.627    
Room #6 (PS9) _ 1.645 1.637 1.631 1.620 1.620    
Room #7 (Channel) 0.545 0.545 0.547 0.547 0.547 0.547    