NAMA : Ragil Triani Yunitra

NIM : 20180010042
PERENCANAAN PROYEK DAN KONTROL

SUMMARY OUTPUT

Regression Statistics
Multiple R 0.99596496344
R Square 0.9919462084
Adjusted R Square 0.9838924168
Standard Error 40238772.91416
Observations 9

ANOVA
df SS MS F
Regression 4 7.97695574E+17 1.994E+17 123.16512
Residual 4 6.47663538E+15 1.619E+15
Total 8 8.04172209E+17

Coefficients Standard Error t Stat P-value


Intercept -303839490.177 48480076.54663 -6.267306 0.0033074
(X1) 2353684.892109 685017.5222523 3.4359484 0.0263914
(X2) 2728613.108777 404510.4378141 6.7454702 0.0025177
(X3) 1309509.143502 944196.6962672 1.3869029 0.2377533
(X4) -70569.6279041 425054.345006 -0.166025 0.8761912

RESIDUAL OUTPUT

Observation Predicted (Y) Residuals


1 423685679.651 -5326270.65097 (X1) Re
2 272486837.6954 5644963.304628 80000000
3 636587824.6422 5813776.357809 60000000
Residuals

4 848483899.2454 67336234.75462 40000000


5 703245606.8978 -27773268.8978 20000000
0
6 452075981.6915 -2201860.69152
-20000000 50 100 1
7 355716765.183 -18190032.183 -40000000
8 1238651528.465 -27164137.4652
9 283798177.5287 1860595.471321

(X3) R
80000000
60000000
Residuals

40000000
20000000
0
(X3) R
80000000
60000000

Residuals
40000000
20000000
0
-20000000 10 20 30
-40000000
INTERPRESTASI
SUMARRY OUTPUT HASIL ANALISIS LINIER BERG
Significance F R squer = 0.992 yang berarti biaya pembangun
0.000193545882 nilai standard eror setelah melakukan analisis li
data yang di gunakan dalam melkaukan analisis

SUMARRY OUTPUT HASIL ANALISIS LINIER BERG


Lower 95% Upper 95% Lower 95,0% Upper 95,0%
-438441761.405 -169237218.95 -438441761.4 -169237218.95 Y=-304123664,8+(2350589,504*130) +( 272799
451771.3454768 4255598.438741 451771.345477 4255598.43874
1605512.083706 3851714.133847 1605512.08371 3851714.13385 Y=-304123664,8+305576636+399351690+4119
-1312001.15219 3931019.439196 -1312001.1522 3931019.4392
-1250709.68354 1109570.427731 -1250709.6835 1109570.42773 Y=423588525
dapat di prediksi total biaya pembangunan seb

(X1) Residual Plot (X2) Residual Plot


80000000 80000000
60000000 60000000
Residuals

40000000 40000000
20000000 20000000
0 0
-20000000 50 100 150 200 250 300 350 -20000000100 150 200 250 300
-40000000 -40000000
(X1) (X2)

(X3) Residual Plot (X4) Residual Plot


80000000 80000000
60000000 60000000
40000000
esiduals

40000000
20000000 20000000
0 0
(X3) Residual Plot (X4) Residual Plot
80000000 80000000
60000000 60000000
40000000

Residuals
40000000
20000000 20000000
0 0
-20000000 10 20 30 40 50 60 70 80 90 100 -20000000150 200 250 300 350 400 450 500
-40000000 -40000000
(X3) (X4)
HASIL ANALISIS LINIER BERGNDA,PADA TABEL REGRESSION STATISTICS DAPAT DI INTERPRESTASIKAN SEBGAI BERIKUT:
g berarti biaya pembangunan dapat di jelaskan oleh variable x.sebesar 99.2%
etelah melakukan analisis linier berganda ialah 40294714,18
n dalam melkaukan analisis ini adlah 9 data

HASIL ANALISIS LINIER BERGANDA DENGAN HIOPTESIS : Y= a+b.X1 + b.X2 + b.X3 + b.X4

50589,504*130) +( 2727998,431*146,39) + (1314047,951*31,35 )+ (-68569,28826*268,51)

5576636+399351690+41195403,3+ -18411539.6

al biaya pembangunan sebesar Rp.423.588.525

esidual Plot

0 200 250 300 350

(X2)

esidual Plot
esidual Plot

250 300 350 400 450 500 550 600

(X4)
NAMA : SITI WINDA NINGSIH
NIM : 20180010056
TUGAS : PERENCANAAN PROYEK DAN KONTROL (Estimasi Konseptual)

1. Lakukan analisis regresi linear berganda terhadap data pada tabel


dengan hipotesis: Y = a + b.X1 + b.X2 +b. X3 + b.X4 dan Interprestasikan
hasil analisisnya
2. Buatlah hipotesis didukung dengan data yang dianggap bisa dilakukan
analisis regresi, nyatakan alasannya

NO total biaya luas bangunan Luas Pekerjaan Volume Pekerjaan


bangunan Lantai Struktur Beton
(Y) (X1) (X2) (X3)
1 418,359,409 130 146.39 31.35
2 278,131,801 106 115.53 20.14
3 642,401,601 240 118.34 62.89
4 915,820,134 212 218.97 62.86
5 675,472,338 177 181.32 88.2
6 449,874,121 144 140.56 39.7
7 337,526,733 128 124.68 26.24
8 1,211,487,391 300 293.16 58.35
9 285,658,773 72 146 29.16

Interprestasi
Summary output hasil analisis regresi lienar, pada tabel Regression Statistics dapat di interprestasikan sebaga
1. R Square. = 0,991 berarti biaya pembangunan dapat dijelaskan oleh variabel X (luas bangunan) sebesar 99
2. Standard Error = 40238772,91 berarti model/rumus yang dihasilkan dari analisis regresi linear ini, apabila d
untuk estimasi konseptual biaya pembangunan ruko tingkat erorrnya/melesetnya prediksi sekitar Rp.402387
3. Observations = 9 ini berarti menunjukan bahwa data yang dianalisis adalah hanya 9 data
Summary output hasil analisis regresi lienar, dengan hipotesis Y = a + b.X1 + b.X2 +b. X3 + b.X4 , maka dapat
Coefficients sebagai berikut:
Y = a + b.X1 + b.X2 +b. X3 + b.X4
Y = -303839490,2+(2353684,892*130)+(2728613,109*146,39)+(1309509,144*31,35)+(-70569,6279*268,51)
y = -303839490,2+(422979035,96)+(399441673,027)+(41053111,6644)+(-18948650,79)
423685679.650966
Dapat di prediksi total biaya pembangunan sebesar Rp.423.685.679,7,-
JAWABAN
HIPOTESIS
Dengan diketahui luas bangunan, luas lantai, volume struktur beton, dan luas
dinding yang akan direncanakan maka akan diketahui berapa total biaya pembangunan
Alasan :Karena jika ingin mengetahui jumlah total biaya maka harus diketahui luas,dan volume

Variabel keputusan: Maka hipotesis dapat dinyatakan :


Luas Pekerjaan Variabel Terikat ( Y ) : Total Biaya Bangunan Y = a + b.X1 + b.X2 +b. X3 + b.X4
Dinding Variabel Bebas ( X ) :
(X4) X1 : Luas Bangunan (m2)
268.51 X2 : Luas Pekerjaan Lantai (m2)
209.36 X3 : Volume Pekerjaan Struktur Beton (m3)
421.09 X4 : Luas Pekerjaan Dinding (m2)
374.92
280.12
262.67
230.7
566.03
260.6

tics dapat di interprestasikan sebagai berikut:


riabel X (luas bangunan) sebesar 99,1%,
ri analisis regresi linear ini, apabila dipergunakan
lesetnya prediksi sekitar Rp.40238772,91,-
alah hanya 9 data
1 + b.X2 +b. X3 + b.X4 , maka dapat diinterprestasikan pada tabel

144*31,35)+(-70569,6279*268,51)
18948650,79)
eton, dan luas
al biaya pembangunan
rus diketahui luas,dan volume

otesis dapat dinyatakan :


X1 + b.X2 +b. X3 + b.X4