Background

Since beginning of 20th century slums existed in


Mumbai e.g. Dharavi, Matunga labour camp, etc.

Pre & Post independence people from all corners of


country came in search of job.

Mumbai was the city of Employment opportunity

Slum became the culture of Mumbai

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 3
Approach

Approach – I (1950 – 1970)


• Approach was to remove the slums and protect the land.
• The Influx of migrant labor was so huge therefore the efforts to protect even private land
proved futile
• Large Area of public land encroached by slums
Approach – II (1970 – 1990)
• Since the removal and control of slum proved futile the humanitarian approach to
recognize the slum was consider.
• The Maharashtra Slum Area (Improvement, Clearance & Redevelopment) Act, 1971 came
in existence.
• Census of hutments carried out in 1976 and Identity Card/Photo passes issued to Slum
Families.
• Basic amenities such as water, drainage, toilet, pathways, street light were provided in
slum area.
• Slum Up-gradation program was implemented with World Bank assistance in mid 1980.
• Slum land given on lease of 30 yrs to the co-operative society of slum dwellers at a
nominal lease rent.
• Soft loans for renovation of individual structures on as is where is basis was provided.
• Redevelopment of slum dwellers was also initiated in Dharavi under PMGP.
© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 4
Approach…

Approach – III (1991-1995)

• Redevelopment of slums started under SRD by making provision in Act and Rules.
• Under DCR No. 33 (10) redevelopment of slum through owners/ developers /co-operative housing
societies of slum dwellers/NGO was made permissible for censuses slum or slum dweller whose name
appeared in the Electoral Roll of 1985 with FSI upto 2.5.
• The Scheme proved not effective.

Approach – IV (1995 Onward)

• Formation of AFZULPURKAR COMMITTEE which recommended Slum Rehabilitation scheme.


• Committee estimated 80% slum rehabilitation is possible in situ.
• Committee relies on philosophy that “if inequality has to be removed there has to be unequal law” as
giving free tenements to slum dwellers is not supported by housing philosophy but slum dwellers
deserve this preferential unequal treatment to bring them into mainstream of social, cultural and
economic fabric of this pulsating city.

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 5
Fact Finding Of Committee

Slums and hutments are integral part of Mumbai.

All have contributed to the industrial, economic and commercial growth of Mumbai.

Houses in mumbai always remain unaffordable since british time therefore slum
growth.

To enhance their standard of living, an authorized dwelling unit is a first step in the
right direction

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 6
Formation of
Slum Rehabilitation Authority

Government launched comprehensive


Slum Rehabilitation Scheme in December 1995

Slum tenements are provided to slum


Using land as resource
dwellers at ZERO Cost

Formation of Slum
Rehabilitation Authority
in December 1995
To cross subsidize the cost of Slum
Tenements constructed in sale
Rehabilitation tenements, the incentive
component are allowed to be sold in
FSI is given for construction of sale
open market
tenements

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 7
Challenges as on 1995

Total 8 Lacs of Families staying in slum.

Population staying in slum is about 40 Lacs.

Rehabilitation of the above population as early as possible.

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 8
Implementation of Scheme
: Process

The Slum dwellers co-operative society “select” developer to implement the scheme

Eligibility of Slum Dweller: Must be slum dweller as on 1.1.2000 earlier it was 1.1.1995

Such developer shall have 70% consent of Eligible Slum dwellers family

The Project submitted by such developer with 70% consent is admitted by SRA

The proposal is scrutinized and if in order is accepted for further process

The scheme is implemented in two part Rehab and Sale Component

The Developer is allowed to construct sale component to meet his expenditure & profit

The Eligible slum dwellers get 25.00 sq. mtr. tenement free of cost

The Non-Eligible slum dwellers are removed from the land


© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 9
Slum Rehabilitation Schemes
: Types

1. In situ rehab scheme : Under Provision of D.C.R 33(10)


• Rehabilitation is done at site of slums.

2. PAP tenement scheme: Under provisions of D.C.R 33(10) clause 3.11


• This scheme is meant for slum dwellers whose rehabilitation
is not possible in-situ due to physical constraints like vital
projects, footpaths, hillocks, etc.

3. Permanent Transit Tenement Scheme: Under provisions of


D.C.R 33(14)D
• Permanent Transit Tenement are constructed in situ by giving
incentive FSI
© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 10
Slum Rehabilitation Schemes
: Features

No financial burden on Government.


Slum dwellers get a self contained 25 sq. mtr. i.e. 269 sq. ft. (earlier
225 sq. ft) carpet area tenement free of cost consisting of living room,
kitchen/alcove, bed room, bath & WC.
Underlying land is the resource for the scheme
Cost of construction of the rehabilitation tenements is cross-
subsidized from the sale of free sale tenements in the open market.
The entity developing the slum rehabilitation scheme is entitled to
free sale component in proportion to the rehab component.
FSI upto 3 can be consumed for tenement density of 500 to 650
tenements per hector in situ , as against 1.33 / 1.00 FSI available for
general sites.
FSI upto 4 can be consumed for tenement density of more than 650
tenements per hector in situ with prior Govt. approval , as against
1.33 / 1.00 FSI available for general sites.
© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 11
Slum Rehabilitation Schemes
: Features

Every slum structure existing as on 1/1/2000 or prior thereto is eligible


70% of the eligible slum dwellers in a slum can come together to form a
society for implementation of slum rehabilitation scheme.
Rehab tenement allotted to a slum dweller cannot be sold for a period of 10
years from the date of allotment. However it can be transferred to a legal heir
with prior permission of CEO (SRA)
A sum of Rs. 20,000/- per tenement is recovered as maintenance deposit
from the developer for subsidizing the monthly maintenance of the rehab
building
For every 1.0 sq.mt. of rehab component construction, sale built up area
allowed is Rehab 1.33 sq.mt.
1.0 sq.mt. 1.0 sq.mt.
0.75 sq.mt.

City Suburbs Dharavi


© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. Max. FSI consumption allowed on plot is 3 12
Slum Rehabilitation Schemes
: Status At a Glance

Particular 33(10) 3.11 33(14)D Total

No of S.R. scheme
1,233 51 120 1,404
sanctioned LOI Issued

No of tenement proposed
3,36,725 1,26,343 8,569 4,71,637
to be constructed

No of tenement approved 2,20,351 1,24,704 8,213 3,53,268

No of tenement under
1,39,619 81,089 5,860 2,26,568
construction

No of Tenements OCC
85,159 75,225 1,992 1,62,366
granted
© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 13
Slum Rehabilitation Schemes
: Objectives

8 Lacs families were targeted for rehabilitation


Protection of slum dweller existed as on 1/1/2000
Rehabilitation of protected slum dwellers in permanent
tenement
Rehab Tenement free of cost
Upgrading standard of living and eradicating slums
No Financial burden on Government
Empowering the slum dwellers

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 14
Slum Rehabilitation Schemes
: Status against Set Objectives

Approximate 12 Lacs families living in slum as against 8


Lacs targeted
3,293 slum cluster were identified
1.58 Lacs tenements constructed so far
1,25,907 tenements were occupied
Constructions of 3 Lacs tenements are in pipeline
Rs. 583 Crs revenue generated for MCGM & MHADA

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 15
Slum Rehabilitation Schemes
: Bottlenecks in achieving Objectives

Slum Dwellers Related issues:


Land owner's are neither submitting scheme nor giving consent
for the scheme
To obtain 70% consent from slum dwellers
To deal with non consented slum dwellers
To deal with consented but non-co-operative slum dwellers
Eviction of large nos. of non eligible slum dwellers (33/38)
Developer Related Issues :
Non-performing developer (partner's dispute)
Problem in raising of finance
© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 16
Slum Rehabilitation Schemes
: Bottlenecks in achieving Objectives

Policy Related issues:


CRZ Area
NOC from MOEF /Civil Aviation Dept./Navy/Defense/Wireless Station etc.
No policies for Central Govt. Land
S.R. Scheme in difficult area (hilly area)
Scheme on RG/PG (DP Reservation)
Commercial unit having more area are eligible only up to 225 sq. ft. irrespective
of their more area & planning constraints
Non-availability of adequate transit camps or alternate accommodations
Various departmental competent authorities

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 17
Slum Rehabilitation Schemes
: Way Forward

Policy regarding slum on Land owned by Central Govt.


Slum area is to be considered as a residence zone in new proposed
DP.
Granting Incentive FSI for construction of affordable housing
Giving time period to submit schemes or else tender
Breaking eligibility and consents / consent through secret ballot
Town planning Schemes
Wholesome GIS based survey of entire city for the identification of
eligible slum dwellers
To address issues of Non-Eligible slum dweller : Needs a Policy for
Hybrid scheme
Pro-active development rather than reactive responses
Declaring slum like places at one go

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 18
Slum Rehabilitation Schemes
: Way Forward

Administrative reforms for better accountability and target


assigning
Process to be simplified
For identification of Eligible slum dwellers
For Eviction of non co-operative slum dwellers – Once
scheme is sanctioned through majority consents
For acquisition of land

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 19
Slum Rehabilitation Schemes
: Way Forward

eGovernance Initiatives
Development of Slum MIS (by conducting Biometric Survey of
each hutment) and seamless Integration with GIS Base Map
Creating Rehabilitation Database and conducting biometric
survey of existing beneficiaries of SRA Schemes.
Customized application for SRA office - For end to end
computerization of SRA workflow
Automation of building plan approval as per DCR and
Online lottery management system
Revamping of existing SRA website as per GoM and GoI
guidelines
Setting up of Data Center in SRA premises for hosting various
eGovernance Application of SRA

© 2014 KPMG Advisory Services Private Limited, an Indian Partnership and a member firm of the KPMG network of independent member firms affiliated with KPMG International Cooperative (“KPMG
International”), a Swiss entity. All rights reserved. 20
Thank You 21

You might also like