Date
Scope of Works Sub-Contractor Completion Rate
Downpayment Mobilization
PREPARED BY:
PAUL BANDILLA
Superintendent, FSC- Zambo
CHECKED BY:
- Dry-docking Area (First Picture) and Ship Building Area (Second Picture)
- Waiting for Supplementary Quotations on Sloping works & Dockway entrance conreting
Scope of Works: PERIMETER FENCING Status as of: 25 Mar 2020
Contractor: DOUBLE E Community Quarantine Start: 20 Mar 2020
- Fence construction of the left portion of yard; along the gutter of Technical
and Office Bldg
Scope of Works: TECHNICAL SHOPS (MACHINE SHOP/WAREHOUSE) Status as of: 25 Mar 2020
Contractor: MEGALITH Community Quarantine Start: 20 Mar 2020
- Temporary warehouse for Legendary Seven's materials & equipment (1st picture)
- Construction of foundation of the Panel Boards & electrical components' pedestals.