: Page: 2 of 2
2X30 MW Coal Fired Power Plant Project PLI-EDP-JRA-CFPPP-Add-04 PT. PUNJ LLOYD INDONESIA
1 Operation of heavy Air pollution/Polusi Hi Po U - All operation equipment shall be have valid Se Vu A Site supervisor
equipment and power udara testing for air emission and the rate shall be as Maintenance
equipment (Welding per government regulation No. 5 Year 2006 In charge
regarding Gas emission limit and Government
machine, power
Regulation No. 41 Year 1999 regarding Air
generator etc) at work Quality Management/Semua peralatan yang
location/Pengoperasi beroperasi harus memiliki hasil uji test emisi
an alat berat dan yang masih berlaku dan berdasarkan peratuan
peralatan penghasil pemerintah No. 5 Tahun 2006 tentang Batas
tenaga (Mesin las, ambang gas buang dan peraturan pemerintah
generator dll) tentang pengaturan qualitas udara
- Close supervision by site
supervisor/maintenance dept to check and
regular maintenance of the equipment/pengawas
yang baik oleh penyelia lapangan/dept.
perawatan untuk memeriksa dan melakukan
perawatan berkala terhadap peralatan yang
dioperasikan
Approval of JRA conclusion (1): Name Signature:
NOTE
1. (P) Probability: 2. (S) Severity 1. Acceptance (A) No immediate action required other than the existing
Probable (Pr) Minor (Mi) Probable (Pr) T U U U reduction measures listed
Possible (Po) Moderate (Mo)
Unlikely (Un) Serious (Se) Possible (Po) A T U U
Very Unlikely (Vu) Major (Hi)
2. Tolerable (T) Hazard to be investigated, with a view to further
Unlikely (Un) A A T U reducing the risk. Risk control measures must be defined and
Probability
Severity