Revision: B Sts:
PT. MAKMUR SEJAHTERA WISESA
Rev Date: nd
2 Feb’10 IFA
Job Description: General work Activities
RESIDUAL
INITIAL RISK RISK CONTROL ACTION TARGET COMPLETION
No TASK HAZARD RISK FOLLOW UP
MEASURES PARTY DATE DATE
S P R S P R
Revision: B Sts:
PT. MAKMUR SEJAHTERA WISESA
Rev Date: nd
2 Feb’10 IFA
Job Description: General work Activities
RESIDUAL
INITIAL RISK RISK CONTROL ACTION TARGET COMPLETION
No TASK HAZARD RISK FOLLOW UP
MEASURES PARTY DATE DATE
S P R S P R
Revision: B Sts:
PT. MAKMUR SEJAHTERA WISESA
Rev Date: nd
2 Feb’10 IFA
Job Description: General work Activities
RESIDUAL
INITIAL RISK RISK CONTROL ACTION TARGET COMPLETION
No TASK HAZARD RISK FOLLOW UP
MEASURES PARTY DATE DATE
S P R S P R
- Injury To dilihat.
personnel. - Install Proper Lighting at
- Personil Pedestrian area.
cedera - Pemasangan lampu ditempat
pejalan kaki.
- Toolbox talk Shall be done
before starting work.
- Melaksanakan Toolbox talk
sebelum melakukan pekrjaan.
- Maintain housekeeping
souranding work area, install
sufficient light and stop activity if
any found hazard, keep away
from object and inform to
supervisor
- Menjaga kebersihaan
dilingkungan kerja, pemasangan
lampu yang cukup dan
berhentikan pekerjaan bila
menemukan bahaya menjauh
dari objek tersebut dan segera
laporkan kepada supervisor.
- Stand by Stretcher to be
provided at work location to
evacuate the victim.
- Harus ada tandu yang disiapkan
dilokasi kerja untuk evakuasi
korban.
If rain, or extrim Se Po U Mo Un A Site Supervisor
weather./ Jika If persons is exposed to a snake, Foreman
Hujan atau or bee bite immediatly bright to
cuaca yang First Aid Centre./ Jika ada yang
extrim. tergigit ular atau lebah segera
bawakan ke clinic untuk
- Health pertolongan pertama.
effect to the
worker/Efek Stand by first aider at work
kesehatan location/stand by personil untuk
Installation: Night shift activity System No. : Page: 5 of 5 PT. PUNJ LLOYD INDONESIA
Revision: B Sts:
PT. MAKMUR SEJAHTERA WISESA
Rev Date: nd
2 Feb’10 IFA
Job Description: General work Activities
RESIDUAL
INITIAL RISK RISK CONTROL ACTION TARGET COMPLETION
No TASK HAZARD RISK FOLLOW UP
MEASURES PARTY DATE DATE
S P R S P R
NOTE
1. (P) Probability: 2. (S) Severity Probable (Pr) T U U U 1. Acceptance (A) No immediate action required other than the existing
Probable (Pr) Minor (Mi) reduction measures listed
Possible (Po) Moderate (Mo) Possible (Po) A T U U
Unlikely (Un) Serious (Se)
Probability
Very Unlikely (Vu) Major (Hi) Unlikely (Un) A A T U 2. Tolerable (T) Hazard to be investigated, with a view to further reducing the
Very Unlikely risk. Risk control measures must be defined and residual risk must be re-
A A A T assessed
(Vu)
3. (R) Real Minor Moderate Serious Major 4. Unacceptable (U) Task must be redefined or risk control measures must
(Mi) (Mo) (Se) (Hi) be taken to substantially reduce the risk
Severity