Contract No.

: ND/2019/07
Contract Title: Fanling North New Development Area, Phase 1: Site Formation and Infrastructure Works
Risk Assessment Report - RA0019 General Lifting Operation
Assessed by: Samson LAW Date of this document: 07-12-2021 Date of last document: 07-06-2021 Rev:01
(Safety Officer)

The Australian / New Zealand Standard ISO 31000:2009 Risk Management will be used as the guidance for risk assessment. Please refer to the ' SP-S7-FM02 – Example of Risk Definition and
Classification’

C Consequences

RR Risk Rating
L Likelihood
RRR
Person to be PPE
Activities Hazard Identified Control Measures Training Required Action/ Monitor by Priority Residual
Affected (nos.) Required
Risk Rating

1. General  Heat Related Worker C 3 H 1. Set up a sheltered resting area near the work location. Heat stroke/ HIA Construction Team 1 L
Illness 2. Provide portable fans to enhance ventilation to the workers at the Leader/
work location and resting area. Site Engineer/
3. Ensure that the workers are adequately trained on the symptoms of Safety Officer/
heat stroke, the precautionary measures and the emergency Safety Supervisor
response actions. (Monitor)
4. Take heed of weather report. In case of “Very Hot Weather General Foreman/
Warning”, high UV index or humid weather, reschedule the heavy Foreman
work avoid working under direct sunlight if practicable, and arrange
an appropriate break at regularly intervals.
5. Remind workers to take plenty of water and stay alert of their
physical conditions.
6. Provide drinking water at easy assessable designed areas.
7.
Slipping / Worker C 2 M 1. Keep all passageway, landings and means of escape clear and Safe Access/ HIA 1 L
 Tripping unobstructed at all time.
2. Do not leave tools on the working area.
3. Maintain good housekeeping at all time.
4. Remove the protruding nails.

 Behavioral Based Worker D 3 M 1. Briefing on Safe Work Procedures. General Duties/ 1 L


Safety 2. Toolbox Talk before work commences. HIA
3. Communicate efficiently to works with the language that they
understand.

 Thunder storm Worker D 5 E 1. Stop all outdoor work if thunderstorm warning signal is hoisted. Adverse weather/ 1 L
cause injury 2. Provide with thunder storm detector to forecast and detector HIA
thunder storm.

Page 1 of 6
Contract No.: ND/2019/07
Contract Title: Fanling North New Development Area, Phase 1: Site Formation and Infrastructure Works
Risk Assessment Report - RA0019 General Lifting Operation
Assessed by: Samson LAW Date of this document: 07-12-2021 Date of last document: 07-06-2021 Rev:01
(Safety Officer)

The Australian / New Zealand Standard ISO 31000:2009 Risk Management will be used as the guidance for risk assessment. Please refer to the ' SP-S7-FM02 – Example of Risk Definition and
Classification’

C Consequences

RR Risk Rating
L Likelihood
RRR
Person to be PPE
Activities Hazard Identified Control Measures Training Required Action/ Monitor by Priority Residual
Affected (nos.) Required
Risk Rating

2. Lifting Operation  Collapse of crane Operator C 4 E 1. Maintain good communication with relevant parties, use walkie- Safe use of Safety Construction Team 1 L
Worker talkie. excavator / crane Helmet Leader/
2. Do not exceed SWL. Reflective Site Engineer/
3. Ensure all LA & LG are tested and examined by RPE and the vest Safety Officer/
certificates are still valid. Safety Shoes Safety Supervisor
4. Check the landing ground before lifting operation by the Crane (Monitor)
Operator. General Foreman/
5. Fence off lifting zone by the Workers. Foreman
6. Carry out weekly inspection of crane and fill in the statutory form by (Action)
the Crane Operator.
7. Check all LA & LG before use & ensure that it is well maintained by
the Rigger.
8. Appoint competent and experienced banksman/rigger to handle
lifting operation.
9. Appoint Lifting Supervisor should station on spot to supervise the
operation.
10. To follow plant permit system and permit to lift for lifting operation by
the Lifting Supervisor.

 Falling objects Banksman C 4 E 1. Barricade the working area with warning sign by the Workers. HIA training 1 L
Worker 2. Secure the load before lifting by the Rigger.
3. Apply permit to operate.
4. Select correct length sling to comply with max 60 degrees included
angle of slings by the Rigger.
5. Prohibit any person from staying underneath suspended load by the
Lifting Supervisor

Page 2 of 6
Contract No.: ND/2019/07
Contract Title: Fanling North New Development Area, Phase 1: Site Formation and Infrastructure Works
Risk Assessment Report - RA0019 General Lifting Operation
Assessed by: Samson LAW Date of this document: 07-12-2021 Date of last document: 07-06-2021 Rev:01
(Safety Officer)

The Australian / New Zealand Standard ISO 31000:2009 Risk Management will be used as the guidance for risk assessment. Please refer to the ' SP-S7-FM02 – Example of Risk Definition and
Classification’

C Consequences

RR Risk Rating
L Likelihood
RRR
Person to be PPE
Activities Hazard Identified Control Measures Training Required Action/ Monitor by Priority Residual
Affected (nos.) Required
Risk Rating

2. Lifting Operation  Failure of lifting Operator C 4 E 1. Barricade the working area with warning signs by the Workers. Lifting operation Reflective Construction Team 1 L
(Con’t) appliance due to : Worker 2. Crane tested by RPE with valid certificate displayed at prominently vest Leader/
 Overloading area. Site Engineer/
3. Secure the load before lifting by the Rigger. Safety Officer/
 Malfunction of 4. Carry out weekly inspection of crane and fill in the statutory form by Safety Supervisor
safety device the Crane Operator. (Monitor)
5. Appoint competent and experienced operator/banksman/rigger to General Foreman/
handle lifting operation by the Lifting Supervisor. Foreman
6. Apply permit to operate and plant permit system. (Action)
7. Check the lifting appliance before operation by the Crane Operator.
8. Prohibit to turn on bypass button.

 Failure of lifting Operator C 4 E 1. Lifting gear tested by RPE with valid certificate Lifting operation Reflective 1 L
gear due to : Rigger 2. Secure the load before lifting by the Rigger vest
 Overloading Worker 3. Hook should install safety latch
4. Apply permit to operate system
 Improper
5. Appoint competent and experienced banksman/rigger for lifting
connection to
operation by the Lifting Supervisor.
object being
lifted 6. Prohibit any person from staying underneath suspended load by the
Lifting Supervisor.

 Improper manual Worker/ C 3 H 1. Use trolley or machine to deliver materials by the Workers Manual Handling/ Gloves if 1 L
handling posture Drain layer 2. Maintain proper posture in manual handling process by the HIA necessary
(back injury) Workers.
3. Provide manual handling training to .
4. Arrange team work to perform manual handling process by the
Ganger.

Page 3 of 6
Contract No.: ND/2019/07
Contract Title: Fanling North New Development Area, Phase 1: Site Formation and Infrastructure Works
Risk Assessment Report - RA0019 General Lifting Operation
Assessed by: Samson LAW Date of this document: 07-12-2021 Date of last document: 07-06-2021 Rev:01
(Safety Officer)

The Australian / New Zealand Standard ISO 31000:2009 Risk Management will be used as the guidance for risk assessment. Please refer to the ' SP-S7-FM02 – Example of Risk Definition and
Classification’

C Consequences

RR Risk Rating
L Likelihood
RRR
Person to be PPE
Activities Hazard Identified Control Measures Training Required Action/ Monitor by Priority Residual
Affected (nos.) Required
Risk Rating

2. Lifting Operation  Struck by Moving Operator C 4 E 1. Barricade the working area with warning signs. HIA Training Reflective Construction Team 1 L
(Cont’d) plant Worker 2. Plant operated by licensed operator. vest Leader/
3. Provide training before commencement of works. Site Engineer/
4. Provision of banksman to guide the plant moving. Safety Officer/
5. Maintain access clear. Safety Supervisor
(Monitor)
General Foreman/
3. Lifting operation  Failure & Collapse Workers (2), C 3 H 1. Appoint and trained licensed operator to operate lifting appliance. Lifting Operation/ -- Foreman 1 L
by Mobile Crane of LA & LG Operator (1) 2. Inspect and sign Form 1 weekly. Lifting Gear (Action)
3. Extend all out-riggers as necessary.
4. Use only lifting gear without defect and with RPE certificate Form
6 & 7.
5. Apply correct color coding to lifting gear.
6. Protect any sharp edge to avoid wounding lifting gear.
7. Ensure safety latch in place on the hook of the crane jib.
8. Check before use to ensure the LA & LG were examined and test
by RPE and the certificates are still valid.
9. Check all the LA & LG before use & ensure that it is well
maintained.
10. Do not exceed the SWL and allowable lifting angle.
11. Placed on the stable ground floor.

 Fall of lifting Workers (2), C 3 H 1. Using proper buckets/ container to carry small construction Safety 1 L
object Operator (1) component / parts. Helmet
2. Fence off works area and display warning sign. Reflective
3. Ensure safety latch in place on the hook of the crane jib. vest
4. Rig materials securely. Safety Shoes
5. Ensure all workers wear safety helmet.

Page 4 of 6
Contract No.: ND/2019/07
Contract Title: Fanling North New Development Area, Phase 1: Site Formation and Infrastructure Works
Risk Assessment Report - RA0019 General Lifting Operation
Assessed by: Samson LAW Date of this document: 07-12-2021 Date of last document: 07-06-2021 Rev:01
(Safety Officer)

The Australian / New Zealand Standard ISO 31000:2009 Risk Management will be used as the guidance for risk assessment. Please refer to the ' SP-S7-FM02 – Example of Risk Definition and
Classification’

C Consequences

RR Risk Rating
L Likelihood
RRR
Person to be PPE
Activities Hazard Identified Control Measures Training Required Action/ Monitor by Priority Residual
Affected (nos.) Required
Risk Rating

3. Lifting operation  Crush on body Workers (2), C 3 H 1. Ensure all workers wear reflective vest. Reflective Construction Team 1 L
by Mobile Crane Operator (1) 2. Ensure rear mirrors of the lifting appliances are in place. vest Leader/
(Cont’d) 3. Use a guiding rope to stabilize the lifting members. Site Engineer/
4. Appointed signaler/banksman should guide the operator in the Safety Officer/
lifting process. Safety Supervisor
5. Appoint Lifting Supervisor should station on spot to supervise the (Monitor)
operation. General Foreman/
Foreman
4. Working under  Strong wind, Operator (all) C 3 H 1. Aware of the weather forecast from HK Observatory. Working in - (Action) 2 L
inclement and heavy rainstorm, Workers (all) 2. The work must be stopped under adverse weather. adverse weather /
hot weather Heat stroke
thunderstorm, 3. Physical check and require worker to report their health status
precaution
lighting storm and before working when’ very hot weather warning is hoisted.
tropical cyclones 4. Avoid workers work under direct sunshine during hot time or provide
 Heat Stroke shelter to prevent direct sunshine.
5. Provided adequate drinking water.
6. Arrangement of rest time let works to take break after reasonable
interval of working.
7. Provide shelter for workers to take break.
8. Worker to wear loose and light color clothing.

Page 5 of 6
Contract No.: ND/2019/07
Contract Title: Fanling North New Development Area, Phase 1: Site Formation and Infrastructure Works
Risk Assessment Report - RA0019 General Lifting Operation
Assessed by: Samson LAW Date of this document: 07-12-2021 Date of last document: 07-06-2021 Rev:01
(Safety Officer)

The Australian / New Zealand Standard ISO 31000:2009 Risk Management will be used as the guidance for risk assessment. Please refer to the ' SP-S7-FM02 – Example of Risk Definition and
Classification’

C Consequences

RR Risk Rating
L Likelihood
RRR
Person to be PPE
Activities Hazard Identified Control Measures Training Required Action/ Monitor by Priority Residual
Affected (nos.) Required
Risk Rating

4. Working under  Flash Flooding Workers (all) D 4 H 1. Listen to the rainstorm signals by the Observatory thro’ radio, smart Inclement Rain boots Construction Team 1 L
inclement and due to heavy rains phone apps, or internet. Weather Leader/ Safety
hot weather 2. Check any misplacement of debris which would be washed down to Officer (Monitor)
(Cont’d) block the underground drainage inlet during rainstorms. General Foreman /
3. Pay attention to rainstorm warning signals. Foreman
4. Persons should carefully consider weather and conditions of site. (Action)
5. All plants should park on higher location area.
6. Fenced off the working area.
7. Sufficient dewatering pumps should be ready on site.

Revision No. 0 1 2 3 4 5 6 7 8

Date 07-06-2021 07-12-2021

Prepared by Safety Officer Samson LAW


Samson LAW
Checked by Construction Team Leader
Mac CHOW
(Road & Drainage) Mac CHOW

Approved by Site Agent Daniel WONG


Daniel WONG
Remarked: Risk assessment reviewed at 6 months interval.

Page 6 of 6