DAILY PROGRESS REPORT
Material / Tools
Manpower Total Equipment Involve Total
Description Issued Remarks
1. Project Manager Excavator 1 Gerinda 7" 2 ea
2. Supervisor 2 Dozer Kabel power 50 m
3. HSE Man & Leader Crane Semen sika grout 2 sak @25 kg
4. Permit Holder Light Vehicle 1 Sika cim 2 ltr
5. Engineer & QC Ambulance Archo 1 ea
6. Medic Pick up 1 Palu 2 ea
7. Driver Ambulance Tower Lamp Kayu 4 btg
8. Surveyor Trailer Cangkul 2 ea
9. Labour 6 Dump Truck 1 Gergaji 2 ea
10. Wakar / PK Vibro Meteran 2 ea
11. Operator Exca Baby roller Cetok 1 ea
12. Operator Crane Mixer 1 ea
13. Sinyal Man Pasir 3 sak
Page 2 of 5
DAILY PROGRESS REPORT
14. Electrician
15. Rigger
16. Operator Baby Roller
17. Operator Trailer
18. Operator Dump Truck 1
19. Welder
Jumlah 9
Qty
Indicator Remark
Prev Today Total
1. POB #REF! 9 #REF!
2. Manhours #REF! 90 #REF!
Progress Summary
Progress Qty Progress (%)
Activity Name Qty Remarks
Prev Today Cum. Previous (%) Today (%) Cum.
- Repair drainase Completed
- Cutting concrete for
contruction joint
- House keeping area
SOCIAL ISSUE
Problem Solution
Curring concrete di stop PPT (update permit to spark potensial - Harus membuat permit finishing spark potensial di area 400 net pit
Page 3 of 5
DAILY PROGRESS REPORT
Page 4 of 5
DAILY PROGRESS REPORT
Photo's Activities
Page 5 of 5