You are on page 1of 5

DAILY PROGRESS REPORT

Starting Date : #REF! SI Number : RFS/GMIV/XI/003/17


Date : #REF!
Project Name : #REF!

HEALTH, SAFETY & ENVIROMENT


HSE Key Performance Indicator
HSE Activities Today Total Total
Decription Decription
Today Cum. Today Cum.
- General toolbox meeting at PB 38 Toolbox meeting 1 #REF! Near Miss
- TBM at 400 area Equipment Inspection 1 #REF! First Aid
- Monitoring activity PPE Inspection 1 #REF! Medical Treatment
- EPTW & EJSA FE Inspection #REF! LTI
Safety Patrol / Walk Through Property Damage
Emergency Drill Enviroment Case
Training
Safety Induction Internal
Safety Meeting
UCUX #REF!
PROJECT ACTIVITIES
Description
Activity Today Location Weather condition Overtime Next Activity Area
- Repair drainase Neutralizer pit Sunny 400 area
- Curring concrete for sealent contruction joint
- House keeping

Page 1 of 5
DAILY PROGRESS REPORT

Starting Date : #REF! SI Number : RFS/GMIV/XI/003/17


Date : #REF!
Project Name : #REF!

Type of Work Permit


Status Total
Description No. Permit
Open Close Today Cum.
- Civil activity & heavy equipment operation at net pit 28332 1/23/2018 1 1

Material / Tools
Manpower Total Equipment Involve Total
Description Issued Remarks
1. Project Manager Excavator 1 Gerinda 7" 2 ea
2. Supervisor 2 Dozer Kabel power 50 m
3. HSE Man & Leader Crane Semen sika grout 2 sak @25 kg
4. Permit Holder Light Vehicle 1 Sika cim 2 ltr
5. Engineer & QC Ambulance Archo 1 ea
6. Medic Pick up 1 Palu 2 ea
7. Driver Ambulance Tower Lamp Kayu 4 btg
8. Surveyor Trailer Cangkul 2 ea
9. Labour 6 Dump Truck 1 Gergaji 2 ea
10. Wakar / PK Vibro Meteran 2 ea
11. Operator Exca Baby roller Cetok 1 ea
12. Operator Crane Mixer 1 ea
13. Sinyal Man Pasir 3 sak

Page 2 of 5
DAILY PROGRESS REPORT

Starting Date : #REF! SI Number : RFS/GMIV/XI/003/17


Date : #REF!
Project Name : #REF!

14. Electrician
15. Rigger
16. Operator Baby Roller
17. Operator Trailer
18. Operator Dump Truck 1
19. Welder
Jumlah 9
Qty
Indicator Remark
Prev Today Total
1. POB #REF! 9 #REF!
2. Manhours #REF! 90 #REF!

Progress Summary
Progress Qty Progress (%)
Activity Name Qty Remarks
Prev Today Cum. Previous (%) Today (%) Cum.
- Repair drainase Completed
- Cutting concrete for
contruction joint
- House keeping area

SOCIAL ISSUE
Problem Solution
Curring concrete di stop PPT (update permit to spark potensial - Harus membuat permit finishing spark potensial di area 400 net pit

Page 3 of 5
DAILY PROGRESS REPORT

Starting Date : #REF! SI Number : RFS/GMIV/XI/003/17


Date : #REF!
Project Name : #REF!

Page 4 of 5
DAILY PROGRESS REPORT

Starting Date : #REF! SI Number : RFS/GMIV/XI/003/17


Date : #REF!
Project Name : #REF!

Photo's Activities

Prepared by, Aknowledge by


PT. PETRONESIA BENIMEL EMCL-Production Project Team

Page 5 of 5