You are on page 1of 2

Ref.

2020/3/7/7610A
7 March 2020

BILLING

MS. CHRISTINA DELA CRUZ


Block 14 Lot 5 Highlands Pointe 2,
Havila, Taytay Rizal

Labor cost with Supervision for Ms. Christina Dela Cruz Residence

Dear Madam,

Labor and Installation cost with Supervision: Php 30,000.00 only

Please settle the remaining balance Php 20,000.00 only for the following
scope of work:

1. Installation of Roof heat insulation for the whole roof under purlins installation
procedure.
2. Provide manhole for ceiling
3. Relocation / Removal and Repair of floor drain and water supply for washing machine
inside the room
4. Provision of water drain hole within the perimeter wall to prevent flooding
5. Provision and installation of Exhaust fan for Helper’s toilet
6. Purchasing of client supplied materials
7. Transportation and communication cost

Note:

Received Partial payment dated March 5, 2020: Php 10,000.00 only

Prepared by: Conforme:

ARCH. EDMIL D. GOMEZ MS. CHRISTINA DELA CRUZ


Architect Client / Owner

Address: Block 16 Lot 8 Jefferson st., Custa Verde Executive Village, Antipolo City, Philippines M: +63 939.526.1920 or +63 917.376.1920
Email: edgomezdesignconst@gmail.com
Date:

Address: Block 16 Lot 8 Jefferson st., Custa Verde Executive Village, Antipolo City, Philippines M: +63 939.526.1920 or +63 917.376.1920
Email: edgomezdesignconst@gmail.com