PERJANJIAN INFRASTRUKTUR PUTRAJAYA:

SENARAI SEMAK SURAT/DOKUMEN BAGI FUTURE INFRASTRUCTURE WORKS DAN ON-GOING INFRASTRUCTURE WORKS.

A. FUTURE INFRASTRUCTURE WORKS – JABATAN KERJA RAYA

Tarikh
Surat/Doc Surat/Doc Surat/Doc
Bil. Keterangan Kontraktor CPC
CPC ke JKR EOT ke JKR CMGD ke JKR Nota
PJH/JKR

Earthwork Precinct 12 (6.2.54*)


Asia Baru 02/02/16 √ √
1. -
Sdn Bhd 19/3/19 2/10/18
Roadwork Precinct 12 (3.1.99*)

Green Connector Precinct 17


(3.1.161) 18/7/18 –

Lion Pacific 23/08/17 √ CPC Doc
2. 19/7/18 -
Green Connector Precinct 6 Sdn Bhd 19/3/19 21/2/19 –
21/2/19
(3.1.162) CPC/Maint
Bond

Drainage Work Precinct 5 Contrail Sdn
3. 30/09/15 14/3/19 - -
(3.2.1e) Bhd

Cypark
Roadwork Precinct 5 (3.1.100a*) √
4. Resources 13/10/15 - -
Bhd 19/3/19
Roadwork Precinct 7 (3.1.56a*)
Pembinaan Target Pending
Green Connector Precinct 8
5. Mitrajaya 25/10/11 22/3/19 - - LOA
(3.1.160*)
Sdn Bhd
Cypark
√ √
6. Roadworks at P7G (3.1.163) Resources 12/02/16 -
19/3/19 9/10/18
Bhd
Syarikat
Ismail Target
7. Promenade (Lake) (4.38) 23/2/16 - -
Ibrahim Sdn 22/3/19
Bhd
Railing for promenade (4.39)
Cypark
31/07/19 Under Target 3rd Party
Resources -
8. Hardedge & temporary Works (Jangkaan) construction 22/3
Bhd
(Lake) (4.40)
Low Hoo √
9. Canal (Lake) 6.2.57) & Sons Sdn 18/12/13 20/3/19 - -
Bhd
Bridge connecting P4 to P19 √
10. Uritec Team 29/09/17 CPC issued -
(3.5.32) 19/3/19
(M) Sdn Bhd
Remaining Bus Stop (35 nos)
21/11/17
(8.11*)
Cypark CPC issued √
11. Resources -
Earthworks (6.2.53) 30/11/17 19/3/19
Bhd
Roadworks R12 (3.1.56b)
B. ON-GOING INFRASTRUCTURE WORKS – JABATAN KERJA RAYA

Road, Drainage & Landscape at


P7 & P8 (phase 2) Package A Sunway √
12. 07/06/12 - -
(3.1.151)* Const. SB. 20/3/19