You are on page 1of 19

PROJECT NAME: 9-SCHOOL BUILDING GUA

CLIENT NAME: MINISTRTY O


PROJECT NUMBER: P-
STRUCTURE: HOLLOWC

CASTED CASTED INSTALLED INSTALLED


LENGTH WIDTH THICKNESS AREA VOL.(m3) REBAR W.MESH STRAND REQUIRED AREA VOL. REBAR W.MESH
REV. ELEMENT CODE
QTY.
( mm ) ( mm ) ( mm ) ( m2 ) GREY ( kg ) ( kg ) ( kg ) ( m2 ) ( m3 ) ( kg ) ( kg )

5-Strand (Bottom) / 200mm thickness


9GH-HCS-01 3560 1100 200 3.916 0.54 0.00 0.00 13.706 2 7.83 1.08 0.00 0.00

9GH-HCS-02 3560 1200 200 4.272 0.54 0.00 0.00 13.706 6 25.63 3.25 0.00 0.00

9GH-HCS-03 3804 860 200 3.271 0.58 0.00 0.00 14.645 2 6.54 1.16 0.00 0.00

9GH-HCS-04 4160 860 200 3.578 0.63 0.00 0.00 16.016 2 7.16 1.26 0.00 0.00

9GH-HCS-05 4160 1200 200 4.992 0.63 0.00 0.00 16.016 8 39.94 5.06 0.00 0.00

9GH-HCS-06 5360 1150 200 6.164 0.81 0.00 0.00 20.636 4 24.66 3.26 0.00 0.00

9GH-HCS-07 5360 1200 200 6.432 0.81 0.00 0.00 20.636 4 25.73 3.26 0.00 0.00

9GH-HCS-08 4160 1150 200 4.784 0.63 0.00 0.00 16.016 2 9.57 1.26 0.00 0.00

9GH-HCS-09 4160 1200 200 4.992 0.63 0.00 0.00 16.016 10 49.92 6.32 0.00 0.00

9GH-HCS-10 4160 1200 200 4.992 0.63 0.00 0.00 16.016 2 9.98 1.26 0.00 0.00

9GH-HCS-11 4160 885 200 3.682 0.63 0.00 0.00 16.016 4 14.73 2.53 0.00 0.00

TOTAL 46 221.68 29.71 0.00 0.00

LEGEND :
TOTAL QTY.
OL BUILDING GUARD HOUSE (AL-BADIAH SITE)
AME: MINISTRTY OF EDUCATION
JECT NUMBER: P-2012-018
CTURE: HOLLOWCORE SLAB
PERIOD: AS OF SEPT. 07, 2014

INSTALLED CASTED DELIVERED DELIVERED DELIVERED DELIVERY ERECTED ERECTION


STRAND QTY. CASTING BALANCE DELIVERED QTY. DELIVERY AREA VOL. BALANCE ERECTED QTY. ERECTION BALANCE
DATE QTY. ELEMENT DATE ELEMENT DATE
( kg ) ( pc ) ( pc.) ( m2 ) ( m3 ) ( pc.) ( pc.) ( pc.)

27.41 2 13-Mar-14 0 0.00 0.00 2 0 2

82.24 6 13-Mar-14 0 0.00 0.00 6 0 6

29.29 2 13-Mar-14 0

32.03 2 13-Mar-14 0

128.13 8 13-Mar-14 0

82.54 4 13-Mar-14 0

82.54 4 13-Mar-14 0

32.03 2 13-Mar-14 0

160.16 10 13-Mar-14 0

32.03 2 13-Mar-14 0

64.06 4 13-Mar-14 0

752.47 46 0 0 0 0 8 0 8
LEGEND : LEGEND : LEGEND :
CASTED DELIVERED ERECTED
BALANCE BALANCE BALANCE
STRUCTURE: DOUBLE

CASTED CASTED INSTALLED INSTALLED


LENGTH HEIGHT WIDTH AREA VOL.(m3) REBAR W.MESH STRAND REQUIRED AREA VOL. REBAR W.MESH
REV. ELEMENT CODE
QTY.
( mm ) ( mm ) ( mm ) ( m2 ) GREY ( kg ) ( kg ) ( kg ) ( m2 ) ( m3 ) ( kg ) ( kg )

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

TOTAL 0 0.00 0.00 0.00 0.00

LEGEND :
TOTAL QTY.
UCTURE: DOUBLE TEE SLAB
PERIOD: AS OF SEPT. 18, 2014

INSTALLED CASTED DELIVERED DELIVERED DELIVERED DELIVERY ERECTED ERECTION


STRAND QTY. CASTING BALANCE DELIVERED QTY. DELIVERY AREA VOL. BALANCE ERECTED QTY. ERECTION BALANCE
DATE QTY. ELEMENT DATE ELEMENT DATE
( kg ) ( pc ) ( pc.) ( m2 ) ( m3 ) ( pc.) ( pc.) ( pc.)

0.00 0 0.00 0.00 0

0.00 0 0.00 0.00

0.00 0 0.00 0.00


0
0.00 0.00

0 0.00 0.00

0 0.00 0.00

0 0.00 0.00 0 0

0.00 0 0 0 0 0 0 0 0
LEGEND : LEGEND : LEGEND :
CASTED DELIVERED ERECTED
BALANCE BALANCE BALANCE
STRUCTURE: SOLID

CASTED CASTED INSTALLED INSTALLED


LENGTH HEIGHT WIDTH AREA VOL.(m3) REBAR W.MESH STRAND REQUIRED AREA VOL. REBAR W.MESH
REV. ELEMENT CODE
QTY.
( mm ) ( mm ) ( mm ) ( m2 ) GREY ( kg ) ( kg ) ( kg ) ( m2 ) ( m3 ) ( kg ) ( kg )

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

TOTAL 0 0.00 0.00 0.00 0.00

LEGEND :
TOTAL QTY.
TRUCTURE: SOLID SLAB
PERIOD: AS OF AUG. 05, 2014

INSTALLED CASTED DELIVERED DELIVERED DELIVERED DELIVERY ERECTED ERECTION


STRAND QTY. CASTING BALANCE DELIVERED QTY. DELIVERY AREA VOL. BALANCE ERECTED QTY. ERECTION BALANCE
DATE QTY. ELEMENT DATE ELEMENT DATE
( kg ) ( pc ) ( pc.) ( m2 ) ( m3 ) ( pc.) ( pc.) ( pc.)

0.00 0 BSL-01 0.00 0.00 0 BSL-01 0

0.00 0 0.00 0.00 0 0

0.00 0 0.00 0.00 0 0

0.00 0 0.00 0.00 0 0

0.00 0 0 0 0 0 0 0 0
LEGEND : LEGEND : LEGEND :
CASTED DELIVERED ERECTED
BALANCE BALANCE BALANCE
STRUCTURE: ST

CASTED CASTED INSTALLED INSTALLED


LENGTH HEIGHT WIDTH AREA VOL.(m3) REBAR W.MESH STRAND REQUIRED AREA VOL. REBAR W.MESH
REV. ELEMENT CODE
QTY.
( mm ) ( mm ) ( mm ) ( m2 ) GREY ( kg ) ( kg ) ( kg ) ( m2 ) ( m3 ) ( kg ) ( kg )

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

TOTAL 0 0.00 0.00 0.00 0.00

LEGEND :
TOTAL QTY.
STRUCTURE: STAIR
PERIOD: AS OF AUG. 05, 2014

INSTALLED CASTED DELIVERED DELIVERED DELIVERED DELIVERY ERECTED ERECTION


STRAND QTY. CASTING BALANCE DELIVERED QTY. DELIVERY AREA VOL. BALANCE ERECTED QTY. ERECTION BALANCE
DATE QTY. ELEMENT DATE ELEMENT DATE
( kg ) ( pc ) ( pc.) ( m2 ) ( m3 ) ( pc.) ( pc.) ( pc.)

0.00 0 BST-01 0.00 0.00 0 BST-01 0 0

0.00 0 BST-02 0.00 0.00 0 BST-02 0 0

0.00 0 BST-03 0.00 0.00 0 BST-03 0 0

0.00 0 BST-04 0.00 0.00 0 BST-04 0 0

0.00 0 0 0 0 0 0 0 0
LEGEND : LEGEND : LEGEND :
CASTED DELIVERED ERECTED
BALANCE BALANCE BALANCE
PROJECT NAME: 9-SCHOOL BUILDING GUA
CLIENT NAME: MINISTRTY O
PROJECT NUMBER: P-
STRUCTURE: PA

CASTED CASTED INSTALLED INSTALLED


LENGTH HEIGHT WIDTH AREA VOL. (m3) REBAR W.MESH REQUIRED AREA VOL. REBAR W.MESH
REV. ELEMENT CODE
QTY.
( mm ) ( mm ) ( mm ) ( m2 ) WHITE GREY ( kg ) ( kg ) ( m2 ) ( m3 ) ( kg ) ( kg )

8.12 0.51 0.90 8.12 1.41 0.00 0.00


9GH-WP-01 2
8.12 0.51 0.90 8.12 1.41 0.00 0.00

7.66 0.46 0.73 7.66 1.19 0.00 0.00


9GH-WP-02 2
7.66 0.46 0.73 7.66 1.19 0.00 0.00

7.70 0.44 0.75 7.70 1.19 0.00 0.00


9GH-WP-03 2
7.70 0.44 0.75 7.70 1.19 0.00 0.00

7.66 0.46 0.73 7.66 1.19 0.00 0.00


9GH-WP-04 2
7.66 0.46 0.73 7.66 1.19 0.00 0.00

7.33 0.44 0.70 7.33 1.14 0.00 0.00


9GH-WP-05 2
7.33 0.44 0.70 7.33 1.14 0.00 0.00

7.33 0.44 0.69 7.33 1.13 0.00 0.00


9GH-WP-06 2
7.33 0.44 0.69 7.33 1.13 0.00 0.00

7.42 0.44 0.70 7.42 1.14 0.00 0.00


9GH-WP-07 2
7.42 0.44 0.70 7.42 1.14 0.00 0.00

6.91 0.41 0.83 6.91 1.24 0.00 0.00


9GH-WP-08 2
6.91 0.41 0.83 6.91 1.24 0.00 0.00

6.69 0.40 0.80 6.69 1.20 0.00 0.00


9GH-WP-09 2
6.69 0.40 0.80 6.69 1.20 0.00 0.00

7.60 0.46 0.91 7.60 1.37 0.00 0.00


9GH-WP-10 2
7.60 0.46 0.91 7.60 1.37 0.00 0.00

11.78 0.71 1.41 11.78 2.12 0.00 0.00


9GH-WP-11 2
11.78 0.71 1.41 11.78 2.12 0.00 0.00

11.10 0.67 1.33 11.10 2.00 0.00 0.00


9GH-WP-12 2
9GH-WP-12 2
11.10 0.67 1.33 11.10 2.00 0.00 0.00

11.10 0.67 1.17 11.10 1.84 0.00 0.00


9GH-WP-13 2
11.10 0.67 1.17 11.10 1.84 0.00 0.00

10.58 0.63 1.00 10.58 1.63 0.00 0.00


9GH-WP-14 2
10.58 0.63 1.00 10.58 1.63 0.00 0.00

12.55 0.75 1.19 12.55 1.94 0.00 0.00


9GH-WP-15 2
12.55 0.75 1.19 12.55 1.94 0.00 0.00

12.69 0.76 1.22 12.69 1.98 0.00 0.00


9GH-WP-16 2
12.69 0.76 1.22 12.69 1.98 0.00 0.00

8.26 0.49 0.80 8.26 1.29 0.00 0.00


9GH-WP-17 2
0.00 0.00 0.00 0.00

14.34 0.86 1.37 14.34 2.23 0.00 0.00


9GH-WP-18 2
14.34 0.86 1.37 14.34 2.23 0.00 0.00

7.51 0.45 0.90 7.51 1.35 0.00 0.00


9GH-WP-19 2
7.51 0.45 0.90 7.51 1.35 0.00 0.00

4.91 0.29 0.59 4.91 0.88 0.00 0.00


9GH-WP-20 2
4.91 0.29 0.59 4.91 0.88 0.00 0.00

5.65 0.34 0.68 5.65 1.02 0.00 0.00


9GH-WP-21 2
5.65 0.34 0.68 5.65 1.02 0.00 0.00

13.49 0.81 1.28 13.49 2.09 0.00 0.00


9GH-WP-22 2
13.49 0.81 1.28 13.49 2.09 0.00 0.00

8.52 0.51 0.80 8.52 1.31 0.00 0.00


9GH-WP-23 2
8.52 0.51 0.80 8.52 1.31 0.00 0.00

14.42 0.86 1.37 14.42 2.23 0.00 0.00


9GH-WP-24 2
14.42 0.86 1.37 14.42 2.23 0.00 0.00

16.47 0.99 1.97 16.47 2.96 0.00 0.00


9GH-WP-25 2
16.47 0.99 1.97 16.47 2.96 0.00 0.00

TOTAL 50 467.32 76.85 0.00 0.00

LEGEND :
TOTAL QTY.
OL BUILDING GUARD HOUSE (AL-BADIAH SITE)
AME: MINISTRTY OF EDUCATION
JECT NUMBER: P-2012-018
STRUCTURE: PANEL
PERIOD: AS OF OCT. 29, 2014

INSTALLED CASTED DELIVERED DELIVERED DELIVERED DELIVERY ERECTED ERECTION


STRAND QTY. CASTING BALANCE DELIVERED QTY. DELIVERY AREA VOL. BALANCE ERECTED QTY. ERECTION BALANCE
DATE QTY. ELEMENT DATE ELEMENT DATE
( kg ) ( pc ) ( pc.) ( m2 ) ( m3 ) ( pc.) ( pc.) ( pc.)

0.00 1 13-Dec-14
0
0.00 1 15-Dec-14

0.00 1 14-Dec-14 0.00 0.00 2 2


0
0.00 1 16-Dec-14

0.00 1 16-Dec-14
0
0.00 1 17-Dec-14

0.00 1 16-Dec-14
0
0.00 1 17-Dec-14

0.00 1 14-Dec-14
0
0.00 1 15-Dec-14

0.00 1 15-Dec-14
0
0.00 1 16-Dec-14

0.00 1 15-Dec-14
0
0.00 1 16-Dec-14

0.00 1 16-Dec-14
0
0.00 1 17-Dec-14

0.00 1 13-Dec-14
0
0.00 1 15-Dec-14

0.00 1 15-Dec-14
0
0.00 1 16-Dec-14

0.00 1 7-Dec-14
0
0.00 1 8-Dec-14

0.00 1 14-Dec-14
0
0
0.00 1 16-Dec-14

0.00 1 11-Dec-14
0
0.00 1 13-Dec-14

0.00 1 10-Dec-14
0
0.00 1 11-Dec-14

0.00 1 4-Dec-14
0
0.00 1 6-Dec-14

0.00 1 8-Dec-14
0
0.00 1 9-Dec-14

0.00 1 14-Dec-14
0
0.00 1 15-Dec-14

0.00 1 17-Mar-14
0
0.00 1 30-Oct-14

0.00 1 13-Dec-14
0
0.00 1 15-Dec-14

0.00 1 16-Dec-14
0
0.00 1 17-Dec-14

0.00 1 13-Dec-14
0
0.00 1 14-Dec-14

0.00 1 3-Dec-14
0
0.00 1 6-Dec-14

0.00 1 13-Dec-14
0
0.00 1 14-Dec-14

0.00 1 26-Oct-14
0
0.00 1 29-Oct-14

0.00 1 14-Oct-14
0
0.00 1 19-Oct-14

0.00 50 0 0 0 0 2 0 2
LEGEND : LEGEND : LEGEND :
CASTED DELIVERED ERECTED
BALANCE BALANCE BALANCE
PROJECT NAME: 9-SCHOOL BUILDING GUA
CLIENT NAME: MINISTRTY O
PROJECT NUMBER: P-
STRUCTURE: BE

CASTED CASTED INSTALLED INSTALLED


LENGTH HEIGHT WIDTH AREA VOL.(m3) REBAR W.MESH STRAND REQUIRED AREA VOL. REBAR W.MESH
REV. ELEMENT CODE
QTY.
( mm ) ( mm ) ( mm ) ( m2 ) GREY ( kg ) ( kg ) ( kg ) ( m2 ) ( m3 ) ( kg ) ( kg )

0.553 0.00 0.55 0.00 0.00


9GH-RB-01 2
0.553 0.00 0.55 0.00 0.00

0.515 0.00 0.52 0.00 0.00


9GH-RB-02 2
0.515 0.00 0.52 0.00 0.00

0.589 0.00 0.59 0.00 0.00


9GH-RB-03 2
0.589 0.00 0.59 0.00 0.00

0.604 0.00 0.60 0.00 0.00


9GH-RB-04 2
0.604 0.00 0.60 0.00 0.00

0.227 0.00 0.23 0.00 0.00


9GH-RB-05 2
0.227 0.00 0.23 0.00 0.00

0.424 0.00 0.42 0.00 0.00


9GH-RB-06 2
0.424 0.00 0.42 0.00 0.00

0.227 0.00 0.23 0.00 0.00


9GH-RB-07 2
0.227 0.00 0.23 0.00 0.00

0.424 0.00 0.42 0.00 0.00


9GH-RB-08 2
0.424 0.00 0.42 0.00 0.00

0.373 0.00 0.37 0.00 0.00


9GH-RB-09 2
0.373 0.00 0.37 0.00 0.00

TOTAL 18 0.00 7.87 0.00 0.00

LEGEND :
TOTAL QTY.
OL BUILDING GUARD HOUSE (AL-BADIAH SITE)
AME: MINISTRTY OF EDUCATION
JECT NUMBER: P-2012-018
STRUCTURE: BEAM
PERIOD: AS OF SEPT. 30, 2014

INSTALLED CASTED DELIVERED DELIVERED DELIVERED DELIVERY ERECTED ERECTION


STRAND QTY. CASTING BALANCE DELIVERED QTY. DELIVERY AREA VOL. BALANCE ERECTED QTY. ERECTION BALANCE
DATE QTY. ELEMENT DATE ELEMENT DATE
( kg ) ( pc ) ( pc.) ( m2 ) ( m3 ) ( pc.) ( pc.) ( pc.)

0.00 1 22-Jun-14 0.00 0.00 2 132-RB1-01 2


0
0.00 1 24-Jun-14 0.00 0.00 0 132-RB1-02 0

0.00 1 26-Jun-14
0
0.00 1 5-Jul-14

0.00 1 30-May-14
0
0.00 1 17-Jun-14

0.00 1 10-Jul-14
0
0.00 1 13-Jul-14

0.00 1 28-Jun-14
0
0.00 1 29-Jun-14

0.00 1 10-Jul-14
0
0.00 1 14-Jul-14

0.00 1 20-Jul-14
0
0.00 1 21-Jul-14

0.00 1 7-Jul-14
0
0.00 1 8-Jul-14

0.00 1 24-Jun-14
0
0.00 1 26-Jun-14

0.00 18 0 0 0 0 2 0 2
LEGEND : LEGEND : LEGEND :
CASTED DELIVERED ERECTED
BALANCE BALANCE BALANCE
PROJECT NAME: 9-SCHOOL BUILDING GUA
CLIENT NAME: MINISTRTY O
PROJECT NUMBER: P-
STRUCTURE: COLU

CASTED CASTED INSTALLED INSTALLED


LENGTH HEIGHT WIDTH AREA VOL.(m3) REBAR W.MESH STRAND REQUIRED AREA VOL. REBAR W.MESH
REV. ELEMENT CODE
QTY.
( mm ) ( mm ) ( mm ) ( m2 ) GREY ( kg ) ( kg ) ( kg ) ( m2 ) ( m3 ) ( kg ) ( kg )

9GH-PC1 (1) 0.374 1 0.00 0.37 0.00 0.00

9GH-PC1 (2) 0.374 1 0.00 0.37 0.00 0.00

9GH-PC2 (1) 0.390 1 0.00 0.39 0.00 0.00

9GH-PC2 (2) 0.390 1 0.00 0.39 0.00 0.00

9GH-PC3 (1) 0.390 1 0.00 0.39 0.00 0.00

9GH-PC3 (2) 0.390 1 0.00 0.39 0.00 0.00

TOTAL 6 0.00 2.31 0.00 0.00

LEGEND :
TOTAL QTY.
OL BUILDING GUARD HOUSE (AL-BADIAH SITE)
AME: MINISTRTY OF EDUCATION
JECT NUMBER: P-2012-018
STRUCTURE: COLUMN
PERIOD: AS OF OCT. 15, 2014

INSTALLED CASTED DELIVERED DELIVERED DELIVERED DELIVERY ERECTED ERECTION


STRAND QTY. CASTING BALANCE DELIVERED QTY. DELIVERY AREA VOL. BALANCE ERECTED QTY. ERECTION BALANCE
DATE QTY. ELEMENT DATE ELEMENT DATE
( kg ) ( pc ) ( pc.) ( m2 ) ( m3 ) ( pc.) ( pc.) ( pc.)

0.00 1 22-May-14 0 0.00 0.00 1 0 1

0.00 1 24-May-14 0 0.00 0.00 1 0 1

0.00 1 27-May-14 0 0.00 0.00 1 0 1

0.00 1 28-May-14 0 0.00 0.00 1 0 1

0.00 1 1-Jun-14 0 0.00 0.00 1 0 1

0.00 1 4-Jun-14 0 0.00 0.00 1 0 1

0.00 6 0 0 0 0 6 0 6
LEGEND : LEGEND : LEGEND :
CASTED DELIVERED ERECTED
BALANCE BALANCE BALANCE
PROJECT CURRENT STATUS
PROJECT NAME: 9-SCHOOL BLDG. GUARD HOUSE (AL-BADIAH SITE)
CLIENT NAME: MINISTRY OF EDUCATION
PROJECT NUMBER: P-2012-018

REQUIRED CASTED QTY. CASTED AREA CASTED VOL. INTALLED INSTALLED INSTALLED BALANCE QTY.
QTY. REBAR W.MESH STRAND CASTING %
S.N. STRUCTURE ACCOMPLISHED
( pc.) ( pc.) ( m2 ) ( m3 ) ( kg ) ( kg ) ( kg ) ( pc.)

1 COLUMN 6 6 0.00 2.31 0.00 0.00 0.00 0 100%

2 BEAM 18 18 0.00 7.87 0.00 0.00 0.00 0 100%

3 PANEL 50 50 467.32 76.85 0.00 0.00 0.00 0 100%

4 STAIR 0 0 0.00 0.00 0.00 0.00 0.00 0 #DIV/0!

5 SOLID SLAB 0 0 0.00 0.00 0.00 0.00 0.00 0 #DIV/0!

6 DOUBLE TEE SLAB 0 0 0.00 0.00 0.00 0.00 0.00 0 #DIV/0!

HOLLOWCORE SLAB (200mm


7 thk.) 46 46 221.68 29.71 0.00 0.00 752.47 0 100%

TOTAL 120 120 689.00 116.74 0.00 0.00 752.47 0 100%