You are on page 1of 23

ELEMENT LIST

PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / AL-BADIAH SITE )


CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: PARAPET PANEL QR 7.5.0/4

AS OF MARCH 17, 2014 PERIOD : MAR. 2014

TABLE VOLUME (m3) CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. WHITE CEMENT GRAY CEMENT ( Pc.)
1 9S-E.G.PW-01a 1 0.88 Rev.0

2 9S-E.G.PW-02a 1 0.45 Rev.0

3 9S-E.G.PW-03a 1 0.45 Rev.0

TOTAL 3 1.78 0 0 3

LEGEND :
CASTED
BALANCE
CASTED VOL.
WHITE GRAY
0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0 0
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / AL-BADIAH SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: PANEL QR 7.5.0/4

AS OF MARCH 17, 2014 PERIOD : MAR. 2014

TABLE VOLUME (m3) CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. WHITE CEMENT GRAY CEMENT ( Pc.)
1 9S-E.G.GP-01a 1 0.86 1.41 Rev.0

2 9S-E.G.GP-02a 1 0.92 1.5 Rev.0

3 9S-E.G.WP-01a 1 0.91 1.42 Rev.0

4 9S-E.G.WP-02a 1 0.65 1.03 Rev.0

5 9S-E.G.WP-03a 1 0.8 1.48 Rev.0

6 9S-E.G.WP-04a 1 0.47 0.87 Rev.0

7 9S-E.G.WP-05a 1 0.54 0.99 Rev.0

8 9S-E.G.WP-06a 1 0.31 0.59 Rev.0

9 9S-E.G.WP-07a 1 0.69 1.27 Rev.0

10 9S-E.G.WP-08a 1 1.06 1.66 Rev.0

11 9S-E.G.WP-15a 1 0.94 1.5 Rev.0

12 9S-E.G.WP-16a 1 0.83 1.22 Rev.0

13 9S-E.G.WP-17b 1 1.19 2.21 Rev.0

14 9S-E.G.WP-17C 1 1.19 2.21 Rev.0

15 9S-E.G.WP-18a 1 0.83 1.22 Rev.0

16 9S-E.G.WP-19a 1 0.91 1.42 Rev.0

17 9S-E.G.WP-20a 1 0.9 1.42 Rev.0

18 9S-E.G.WP-21a 1 0.91 1.42 Rev.0

TOTAL 18 14.91 24.84 0 18

LEGEND :
CASTED
BALANCE
CASTED VOL.
WHITE GRAY
0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0 0
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / AL-BADIAH SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: BEAM QR 7.5.0/4

AS OF MARCH 04, 2014 PERIOD : MAR. 2014

TABLE VOLUME CASTED CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. ( m3 ) ( Pc.) VOL.
1 9S-E.G.BM-01a 1 1.65 1 2-Mar-14 REV.0 1.65
REV.0 0.00
REV.0
0.00
REV.0 0.00
REV.0
0.00
TOTAL 1 1.65 1 0 1.65

LEGEND :
CASTED
BALANCE
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / ZAH RAT LABEN SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: PARAPET PANEL QR 7.5.0/4

AS OF MAY 13, 2014 PERIOD : MAR. 2014

TABLE VOLUME (m3) CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. WHITE CEMENT GRAY CEMENT ( Pc.)
1 9S-E.G.PW-01a 1 0.88 1 13-May-14 Rev.0

2 9S-E.G.PW-02a 1 0.45 Rev.0

3 9S-E.G.PW-03a 1 0.45 Rev.0

TOTAL 3 1.78 0 1 2

LEGEND :
CASTED
BALANCE
CASTED VOL.
WHITE GRAY
0.880 0.000

0.000 0.000

0.000 0.000

0.000 0.000

0.88 0.00
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / ZAH RAT LABEN SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: PANEL QR 7.5.0/4

AS OF MAY 14, 2014 PERIOD : MAY 2014

TABLE VOLUME (m3) CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. WHITE CEMENT GRAY CEMENT ( Pc.)
1 9S-E.G.GP-01a 1 0.86 1.41 Rev.0

2 9S-E.G.GP-02a 1 0.92 1.5 Rev.0

9S-E.G.WP-01a 1 0.91 1.42 1 14-May-14 Rev.0

3 9S-E.G.WP-02a 1 0.65 1.03 1 13-May-14 Rev.0

4 9S-E.G.WP-03a 1 0.8 1.48 Rev.0

5 9S-E.G.WP-04a 1 0.47 0.87 1 11-May-14 Rev.0

6 9S-E.G.WP-05a 1 0.54 0.99 Rev.0

7 9S-E.G.WP-06a 1 0.31 0.59 1 13-May-14 Rev.0

8 9S-E.G.WP-07a 1 0.69 1.27 Rev.0

9 9S-E.G.WP-08a 1 1.06 1.66 1 12-May-14 Rev.0

10 9S-E.G.WP-15a 1 0.94 1.50 1 11-May-14 Rev.0

11 9S-E.G.WP-16a 1 0.83 1.22 Rev.0

12 9S-E.G.WP-17b 1 1.19 2.21 1 11-May-14 Rev.0

13 9S-E.G.WP-17c 1 1.19 2.21 1 13-May-14 Rev.0

14 9S-E.G.WP-18a 1 0.83 1.22 Rev.0

15 9S-E.G.WP-19a 1 0.91 1.42 1 13-May-14 Rev.0

16 9S-E.G.WP-20a 1 0.90 1.42 Rev.0

17 9S-E.G.WP-21a 1 0.91 1.42 1 14-May-14 Rev.0

TOTAL 18 14.91 24.84 10 8

LEGEND :
CASTED
BALANCE
CASTED VOL.
WHITE GRAY
0.000 0.000

0.000 0.000

0.910 1.420

0.650 1.030

0.000 0.000

0.470 0.870

0.000 0.000

0.310 0.590

0.000 0.000

1.060 1.660

0.940 1.500

0.000 0.000

1.190 2.210

1.190 2.210

0.000 0.000

0.910 1.420

0.000 0.000

0.910 1.420

0.000 0.000

8.54 14.33
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / ZAH RAT LABEN SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: BEAM QR 7.5.0/4

AS OF MARCH 04, 2014 PERIOD : MAR. 2014

TABLE VOLUME CASTED CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. ( m3 ) ( Pc.) VOL.
1 9S-E.G.BM-01a 1 1.65 1 2-Mar-14 Rev.0 1.65
2 Rev.0 0.00
3 Rev.0
0.00
7 Rev.0 0.00
8 Rev.0
0.00
TOTAL 1 1.65 1 0 1.65

LEGEND :
CASTED
BALANCE
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / AL-SHEFAH SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: PARAPET PANEL QR 7.5.0/4

AS OF SEPTEMBER 21, 2013 PERIOD : SEPT. 19 - 21, 2013

TABLE VOLUME (m3) CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. WHITE CEMENT GRAY CEMENT ( Pc.)
18 9S-E.G.PW-01a 1 0.88 1 21-Sep-13 Rev.0
18 9S-E.G.PW-02a 1 0.45 1 19-Sep-13 Rev.0
18 9S-E.G.PW-03a 1 0.45 1 19-Sep-13 Rev.0

TOTAL 3 1.78 0 3 0

LEGEND :
CASTED
BALANCE
CASTED VOL.
WHITE GRAY
0.880 0.000
0.450 0.000
0.450 0.000

1.78 0.00
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / AL-SHEFAH SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: PANEL QR 7.5.0/4

AS OF NOVEMBER 30, 2013 PERIOD : OCT. - NOV. 2013

TABLE VOLUME (m3) CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. WHITE CEMENT GRAY CEMENT ( Pc.)
45 9S-E.G.-GP-01a 1 0.86 1.41 1 30-Oct-13 Rev.0
10 9S-E.G.-GP-02a 1 0.92 1.50 1 2-Nov-13 Rev.0

45 9S-E.G.-WP-01a 1 0.91 1.42 1 26-Oct-13 Rev.0


10 9S-E.G.-WP-02a 1 0.65 1.03 1 24-Oct-13 Rev.0
28 9S-E.G.-WP-03a 1 0.80 1.48 1 12-Oct-13 Rev.0
28 9S-E.G.-WP-04a 1 0.47 0.87 1 23-Oct-13 Rev.0
62 9S-E.G.-WP-05a 1 0.54 0.99 1 23-Oct-13 Rev.0
28 9S-E.G.-WP-06a 1 0.31 0.59 1 31-Oct-13 Rev.0
47 9S-E.G.-WP-07a 1 0.69 1.27 1 31-Oct-13 Rev.0
47 9S-E.G.-WP-08a 1 1.06 1.66 1 24-Oct-13 Rev.0
9S-E.G.-WP-09a
9S-E.G.-WP-10a
9S-E.G.-WP-11a
9S-E.G.-WP-12a
9S-E.G.-WP-13a
9S-E.G.-WP-14a
23 9S-E.G.-WP-15a 1 0.94 1.50 1 31-Oct-13 Rev.0
15 9S-E.G.-WP-16a 1 0.83 1.22 1 23-Oct-13 Rev.0
23 9S-E.G.-WP-17b 1 1.19 2.21 1 21-Oct-13 Rev.0
23 9S-E.G.-WP-17c 1 1.19 2.21 1 23-Oct-13 Rev.0
15 9S-E.G.-WP-18a 1 0.83 1.22 1 30-Nov-13 Rev.0
45 9S-E.G.-WP-19a 1 0.91 1.42 1 24-Oct-13 Rev.0
23 9S-E.G.-WP-20a 1 0.90 1.42 1 24-Oct-13 Rev.0
10 9S-E.G.-WP-21a 1 0.91 1.42 1 30-Oct-13 Rev.0

TOTAL 18 14.91 24.84 18 0

LEGEND :
CASTED
BALANCE
CASTED VOL.
WHITE GRAY
0.860 1.410
0.920 1.500
0.000 0.000
0.910 1.420
0.650 1.030
0.800 1.480
0.470 0.870
0.540 0.990
0.310 0.590
0.690 1.270
1.060 1.660
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000
0.940 1.500
0.830 1.220
1.190 2.210
1.190 2.210
0.830 1.220
0.910 1.420
0.900 1.420
0.910 1.420

14.91 24.84
ELEMENT LIST
PROJECT NAME: 9 SCHOOL BUILDING ( ENTRANCE GATE-2 / AL-SHEFAH SITE )
CLIENT NAME: BABEL ( MINISTRY OF EDUCATION )
PROJECT NUMBER: P-2012-018
TYPE OF ELEMENT: BEAM QR 7.5.0/4

AS OF SEPTEMBER 17, 2013 PERIOD : SEPT. 07, 2013

TABLE VOLUME CASTED CASTED


S.N ELEMENT CODE QTY. DATE OF CASTING REMARKS
NO. ( m3 ) ( Pc.) VOL.
17/9/13 DRWG.
1 OT-40T 9S-E.G.BM-01a 1 1.65 1 22-Sep-13
Rev.0 1.65
2 0.00
0.00
TOTAL 1 1.65 1 0 1.65

LEGEND :
CASTED
BALANCE
PROJECT CURRENT STATUS
DOC.:QR 7.5.0/9

OK AS OF MAY 14 , 2014

PROJECT NAME : BABEL ( 9-SCHOOL BUILDING ENTRANCE GATE - 2 )


REQUIRED RELEASED CASTED BALANCE TOTAL CASTED BALANCE
S. N. CLIENT STRUCTURE QTY. DRAWING QTY. QTY. VOL. VOL. VOL. %
PROJECT ACCOMPLISHED
NUMBER ( pc.) ( pc.) ( pc.) ( pc.) ( m3 ) ( m3 ) ( m3 )

1 P-2012-018 BABEL BEAM 1 1 1 0 1.65 1.65 0.00 100%


(E.G.-2/AL-SHEFAH SITE)

2 P-2012-018 BABEL PANEL 18 18 18 0 39.75 39.75 0.00 100%


(E.G.-2/AL-SHEFAH SITE)

3 P-2012-018 BABEL PARAPET PANEL 3 3 3 0 1.78 1.78 0.00 100%


(E.G.-2/AL-SHEFAH SITE)

HOLLOWCORE (200mm/120.01m2)
4 P-2012-018 BABEL (E.G./AL-SHEFAH SITE-Left) 13 13 13 0 15.20 15.20 0.00 100%

BEAM
5 P-2012-018 BABEL (E.G.-2/ZAH RET LABEN SITE) 1 1 1 0 1.65 1.65 0.00 100%

6 P-2012-018 BABEL PANEL 18 18 10 8 39.75 22.87 16.88 56%


(E.G.-2/ZAH RET LABEN SITE)
PARAPET PANEL
7 P-2012-018 BABEL (E.G.-2/ZAH RET LABEN 3 3 1 2 1.78 0.88 0.90 33%
SITE)

8 P-2012-018 BABEL HOLLOWCORE (200mm/240.02m2) 26 26 26 0 30.40 30.40 0.00 100%


(E.G./ZAH RET LABEN SITE-Left)

BEAM
9 P-2012-018 BABEL (E.G.-2/AL-BADIAH SITE) 1 1 1 0 1.65 1.65 0.00 100%

PANEL
10 P-2012-018 BABEL (E.G.-2/AL-BADIAH SITE) 18 18 0 18 39.75 0 39.75 0%

11 P-2012-018 BABEL PARAPET PANEL 3 3 0 3 1.78 0 1.78 0%


(E.G.-2/AL-BADIAH SITE)

12 P-2012-018 BABEL HOLLOWCORE (200mm/240.02m2) 26 26 26 0 30.40 30.40 0.00 100%


(E.G./AL-BADIAH SITE-Left)
TOTAL 131 131 100 31 205.55 146.24 59.31 76%
PRE-STRESSED ELEMENT CASTING LIST
( HOLLOW CORE SLAB )
PROJECT # : P-2012-018

QR 7.5.0/6
PROJECT NAME: 9-SCHOOL BUILDING ( ENTRANCE GATE /AL-SHEFAH SITE-Left )

CLIENT NAME: BABEL 7S-BOT. No of CASTING

QTY. THICKNESS WIDTH LENGTH VOLUME AREA CASTED DATE OF


SN HCS ID # BED #
( Each ) ( mm ) ( mm ) ( mm ) ( m3 ) ( m2 ) ( Each ) CASTING

1 EG-HCS-01 1 1 200 670 7790 1.184 9.348 1 11-Mar-14

2 EG-HCS-02 1 2 200 1200 7790 2.368 18.696 2 11-Mar-14

3 EG-HCS-03 1 1 200 1200 7610 1.157 9.132 1 11-Mar-14

4 EG-HCS-04 1 6 200 1200 7610 6.940 54.792 6 11-Mar-14

5 EG-HCS-05 1 1 200 1200 7790 1.184 9.348 1 11-Mar-14

6 EG-HCS-06 1 1 200 1200 7790 1.184 9.348 1 11-Mar-14

7 EG-HCS-07 1 1 200 1030 7790 1.184 9.348 1 11-Mar-14

TOTAL 13 15.20 120.01 13 0

LEGEND :
CASTED
BALANCE
TOTAL NET GROSS

LENGTH AREA TOTAL VOL. AREA

0.152 7790 5.219 1.18 9.348

0.152 15580 18.696 2.37 18.696

0.152 7610 9.132 1.16 9.132

0.152 45660 54.792 6.94 54.792

0.152 7790 9.348 1.18 9.348

0.152 7790 9.348 1.18 9.348

0.152 7790 8.024 1.18 9.348

100010 114.56 15.20 120.01

0.74 no. of beds


0.00 0.00

Balance 0.00 no. of beds


PRE-STRESSED ELEMENT CASTING LIST
( HOLLOW CORE SLAB )
PROJECT # : P-2012-018

QR 7.5.0/6
PROJECT NAME: 9-SCHOOL BUILDING ( ENTRANCE GATE /ZAH RET LABEN SITE-Left )

CLIENT NAME: BABEL 7S-BOT. No of CASTING

QTY. THICKNESS WIDTH LENGTH VOLUME AREA CASTED DATE OF


SN HCS ID # BED #
( Each ) ( mm ) ( mm ) ( mm ) ( m3 ) ( m2 ) ( Each ) CASTING

1 EG-HCS-01 2 2 200 670 7790 2.368 18.696 2 11-Mar-14

2 EG-HCS-02 1 4 200 1200 7790 4.736 37.392 4 11-Mar-14

3 EG-HCS-03 2 2 200 1200 7610 2.313 18.264 2 11-Mar-14

4 2 1200 7610 8.097 63.924 7 11-Mar-14


EG-HCS-04 12 200
5 1200 7610 5.784 45.66 5 11-Mar-14

5 EG-HCS-05 2 2 200 1200 7790 2.368 18.696 2 11-Mar-14

6 EG-HCS-06 2 2 200 1200 7790 2.368 18.696 2 11-Mar-14

7 EG-HCS-07 2 2 200 1030 7790 2.368 18.696 2 11-Mar-14

TOTAL 26 30.40 240.02 26 0

LEGEND :
CASTED
BALANCE
TOTAL NET GROSS

LENGTH AREA TOTAL VOL. AREA

0.152 15580 10.439 2.37 18.696

0.152 31160 37.392 4.74 37.392

0.152 15220 18.264 2.31 18.264

0.152 91320 109.584 13.88 109.584

0.152 0 0.000 0.00 0.000

0.152 15580 18.696 2.37 18.696

0.152 15580 18.696 2.37 18.696

0.152 15580 16.047 2.37 18.696

200020 229.12 30.40 240.02

1.48 no. of beds


0.00 0.00

Balance 0.00 no. of beds


PRE-STRESSED ELEMENT CASTING LIST
( HOLLOW CORE SLAB )
PROJECT # : P-2012-018

QR 7.5.0/6
PROJECT NAME: 9-SCHOOL BUILDING ( ENTRANCE GATE /AL-BADIAH SITE-Left )

CLIENT NAME: BABEL 7S-BOT. No of CASTING

QTY. THICKNESS WIDTH LENGTH VOLUME AREA CASTED DATE OF


SN HCS ID # BED #
( Each ) ( mm ) ( mm ) ( mm ) ( m3 ) ( m2 ) ( Each ) CASTING

1 EG-HCS-01 3 2 200 670 7790 2.368 18.696 2 12-Mar-14

2 EG-HCS-02 3 4 200 1200 7790 4.736 37.392 4 12-Mar-14

3 EG-HCS-03 5 2 200 1200 7610 2.313 18.264 2 11-Mar-14

5 1200 7610 11.567 91.32 10 11-Mar-14


4 EG-HCS-04 12 200
3 1200 7610 2.313 18.264 2 12-Mar-14

5 EG-HCS-05 3 2 200 1200 7790 2.368 18.696 2 12-Mar-14

6 EG-HCS-06 3 2 200 1200 7790 2.368 18.696 2 12-Mar-14

7 EG-HCS-07 3 2 200 1030 7790 2.368 18.696 2 12-Mar-14

TOTAL 26 30.40 240.02 26 0

LEGEND :
CASTED
BALANCE
TOTAL NET GROSS

LENGTH AREA TOTAL VOL. AREA

0.152 15580 10.439 2.37 18.696

0.152 31160 37.392 4.74 37.392

0.152 15220 18.264 2.31 18.264

0.152 91320 109.584 13.88 109.584

0.152 0 0.000 0.00 0.000

0.152 15580 18.696 2.37 18.696

0.152 15580 18.696 2.37 18.696

0.152 15580 16.047 2.37 18.696

200020 229.12 30.40 240.02

1.48 no. of beds


0.00 0.00

Balance 0.00 no. of beds