Professional Documents
Culture Documents
they were using only one hand. The study concluded that view, Safety measurements or equipments that are
using both hand in proportion can increase the productivity necessarily required during the working process of company
up to 50%. It is concluded that it can save up to 2-3 workers & production are studied. Study was observed and
or up to 5-7 minutes per assembly. conducted in two stages.
4) Output Profit: In first stage, the communication is done with the
From table 1 to 4, it can be concluded that in both workers workers to know their requirements as per their safety. In
& time requirement is improved. second stage, implementation of Kaizen comes in work &
Sr. No. of Time the recommendation for some improvement and the
Description Quantity
No. workers Taken suggestions to the management is given.
01 Roller Shaft 02 06 25min It is concluded that the safety provided by the
Tapper pin for company is of good quality and every worker is satisfied by
02 roller shaft & its 04 - - the safety guards. But still some more safety must have to be
flanges provided by company i.e. earthing must be provided to
Chrome washer every machine, water cooler tanks should be shifted to other
03 78/90/110 - - position, fire extinguishers should be introduced in every
for roll
04 Roller flange 04 - - dept. (at least 5 per dept.), material should be handled by
Table 1: Data Analysis for Roller shaft assembly (Before) machines and not manually. Machines and arrangements
Sr. No. of should be handled by trained person only. Every operation
Description Quantity Time Taken should be observed by the supervisor regularly.
No. workers
01 Roller Shaft 02 06/04 18min/25min This case study gives the basic details of the
Tapper pin marketing strategy of Bajaj steels Pvt. Ltd. As at last
for roller everything depends upon how candidly you can sell your
02 04 - - product. Marketing can be done in three basic ways E
shaft & its
flanges marketing, paper marketing & marketing through brochures
Chrome and last by advertising it on the hoardings or televisions.
03 washer for 78 - - This case study explain brief idea of how
marketing is done by personal interest and what are the
roll
lacunas in marketing strategy and how it can be optimized
04 Roller flange 04 - -
so as to attract more customers. From the Kaizen point of
Table 2: Data Analysis for Roller shaft assembly (After)
view some suggestions regarding the improvisation of the
Sr. No. of Time marketing strategy of Bajaj steels Pvt. Ltd. is given.
Description Quantity
No. workers taken Marketing department should study the marketing appraisal
Holder for seed strategy and apply it to their method so as to increase their
01 02 07 20min
guard customers. Market survey is necessary and they should also
02 Bolts (5/16‟) 04 - - collect the secondary information. They should study the
Hex head nuts specific pattern in their customer response, from which area
03 04 - -
(5/16‟) and in which season they are getting more buyers and
04 Seed guard pin 04 - - accordingly they should more cautiously concentrate on that
Table 3: Data Analysis for Seed guard assembly (Before) area so as to increase their consumers or customers.
Sr. No. Of Time Marketing strategy should be periodically amended
Description Quantity
No. workers Taken according to the season. Money invested on the marketing
Holder for 16min/ should also be varied season to season like odd season less
01 02 07/05
seed guard 20min marketing budget is feasible. They should also keep track of
02 Bolts (5/16‟) 04 - - their competitors and focus more on those areas where their
Hex head nuts competitors are lacking. Various profitable deals or offers
03 04 - -
(5/16‟) should be tried with regular customers that would improvise
04 Seed guard pin 04 - - the profit of the company.
Table 4: Data Analysis for Seed guard assembly (After)
F. Kaizen Management System Audit:
Workers required performing one assembly using both
hands in 3:4 proportion is found less by 2-3 workers/ 1) What Happens During The Audit?
assembly than before. Even if using the same number of In keeping with the Kaizen approach, the audit is a practical
workers using the proper hand proportion then the assembly activity involving people in all levels of the business.
can complete with 30% reduction in time. Improvement systems achieve real results only when they
5) Conclusion Shown To the Industry: are maintained day-to-day by the people working to deliver
Using Kaizen technique & micro motion study industry can the company‟s products and services. Consequently, if we
improve productivity & efficiency of jobs per day. The want to assess the real situation we need to see what
implementation of Kaizen technique in the Bajaj Steels Pvt. happens on a day-to-day basis rather than listening to
Ltd. can surely make them ahead a step to success. specially prepared presentations. The Kaizen audit takes
place in gemba. This is a Japanese word meaning „the real
E. Application: place‟. In a business context it means „where the value is
In Bajaj Steels Pvt. Ltd., the safety of workers and added‟. During the audit we observe and talk to people in
employees is necessary. From the improvement point of
their normal job settings. We ask lots of questions and listen on Management Science & Engineering (18th)
to what they want to say. September 13-15, 2011 Rome, Italy.
[11] Alain Audenino: Kaizen & Lean Management
G. Outcomes of the Kaizen Audit:
Expert: “Kaizen And Lean Management Autonomy
At the end of the audit, an organization understands results And Self-Orientation, Potentiality And Reality ...”,
of the audit against the standard Kaizen Management PSA Peugeot Citroen - Velizy - France 2012 IEEE.
System. Model opportunities for improvement then [12] http://www.graphicproducts.com/tutorials,
identified further priorities and recommendations given for www.strategosinc.com
next steps. This feedback is given to the management group
and will be delivered in an interactive style with time for
questions and discussion.
III. CONCLUSION
As the Kaizen principle presumes a practical approach and
low costs of improvement, conclusion came as management
of the industry must be sure that when they take an action,
their action will go on in the best possible way. Any action
should not merely an intermediate action to generate a
temporary result.
A regular inspection for improvement point of view
should be done from good management of human resources
in the organization. It should be one of the strategic
objectives of the organization which should be clearly
defined and accepted by all its members.
REFERENCE
[1] Mihail Aurel Titu & constantin Oprean and Daniel
Grecu: “Applying the Kaizen Method and 5S
technique in the activity of post-scale services in
the knowledge-based organization”, March 17-19,
2010, Hong Kong.
[2] Sumit P. Raut, Laukik P. Raut, “Implementing total
quality management to improve facilities and
resources of departments in engineering institute”,
International Journal of Engineering research and
applications, ISSN: 2248-9622, Vol. 4, Issue
1(Version 2), January 2014.
[3] Peter D. Wickens: “Production management:
Japanese and British approaches”, Paper 6996A
(M2), received 25th April 1989.
[4] Robin C. Daniels: “Performance measurement at
the sharp end Driving continuous improvement on
the shop floor”
[5] Andrew Williamson : “Target & Kaizen Costing”,
Manufacturing Engineer February I997.
[6] Kate Mackle, Managing Partner, Kaizen Institute
UK: “A Framework For Implementation Of The
Kaizen @ Management System Audit”,
Manufacturing Engineer February I997.
[7] Colin Ashmore: “Kaizen-And The Art Of
Motorcycle Manufacture”, Engineering
Management Journal October 2001.
[8] Takeo Soed: “Every Day, And In Every Way, I'm
Getting Better And Better...”, Manufacturing
Engineer November 1991.
[9] Ross Banerjee: “Celling The Japanese Method”,
Manufacturing Engineer June 1993.
[10] CHEN Xu: School of Accounting, Harbin
University of Commerce, P. R. China, 150028:
“The Implementation Framework And Path
Research of Inter-organizational Cost Management
In Supply Chain”, 2011 International Conference