INFORMATION/DOCUMENTS NEEDED FROM PROPONANT

1) Name of the owner of the Plot


2) Cell No. and email address of owner of the Plot
3) Name of contact person
4) Cell No. and email address of contact person
5) 04 Photocopies of CNIC of Owner and Contact Person
6) Address of the Project Location
7) Official Name of the organization/company
8) Soft copy of Logo of organization/company
9) Correspondence Address of the organization/company e.g. Head office etc.
10) Drawing of project to know Actual area of the unit, Contents of building structure
11) Materials of construction? E.g. RCC, Fiber glass wool shed etc.
12) Road Access to site
13) Some photos of unconstructed plot/site
14) Main Activity at the unit
15) Types Raw Materials and Source of Raw Materials imported or local?
16) Detail of processes/Flow of processes from Raw materials to finished product
17) Types of final products?
18) Production capacity of the unit?
19) Kind of machinery to be installed?
20) Source of utilities such as Ground water/Surface water, Gas, Electricity
21) Amount of Water requirement? During construction, operation?
22) Amount of electricity requirement? During construction, operation?
23) Amount of gas requirement? During construction, operation?
24) Solid waste management during construction, operation?
a. Estimated Amount of solid waste to be generated?
b. Types of solid waste/s?
c. How solid shall be segregated, stored and disposed off?
25) Storm and Waste water management/Sewerage system, estimated consumption of
water, waste water, quality of waste water? During construction, operation?
26) Air pollution types, control and management
27) Occupational health and safety issues and their management
28) Emergency response preparedness, fire safety etc.
29) Health and education facilities in the area
30) Boiler fuel and waste management?
31) Installation of Generator for Electricity backup? Yes/No? In case of yes, fuel and
waste management? During construction, operation?
32) Cost of the project (Project cost includes infrastructure/machinery cost and land cost)
33) Duration of the project
34) Land ownership documents/Allotment/Possession Letter
35) No. of employees

OFFICE#4, 1ST FLOOR 7/C-I, CIVIC CENTER OPP. PTCL EXCHANGE, FAISAL TOWN,
LAHORE-PAKISTAN. Ph: 042-35170710 Cell: 0300 9106342 / 0300 8506342
E-mail: altec.engineers@gmail.com
CONSULTING ENGINEERS, ARCHITECTS, TURNKEY CIVIL, PEB PROJECT DEVELOPMENT PROFESSIONALS
a. Regular
b. Seasonal/Temporary
c. Labor class persons
36) Management hierarchy
37) Operational hours
38) Tree plantation
39) Amount to be spent on Environment (Environmental management cost)
40) Designations of persons responsible for Environment
41) Training for Safety and environment
42) 10 Blank Pages of Official Letter Head