Message No. 2 - Format Infrastructure Data Collection 30.01.2019
Action Plan
Communication Computerization, CMM, IT Based Platform / Stabling Lines nominated for Other End Carriage watering
Sick Line Pit lines Other Items Staff Training LHB Condition of Infra. for
Facilities Systems Maintenance System
Deficiencies
Systems of upkeep of IT
Illumination (Catwalk /
Portable LED Lighting
Material storage room
CCTVs, etc., AMC/Staff
Non-Standard Design
Condition of catwalks
Washable apron with
Competency of Staff,
System or Machines
System/Contract for
Adequate Industrial
Standard watering
Side Examination)
Coach
Adequate covered
Adequate Material
Cleaning of Depot
Total No. of PITS
Without Apron Pit
Internet Facilities
destination boards,
Standard Design
Handling Facility
Computerization
Depot
disposal system
accommodation
Sufficient No. of
CCTV Cameras
Proper garbage
information, LED
Booster pumps
covered drains
S.No. Rly Division Holdin
Issue of BPC
maintenance
Sick Marking
Model Room
Adequate
Condition of
esp. in LHB
code
P&T phone
Schedules
Standard
chemicals
g
Extent of
hydrants
line staff
Training)
Paved
Trollies
Proper
Rolling-in
ends
Pits
Pathways
examination
for
lights
Material.
CAMTEC
H
Drawing
4% of 50% of 100% for 300 to 500 Min. 3 Nos.,
2T No. Min 100% Whether 1.5 days
Presc Coach covered CMM Lux, min.30 40 HP, 200
Hoists RDSO/M/ 2MBPS Data 100% requirem
ribed Holdin lines Pilot Watt LED light m3 per hour
, etc. 00006/R Speed Entry Done ent
g (min.) Locations fitting each
2/1 & 2,
Oct.
2011 Give % Give Give Give
Give % Give %
Confir Confir BPCs Rate in Give % % of % of Give % Give No. of Give No. % of Rate in a Done/
Yes Yes Yes Yes Yes Confirm Yes Yes Yes Yes Data Data Yes Yes Give % of lines Yes Yes Give Nos. Yes Yes OK/No Yes Yes OK/Not Yes Specify Works
Actual m m issued a scale of lines lines lines of lines Booster of fitters scale of Not
/No /No /No /No /No NOS /No /No /No /No Entry in Entry in /No /No provided /No /No provided /No /No t OK /No /No OK /No and Targets
NOS NOS through of 0-10 provided provid provid provided Pumps Cameras provid 0-10 Done
CMM CMM
CMM ed ed ed
NOT
OK(3
72 NFR LMG GHY 757 NO Yes Yes NO YES 1 3 2 4 YES YES YES YES 100% 100% 100% 9 YES YES 100% 100% 100% 100% 100% YES NIL NIL YES 100% 7 9 NO YES
PIT
NO YES DONE OK YES
LINE)
73 NFR LMG KYQ 356 NO Yes Yes NO YES 2 0 0 2 YES YES YES YES 100% 100% 100% 9 YES YES 100% 100% 100% 100% 100% YES NIL 43 YES 100% 4 10 YES YES OK NO YES DONE OK YES
74 NFR
75 NFR
76 NFR
77 NFR
78 NFR
79 NFR
80 NFR
81 NFR
82 NFR
83 NFR
WR Total
Grand Total
CDO/GHY