You are on page 1of 1

Status of Coaching Depots (BG) on IR

Action Plan
Communication Computerization, CMM, IT Based Platform / Stabling Lines nominated for Other End Carriage watering
Sick Line Pit lines Other Items Staff Training LHB Condition of Infra. for
Facilities Systems Maintenance System
Deficiencies

High pressure Pipeline

Standard tool kit for Pit


based systems (e.g. Fire

110 V inspection lights

Preparedness for LHB


Sufficient Examination

Systems of upkeep of IT

Illumination (Catwalk /
Portable LED Lighting
Material storage room
CCTVs, etc., AMC/Staff
Non-Standard Design

Dedicated water tank

Condition of catwalks
Washable apron with

Competency of Staff,

Pest control of Depot


of adequate capacity
lighting arrangement

System or Machines

Water logging in pits


computer & printers

System/Contract for
Adequate Industrial

Dosing machine for


detection, Passenger

on side of the track


coaches from both

Standard watering

Side Examination)
Coach

Adequate covered

Adequate Material

Cleaning of Depot
Total No. of PITS
Without Apron Pit

Internet Facilities

destination boards,
Standard Design
Handling Facility

Computerization
Depot

Facility for lifting

disposal system
accommodation

Sufficient No. of

CCTV Cameras

Proper garbage
information, LED

Booster pumps
covered drains
S.No. Rly Division Holdin

Issue of BPC

maintenance
Sick Marking

Model Room
Adequate

Condition of
esp. in LHB
code

P&T phone

Schedules
Standard

chemicals
g

Extent of

hydrants

line staff
Training)
Paved

Trollies

Proper
Rolling-in

ends
Pits
Pathways
examination
for
lights
Material.
CAMTEC
H
Drawing
4% of 50% of 100% for 300 to 500 Min. 3 Nos.,
2T No. Min 100% Whether 1.5 days
Presc Coach covered CMM Lux, min.30 40 HP, 200
Hoists RDSO/M/ 2MBPS Data 100% requirem
ribed Holdin lines Pilot Watt LED light m3 per hour
, etc. 00006/R Speed Entry Done ent
g (min.) Locations fitting each
2/1 & 2,
Oct.
2011 Give % Give Give Give
Give % Give %
Confir Confir BPCs Rate in Give % % of % of Give % Give No. of Give No. % of Rate in a Done/
Yes Yes Yes Yes Yes Confirm Yes Yes Yes Yes Data Data Yes Yes Give % of lines Yes Yes Give Nos. Yes Yes OK/No Yes Yes OK/Not Yes Specify Works
Actual m m issued a scale of lines lines lines of lines Booster of fitters scale of Not
/No /No /No /No /No NOS /No /No /No /No Entry in Entry in /No /No provided /No /No provided /No /No t OK /No /No OK /No and Targets
NOS NOS through of 0-10 provided provid provid provided Pumps Cameras provid 0-10 Done
CMM CMM
CMM ed ed ed
NOT
OK(3
72 NFR LMG GHY 757 NO Yes Yes NO YES 1 3 2 4 YES YES YES YES 100% 100% 100% 9 YES YES 100% 100% 100% 100% 100% YES NIL NIL YES 100% 7 9 NO YES
PIT
NO YES DONE OK YES
LINE)
73 NFR LMG KYQ 356 NO Yes Yes NO YES 2 0 0 2 YES YES YES YES 100% 100% 100% 9 YES YES 100% 100% 100% 100% 100% YES NIL 43 YES 100% 4 10 YES YES OK NO YES DONE OK YES
74 NFR
75 NFR
76 NFR
77 NFR
78 NFR
79 NFR
80 NFR
81 NFR
82 NFR
83 NFR
WR Total
Grand Total