FORMAT-1
GENERATION OF ELECTRICITY
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name & Address of State Transmission Utility/SEB/ED:
Sl. No. Name of Power Station Type of Installed Capacity of Power Gross Electricity Electricity Consumption
Prime- mover* Nos. of Station
Unit Size as at year end
in MW Station. Generation in in Unit & Station
Units Capacity in MW MkWh Auxiliaries in MkWh
*Hydro turbine, Steam turbine (Coal), Steam turbine (Lignite), Steam turbine (Multi-fuel), Gas turbine, Diesel engine, Wind turbine, etc.
S.No. Name of the officer Designation Mobile No. Email Address Fax No. Official Phone No.
1
2
115 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-2
TRANSMISSION OF ELECTRICITY
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name & Address of State Transmission Utility/SEB/ED:
Figs. in MkWh
1 Electrical Energy imported from :
(a) Within the State/UT/System –
(i) State/Pvt/Jt. Power Stations
(ii) Captive Power Plants (CPPs)
FORMAT-3
DISTRIBUTION OF ELECTRICITY
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name & Address of Discom:
Figs. in MkWh
1 Electrical Energy imported from :
(a) Within the State/UT/System
(b) Captive power plants( from within or
outside the
State/UT/System)
FORMAT-5
DETAILS OF ACTUAL SALE AND PURCHASE OF GROSS ELECTRICAL ENERGY
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of Utility/Licensee:
Name of Utility/Non- Utility/Entity (To SALES (MkWh) PURCHASES (MkWh) REMARKS, IF ANY
whom Sold /from whom purchased)
Note:- (i) Gross energy sale/purchase may be indicated utility/non-utility name-wise clearly & separately in this table.
(ii) Purchase of energy from captive power plant if any, may also be indicated.
(iii) Details of energy sold to licensees may be indicated Licensee-name wise.
(iv) Wheeling of energy should not be included in the above data.
(v) Energy imported/exported from /to Central Generating Stations may be given separately for each Power House.
[PART III - SEC.4]
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Figures in MkWh
ARKS, IF ANY
FORMAT-6
INSTALLED ELECTRICITY GENERATING CAPACITY
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name and address of the Utility:
Figs. in MW
Sl No Type of prime mover AS AT THE BEGINNING New Change in Capacity AT THE END OF THE YEAR Remarks
(Fuel based ) Capacity capacity retired
OF THE YEAR added during the during the
Installed Re-rated (I.C.) year due to year Installed Re-rated
Capacity Capacity re-ration* Capacity Capacity if any
1 Hydro Turbine
2 Steam Turbine
Coal -
Lignite –
Gas/ Multi-fuel
3 Diesel Engine
4 Gas Turbine
5 Nuclear
6 Wind Turbine
7 Solar
8 Others, if any
FORMAT-7
DETAILS OF ELECTRICITY GENERATING CAPACITY ADDED
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name and address of the GENCO/Utility:
Sl. No. Name of Power Unit size in MW Type of Prime Boiler MAKE Date of
House mover (Fuel Commissioning
base) Turbine Generator
1
2
Note: - The details of each unit are to be furnished in this format. Indicate primary fuel within brackets along with type of prime-mover.
123 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-10
DETAILS OF FUEL CONSUMPTION
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of the GENCO/Utility:
FUEL CONSUMED
kilo calories
Sl.No. Name of Power House Fuel Name Average calorific per unit Overall Thermal Efficiency
Qty .Used
value in kilo calories generated
mt/kl/MMSCM
per kg/litre
1
2
3
4
Note :- - Fuel consumption details regarding Gas/Diesel stations are to be shown separately.
- Give details of all primary & secondary fuels consumed during the year.
- mt = Metric Tonne
- kl = Kilo Litre
- MMSCM = Million Metric Standard Cubic Metre
124 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-11
DETAILS OF STEP-UP TRANSFORMERS IN SERVICE AT THE POWER STATIONS AND VARIOUS SUB-
STATIONS AS ON 31-03-2019
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of the Utility/Entity :
Sl. .No. Name of Power Voltage Class* in Voltage Ratio in Different Capacity No(s). in each Aggregate capacity
House or Sub- No. of use use in use (kVA) capacity (Size) (kVA)
station Transformers
1
2
TOTAL
FORMAT-12
DETAILS OF STEP-DOWN TRANSFORMERS * IN SERVICE AS ON 31-03-2019
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of the Undertaking:
2 220 Kv
3 132/110 kV
4 78/66 kV
5 44/33 kV
6 22 kV
7 13.2 kV
8 11 kV
9 6.6 kV
10 4.4 kV
11 3.3 kV
Any other
12 (specify)
TOTAL 0
(*) Secondary voltage above 500 volts.
126 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-13
DETAILS OF DISTRIBUTION TRANSFORMERS * IN SERVICE AS ON 31-03-2019
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of the Utility/Non-Utility/Entity:
Sl No . Voltage class Voltage Ratio Total No. OF Different No. in each capacity Aggregate Capacity (KVA)
Transformers capacities in Size
use (kva)
1
2
3
4
5
6
7
8
9
10
Total :
FORMAT-14
DETAILS OF TRANSMISSION AND DISTRIBUTION LINES AS ON 31-03-2019
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name and address of the Utility/Non-Utility/Entity:
Sl. Nominal Length of line in km at the Length of line added during the Total Length of line in Ckt km Remarks
No Voltage beginning of the year year in km at the beginning at the end of the year
Single Double Multi Single Double Multi Ckt* Single Double Multi Total
Ckt Ckt Ckt
Ckt Ckt* Ckt Ckt Ckt*
1 EHV Lines: above
500kV
2 500 kV DC lines
3 400 kV
4 230 kV
5 220kV
6 132 kV
7 110 kV
8 78 kV
9 66 kV
10 33 kV
11 22 kV
12 11 kV
13 6.6 kV
14 4.4 kV
15 3.3 kV
16 2.2 kV
17 440/230 V, 3
18 #phase,
Directsingle phase if available
current
lines (volts)
19 Any other
(specify)
Note: Give break-up for U.G. (Underground) & O.H. (Overhead).
#Indicate voltage of operation.
* Mention no. of Ckts.
128 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-15
DETAILS OF ELECTRICITY CONSUMERS, CONNECTED LOAD AND CONSUMPTION
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of the Utility
Sl. Category & Sub NUMBER OF CONSUMERS CONNECTED LOAD (kW) Energy Remarks
No. Category/ Area At the Added during At the end of At the Added during At the end of the Consumption
Type beginning of the year the year beginning of the year year (kwh)
the year the year
Rural Urban Rural Urban Rural Urban Rural Urban Rural Urban Rural Urban
1 Domestic
a Above Poverty
line(BPL)
i Scheduled Caste
ii Scheduled Tribe
ii Other than i & ii
above
Sub Total(a)
b Below Poverty line(BPL) (This may include Life line consumers, JJ clusters,
i Scheduled Tribe
ii Scheduled Caste
Other than i & ii
ii above
Sub Total(b)
Total Domestic
(a+b)
2 Commercial
3 Industrial
Industrial
a (LV&MV)
8 Any other
categogry
Pvt Licensees
9
(Licensee wise) *
Entities within
10 State/UT
11 Entities Outside
State/UT
Total
* Dealing with Purchase and further selling of energy
Note-1. Break up of consumers for each voltage level( LV &MV, HT, & EHT level-if applicable) and the corresponding load for each
Category/Sub Category of consumers may given (similar to Category at Sr no-3 ) by inserting additional Rows suitably
Note-2. Break up of consumers in to Metered and Unmetered (if any ) and the corresponding Load for each Voltage level
( LV &MV, HT, & EHT level (if applicable) for each Category/Sub Category of consumers may given (similar to Category at Sr no-3 ) by inserting additional
Rows suitably
129 [PART III - SEC.4]
FORMAT-16
Details of Manpower
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of utility :
1. Managerial and higher executives: All engineering posts of the rank of Chief Engineer and above is to be included.
2. Technical and scientific officers: All engineering posts above the rank of supervisor/Junior Engineer/ Scientific Officer
may be included.
3. Non-Technical : All regular non-technical employees i.e. Executive, clerical, accounting, revenue collection, meter reading
staff and officers may be included.
a) Generation: All technical staff of the rank of supervisor/Section officer/Junior engineer/ Assistant Controller engaged at
generating stations and those associated with planning of generation may be included.
b) & c) Similar staff mentioned above engaged in transmission & distribution system.
d) & e) Similar staff mentioned above engaged in trading & other activities.
5. a) Technicians and operation staff : All the technical staff below the rank of supervisor/Junior engineer engaged at
generating stations.
b) & c)Similar staff mentioned above engaged in Transmission and Distribution system.
d) & e)Similar staff mentioned above engaged in other activities
131 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-17
Training Facilities / Training Capacity in the Power Sector (Man-Days of Year)
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of utility/Organisation :
Name of Field of Training Induction Level Training (Man Days) ManagementTr Refresher Total Total Utilization of
Institute (Thermal/Hydro/Transmi aining (Man Training training( Training Training
ssion/ Distribution/ Days) (Man Days) Man Days) Capacity Capacity = Col.
Management) (Man Days) 10/11*100(%)
1 2 3 4 5 6 7 8 9 10 11 12
Technical Non-Technical
Engineers Sup. /Operators Technicians Executive Non-Executive
132 THE GAZETTE OF INDIA : EXTRAORDINARY
FORMAT-18
DETAILS OF THEFT OF ELECTRICITY
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name and Address of Discom/Licensee/SEB/Electricity Deptt.
iii) Estimated quantity of electrical energy considered as theft in above cases for the
period:
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
133 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-19
STATISTICS ON ELECTRICAL ACCIDENTS
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of Utility/Non-Utility/Entity:
N.B. :- Indicate the number of human/animal affected. Also show the corresponding number of accidents within brackets
134 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III - SEC.4]
FORMAT-20
REASONS FOR ELECTRICAL ACCIDENTS
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
Submission by 31st August 2020
Name of Undertaking:
Human Animals
Sl No Reasons
FATAL NON-FATAL FATAL NON-FATAL
PERIODICITY-ANNUAL
DATA OF YEAR 2019-20
ubmission by 31st August 2020
Total