Professional Documents
Culture Documents
Summary of Structural Calculation of 1-Barrel Box Culvert: 1 Design Dimensions and Bar Arrangements #N/A
Summary of Structural Calculation of 1-Barrel Box Culvert: 1 Design Dimensions and Bar Arrangements #N/A
2 Design Parameters
1 / 37 479443620.xls/Summary
STRUCTURAL CALCULATION OF UNDERPASS SINGLE BOX Type: B8.00m x H5.10m
Soil Cover Depth: 0.5 m
1 Dimensions and Parameters
Basic Parameters
Ka: Coefficient of static earth pressure 0.333
g w: Unit weight of water (t/m3) 1.00 t/m3
Gwd gd: Unit weight of soil (dry) (t/m3) 1.80 t/m3
D gs: Unit weight of soil (saturated) (t/m3) 2.00 t/m3
gc: Unit weight of reinforced concrete (t/m3) 2.40 t/m3
s ck: Concrete Design Strength 20.75 N/mm2
t2
ssa: Allowable Stress of Reinforcement Bar 339 N/mm2
H
Hf HT
Hf Basic Dimensions
H: Internal Height of Box Culvert 5.10 m
t3
B: Internal Width of Box Culvert 8.00 m
t1 t1 Hf: Fillet Height 0.30 m
B
t1: Thickness of Side Wall 0.55 m
t2: Thickness of Top Slab 0.55 m
B
t3: Thickness of Invert (Bottom Slab) 0.55 m
T
BT: Gross Width of Box Culvert 9.10 m
HT: Gross Height of Box Culvert 6.20 m
D: Covering Depth 0.50 m
Cover of R-bar
Top Slab d2 0.05 m
Side Wall d1 0.05 m
Bottom Slab d3 0.05 m
Dimension of frame
t1 B t1
D1
t2
H H0
t3
B0
2/ 37 (1)479443620.xls, Load
1 Top Slab
Dead Load :
Qrigid : 0.3 x 1 x 2.4 : 0.720 t/m QUDL : 1.2 x QUDL
Qtimbun : 1.8 x 0.5 x 1 : 0.900 t/m : 1.2 x 2.94
Qtopslab : 0.55 x 1 x 2.4 : 1.320 t/m 3.528 t/m
QUDL : 2.94 t/m
MuDL : 1/8 x QUDL x L2
: 1/8 x 3.528 x 82
28.224 t.m
Live Load :
Beban Merata QULL : 2.2 t/m QULL : 1.6 x QULL
2.75 : 1.6 x 0.8
: 0.80 t/m 1.280 t/m
Check Pembesian
ρb 0.85 x 20.75 600
X 0.85 X
339 600+339
: 0.0283
0.75 x ρb
ρmax Rn : Mn / b.d2
: 0.0212 : 427.377.778 / (1000 x 5502)
: 1.4128
ρmin
1.4/fy
: 0.0041 m : fy / 0.85 x fc'
: 19.2204
Mn : Mu / Ø
: 38.464 / 0.9
: 42.7378 t.m
: 427,377,778 Nmm
As perlu ρ x b x d
: 0.0043 x 1000 x 550
1 2.m. Rn
ρ= 1− 1−
m (√ fy ) : 2392.17 mm2
: 23.92 cm2
Dimensi dan jarak tulangan yang dibutuhkan untuk top slab = D22-150
3/ 37 (1)479443620.xls, Load
2 Bottom Slab
Dead Load :
Qrigid : 0.3 x 1 x 2.4 : 0.72 t/m QUDL : 1.2 x QUDL
Qtimbun : 1.8 x 0.5 x 1 : 0.900 t/m : 1.2 x 5.740
Qstruktur : ((0.55 x 9.1 x 2.4 : 4.120 t/m 6.887 t/m
x 2) + (0.55 x 5.1
x 2.4*2)) / 9.1
QUDL : 5.740 t/m MuDL : 1/8 x QUDL x L2
: 1/8 x 6.887 x 82
55.100 t.m
Check Pembesian
ρb 0.85 x 20.75 600
X 0.85 X
339 600+339
: 0.0283
0.75 x ρb
ρmax Rn : Mn / b.d2
: 0.0212 : 72.5998.107 / (1000 x 5502)
: 2.4000
ρmin
1.4/fy
: 0.0041 m : fy / 0.85 x fc'
: 19.2204
Mn : Mu / Ø
: 65.340 / 0.9
: 72.5998 t.m
: 725997558 Nmm
As perlu ρ x b x d
: 0.0076 x 1000 x 550
1 2.m. Rn
ρ=
m ( √
1− 1−
fy ) : 4202.36 mm2
: ### cm2
Dimensi dan jarak tulangan yang dibutuhkan untuk bottom slab = D25-100
4/ 37 (1)479443620.xls, Load
3 Wall
Ø: 30
g : 1.8 t/m3 g = 1.8 t/m3 h1 = 1.35 m
P1 h2 = 4.50 m
P2
σz (1) : g x h1 x Ka
: 1.8 x 1.35 x 0.333
: 0.809 t/m2
5.65
σz (2) : (g x h2 x Ka)
: (1.8 x 4.5 x 0.333)
: 2.697 t/m2
P1 : σz (1) x h2 Mu : P1 x L1 + P2 x L2
: 0.809 x 4.5 : (3.6414 x (4.50/2)) + (6.0689 x (4.50/3))
: 3.6414 ton : 17.2964 t.m
P2 : 1/2 σz (2) x h2
: 1/2 x 2.697 x 4.5
: 6.0689 ton
Check Pembesian
ρb 0.85 x 20.75 600
X 0.85 X
339 600+339
: 0.0283
0.75 x ρb
ρmax max Rn : Mn / b.d2
: 0.0212 : 19.2183 x 107 / (1000 x 5502)
: 0.6353
ρmin
1.4/fy min
: 0.0041 m : fy / 0.85 x fc'
: 19.2204
Mn : Mu / Ø
: 17.2964 / 0.9
: 19.2183 t.m
: 192182625 Nmm
As perlu ρ x b x d
: 0.0041 x 1000 x 550
1 2.m. Rn
ρ= 1− 1−
m (√ fy ) :
:
2255 mm2
22.55 cm2
Dimensi dan jarak tulangan yang dibutuhkan untuk dinding box = D22 - 150
5/ 37 (1)479443620.xls, Load
STRUCTURAL CALCULATION OF UNDERPASS SINGLE BOX Type: B8.00m x H5.10m
Soil Cover Depth: 0.5 m
1 Dimensions and Parameters
Basic Parameters
Gwd Ka: Coefficient of static earth pressure 0.333
D gw: Unit weight of water (t/m3) 1.00 t/m3
gd: Unit weight of soil (dry) (t/m3) 1.80 t/m3
gs: Unit weight of soil (saturated) (t/m3) 2.00 t/m3
t2
gc: Unit weight of reinforced concrete (t/m3) 2.40 t/m3
sck: Concrete Design Strength 20.75 N/mm2
ssa: Allowable Stress of Reinforcement Bar 339 N/mm2
H
Hf HT
Hf
t3
t1 t1 Basic Dimensions
B H: Internal Height of Box Culvert 5.10 m
B: Internal Width of Box Culvert 8.00 m
B Hf: Fillet Height 0.30 m
T t1: Thickness of Side Wall 0.55 m
t2: Thickness of Top Slab 0.55 m
t3: Thickness of Invert (Bottom Slab) 0.55 m
BT: Gross Width of Box Culvert 9.10 m
HT: Gross Height of Box Culvert 6.20 m
D: Covering Depth 0.50 m
Cover of R-bar
Top Slab d2 0.05 m
Side Wall d1 0.05 m
Bottom Slab d3 0.05 m
Dimension of frame
t1 B t1
D1
t2
H H0
t3
B0
Dead Load :
Qrigid : 0.3 x 1 x 2.4 : 0.720 t/m QUDL : 1.2 x QUDL
Qtimbun : 1.8 x 0.5 x 1 : 0.900 t/m : 1.2 x 2.94
Qtopslab : 0.55 x 1 x 2.4 : 1.320 t/m 3.528 t/m
QUDL : 2.94 t/m
MuDL : 1/8 x QUDL x L2
: 1/8 x 3.528 x 82
28.224 t.m
Live Load :
Beban Merata QULL : 2.2 t/m QULL : 1.6 x QULL
2.75 : 1.6 x 0.8
: 0.80 t/m 1.280 t/m
Check Pembesian
ρb 0.85 x 20.75 600
X 0.85 X
339 600+339
: 0.0283
0.75 x ρb
ρmax Rn : Mn / b.d2
: 0.0212 : 427.377.778 / (1000 x 5502)
: 1.4128
ρmin
1.4/fy
: 0.0041 m : fy / 0.85 x fc'
: 19.2204
Mn : Mu / Ø
: 38.464 / 0.9
: 42.7378 t.m
: 427,377,778 Nmm
As perlu ρ x b x d
: 0.0043 x 1000 x 550
1 2.m. Rn
ρ= 1− 1−
m (√ fy ) : 2392.17 mm2
: 23.92 cm2
Dimensi dan jarak tulangan yang dibutuhkan untuk top slab = D22-150
Dead Load :
Qrigid : 0.3 x 1 x 2.4 : 0.72 t/m QUDL : 1.2 x QUDL
Qtimbun : 1.8 x 0.5 x 1 : 0.900 t/m : 1.2 x 5.740
Qstruktur : ((0.55 x 9.1 x 2.4 : 4.120 t/m 6.887 t/m
x 2) + (0.55 x 5.1
x 2.4*2)) / 9.1
QUDL : 5.740 t/m MuDL : 1/8 x QUDL x L2
: 1/8 x 6.887 x 82
55.100 t.m
Check Pembesian
ρb 0.85 x 20.75 600
X 0.85 X
339 600+339
: 0.0283
0.75 x ρb
ρmax Rn : Mn / b.d2
: 0.0212 : 72.5998.107 / (1000 x 5502)
: 2.4000
ρmin
1.4/fy
: 0.0041 m : fy / 0.85 x fc'
: 19.2204
Mn : Mu / Ø
: 65.340 / 0.9
: 72.5998 t.m
: 725997558 Nmm
As perlu ρ x b x d
: 0.0076 x 1000 x 550
1 2.m. Rn
ρ=
m ( √
1− 1−
fy ) : 4202.36 mm2
: ### cm2
Dimensi dan jarak tulangan yang dibutuhkan untuk bottom slab = D25-100
Ø: 30
g : 1.8 t/m3 g = 1.8 t/m3 h1 = 1.35 m
P1 h2 = 4.50 m
P2
σz (1) : g x h1 x Ka
: 1.8 x 1.35 x 0.333
: 0.809 t/m2
5.65
σz (2) : (g x h2 x Ka)
: (1.8 x 4.5 x 0.333)
: 2.697 t/m2
P1 : σz (1) x h2 Mu : P1 x L1 + P2 x L2
: 0.809 x 4.5 : (3.6414 x (4.50/2)) + (6.0689 x (4.50/3))
: 3.6414 ton : 17.2964 t.m
P2 : 1/2 σz (2) x h2
: 1/2 x 2.697 x 4.5
: 6.0689 ton
Check Pembesian
ρb 0.85 x 20.75 600
X 0.85 X
339 600+339
: 0.0283
0.75 x ρb
ρmax max Rn : Mn / b.d2
: 0.0212 : 19.2183 x 107 / (1000 x 5502)
: 0.6353
ρmin
1.4/fy min
: 0.0041 m : fy / 0.85 x fc'
: 19.2204
Mn : Mu / Ø
: 17.2964 / 0.9
: 19.2183 t.m
: 192182625 Nmm
As perlu ρ x b x d
: 0.0041 x 1000 x 550
1 2.m. Rn
ρ= 1− 1−
m (√ fy ) :
:
2255 mm2
22.55 cm2
Dimensi dan jarak tulangan yang dibutuhkan untuk dinding box = D22 - 150
Basic Parameters
Gwd Ka = Coefficient of static earth pressure = 0.33
D gw = Unit weight of water (t/m3) = 1.00 t/m3
gd = Unit weight of soil (dry) (t/m3) = 1.80 t/m3
gs = Unit weight of soil (saturated) (t/m3) = 2.00 t/m3
t2 gc = Unit weight of reinforced concrete (t = 2.40 t/m3
sck = Concrete Design Strength = 20.75 N/mm2
ssa = Allowable Stress of Reinforcement B= 339.00 N/mm2
H
Hf HT Basic Dimensions
H = Internal Height of Box Culvert = 3.00 m
Hf B = Internal Width of Box Culvert = 6.00 m
t3 Hf = Fillet Height = 0.30 m
t1 t1 t1 = Thickness of Side Wall = 0.45 m
B
t2 = Thickness of Top Slab = 0.45 m
B t3 = Thickness of Invert (Bottom Slab) = 0.45 m
T BT = Gross Width of Box Culvert = 6.90 m
HT = Gross Height of Box Culvert = 3.90 m
2 Dimension of frame D = Covering Depth = 0.50 m
t1 B t1 Cover of R-bar
Top Slab d2 = 0.05 m
D1 Side Wall d1 = 0.05 m
Bottom Slab d3 = 0.05 m
t2
H H0
t3
B0
TOP SLAB
1 Dead Load
Q-rigid = 1.00 x 0.30 x 2.40 = 0.72 t/m
Q-timbunan = 1.00 x 0.50 x 1.80 = 0.90 t/m
Q-topslab = 1.00 x 0.45 x 2.40 = 1.08 t/m
2 Live Load
Q-LL = 2.20 / 2.75 = 0.80 t/m 0.80
(beban merata per meter panjang)
b = 0.80 x ssa
= 0.80 x 339.00 = 271.20 N/mm2
a = b x 0.588 x ssa
sck
= 271.20 x 0.588 x 339.00 = -2605 N/mm2
20.75
c = -k = -1.004 N/mm2
1 2
rho-hit = -b + ( b^2 - 4 x a x c )^0.5
2 x a
1 = -271.2 3
2 = 251.16
3 = -5210
4 = 0.0038
BUTTOM SLAB
1 Dead Load
Q-rigid = 1.00 x 0.30 x 2.40 = 0.72 t/m
Q-timbunan = 1.00 x 0.50 x 1.80 = 0.90 t/m
Q-topslab = 6.90 x 0.45 x 2.40 = 1.08 t/m
6.90
Q-topslab = 6.90 x 0.45 x 2.40 = 1.08 t/m
6.90
Q-wall = 3.00 x 0.45 x 2.40 = 0.94 t/m
6.90
2 Live Load
Q-LL = 2.20 / 2.75 = 0.80 t/m
(beban merata per meter panjang)
b = 0.80 x ssa
= 0.80 x 339.00 = 271.20 N/mm2
a = b x 0.588 x ssa
sck
= 271.20 x 0.588 x 339.00 = -2605 N/mm2
20.75
c = -k = -1.543 N/mm2
1 2
rho-hit = -b + ( b^2 - 4 x a x c )^0.5
2 x a
1 = -271.2 3
2 = 239.73
3 = -5210
4 = 0.006
Jarak =
As 25 x 100
As-pke
= 18.053 cm
Jadi Buttom Slab menggunakD 25 - 18
Ø = 30
ɤ = 1.8 t/m3 y = 1.8 t/m3 h1 1.25 m
h2=2.40 m
σz (1) = ɤ x Ka x h1 σz (2) = ɤ x Ka x h2
= 1.8 x 0.33 x 1.25 = 1.8 x 0.33 x 2.40
= 0.75 t/m2 = 1.44 t/m2
P1 = σz (1) x h2 P2 = σz (2) x h2
= 1.80 ton = 3.45 ton
b = 0.80 x ssa
= 0.80 x 339.00 = 271.20 N/mm2
a = b x 0.588 x ssa
sck
= 271.20 x 0.588 x 339.00 = -2605 N/mm2
20.75
c = -k = -0.243 N/mm2
1 2
rho-hit = -b + ( b^2 - 4 x a x c )^0.5
2 x a
1 = -271.2 3
2 = 266.49
3 = -5210
4 = 0.0009
Jarak = As 19 x 100
As-pke
= 15.249 cm
Jadi Wall / Deck Slab meng D 19 - 15
A Daftar Mutu Beton
K MPa
1 100 7.40
2 125 9.80
3 150 12.20
4 175 14.50
5 200 16.90
6 225 19.30
7 250 21.70
8 275 24.00
9 300 26.40
10 325 28.80
11 350 31.20
1 Data
Mutu Beton f'c = 21.70 MPa = 217.00 Kg/cm2
Mutu Baja fy = 400.00 MPa = 4,000.00 Kg/cm2
Axial Force Pu = 18.54 Ton = 18,540.00 Kg
Momen Mu = 13.77 Ton-m = 1,377,000.00 Kg-cm
Lebar b = 0.45 m = 45.00 cm
Tinggi h = 1.00 m = 100.00 cm
2 Perhitungan
Luas PenampanAg = bxh
= 4500.00 cm2
Ttk. Ordinat y = Pu
ϕ x Ag x 0.85 x f'c
= 18,540.00
539,516.25
= 0.034
e1 = Mu
Pu
= 74.27 cm
e1 / h = 0.74
Ttk. Absis x = Pu e1
x
ϕ x Ag x 0.85 x f'c h
= 0.03 x 0.74
= 0.026
4 Tulangan Utama
Keb. Tulangan As (2 sisi) = ρ x Ag
= 36.00 cm2
As (1 sisi) = 18.00 cm2
Rasio = 0.0014
b = 450.00 mm
h = 1,000.00 mm
As = 882.00 mm2 → 0,0014 x b x h
0.350.35
0.20
0.50 0.50
0.20
5.00
6.10
3.25
6.00
0.20
0.65
Data-data teknis
1 f'c-K250 = 21.70 Mpa 11 Tbl. Balok = 0.65 m
2 fy-BjTD 40 = 400.00 Mpa 12 Tbl. Slab = 0.25 m
3 BJ Beton = 2,400.00 Kg/m3
4 BJ aspal = 2,200.00 Kg/m3 14 Tbl. ACWC= 0.05 m
5 Ka = 0.28 15 BJ Tanah = 1,800.00 Kg/m3
6 h = 5.00 m
7 b = 6.00 m
8 t = 0.45 m
9 h' = 5.45 m
10 b' = 6.45 m
B Perhitungan Momen
Mu = k x Wu x b'^2
12(k+2)
8.47
0.25
0.65
0.45
h3
TANAH SAMPING
5.00
LALU LINTAS
0.45
AC-WC
6.00
RIGID
==>> Beban Mati (WD)
Wall (Self Weight) = 0.45 x 5.45 x 2,400.00 = 5,886.00 kg/m
==>> Beban Hidup / Lalu Lintas (WL) + beban lalu lintas di girder
Lalu Lintas = 800.00 x 9.69 = 7,748.00 kg/m
Jumlah = 7,748.00 kg/m
B Perhitungan Momen
Mu = k x Wu x d'^2
12(k+2)
4
10 6
7d 7a
9
5
2.91 8
TANAH SAMPING
4.45
LALU LINTAS
0.70
0.80 2
0.93
1.23
AC-WC
RIGID
7e 7c 7b 7f
1
1.52
4.45
7.38
7.68
7.97
8.02
8.08
Hitung gaya vertikal dan gaya momen terhadap kaki depan (titik O)
balok girder di asumsikan sebagai beban titik di bidang 5 dengan beban setengah dr beban total
beban lalu lintas di sepanjang balok di asumsikan sebagai beban titik di bidang 5 dengan setengah dr beban total
No Berat W Jarak dr O Momen ke O
(Kg) (m) (Kg-m)
1 0.65 x 8.90 x 2,400.00 x 1.00 1.20 = 16,660.80 4.45 74,140.56
2 0.45 x 5.00 x 2,400.00 x 1.00 1.20 = 6,480.00 3.45 22,356.00
3 0.45 x 5.00 x 2,400.00 x 1.00 1.20 = 6,480.00 3.45 22,356.00
4 0.45 x 6.90 x 2,400.00 x 1.00 1.20 = 8,942.40 4.45 39,793.68
5 0.60 x 0.50 x 2,400.00 x 1.00 1.20 = 864.00 0.70 604.80
6 0.35 x 0.35 x 2,400.00 x 1.00 1.20 = 352.80 8.08 2,850.62
7(a,b) 0.20 x 0.20 x 2,400.00 x 1.00 x 0.50 1.20 = 115.20 7.38 850.18
7(c,d) 0.20 x 0.20 x 2,400.00 x 1.00 x 0.50 1.20 = 115.20 1.52 175.10
7e 0.20 x 0.20 x 2,400.00 x 1.00 x 0.50 1.20 = 57.60 0.93 53.57
7f 0.20 x 0.20 x 2,400.00 x 1.00 x 0.50 1.20 = 57.60 7.97 459.07
8 0.60 x 0.50 x 2,400.00 x 1.00 x 0.50 1.20 = 432.00 0.80 345.60
9 0.35 x 0.35 x 2,400.00 x 1.00 x 0.50 1.20 = 176.40 8.02 1,414.73
10 0.90 x 8.47 x 2,400.00 x 1.00 x 0.50 1.20 = 10,977.12 0.70 7,683.98
ACWC box 0.05 x 6.90 x 2,200.00 x 1.00 1.20 = 910.80 1.70 1,548.36
ACWC balok 0.05 x 8.47 x 2,200.00 x 1.00 x 0.50 1.20 = 559.02 2.70 1,509.35
beban LL 800.00 x 6.90 1.60 = 8,832.00 4.45 39,302.40
beban LL 800.00 x 8.47 x 0.50 1.60 = 5,420.80 0.70 3,794.56
ΣW 67,433.74 ΣM 219,238.57
Ka = 0.28
ΣPah = 0,5 x H^2 x γ x Ka
4
10 6
7d 7a
9
5
2.91 8
4.45
0.70 3
0.80 2
0.93
1.23
7e 7c 7b 7f
1
1.52
4.45
7.38
7.68
7.97
8.02
8.08
TNH. SMPG. 0.50 x 34.81 x 1,800.00 x 0.28 x 1.20 = 10,639.33 1.97 20,924.01
LL. LINTAS 800.00 x 5.90 x 1.60 = 7,552.00 5.95 44,934.40
balok 0.90 x 8.47 x 2,400.00 x 0.50 x 1.20 = 10,977.12 5.45 59,825.30
ΣPa 29,168.45 ΣM 125,683.72
Stabilitas terhadap penggeseran
Tahanan geser pada bag. Bawah fondasi sepanjang B = 8,90 m, dihitung dengan dasar bag. Bawah fondasi adalah sirtu (kasar),
sehingga sudut gesek δ = φ = 35 derajat dan adhesi c = 20 KN/m2 = 2000 Kg/m2
Rh = (c x B) + (ΣW x tg δ)
Rh = 2,000.00 x 8.90 + 67,433.74 x 0.70
17,800.00 + 47,203.62
65,003.62 Kg/m
xe = ΣMW - ΣMgl
ΣW
= 219,238.57 - 125,683.72
67,433.74
= 1.39 m
e = B/2 - xe
4.45 - 1.39
= 3.06 m > B/6 = 1.4833333 m
Gy. H = 29,168.45 Kg
Gy. V = 67,433.74 Kg
0,5H = 14,584.22
V+A' c ctg φ = 75,740.41
iq = 0.343
ic = iq - (1 - iq) / Nc tg φ
= 0.397
iγ = 0,7 xH
0,7H =
[ 1−
V + A ' .c.ctg ϕ
20,417.91
]
V+A' c ctg φ = 75,740.41
iγ = 0.208
qu = ic x c x N + iy x 0,5 x B' x γ x Ny
= 36,619.28 + 37,658.90
= 74,278.18 Kg/m2
Bila dihitung dengan berdasarkan lebar fondasi efektif (lebar fondasi efektif), yaitu tekanan ke tanah dasar terbagi rata secara sama, maka :
q' = V / B'
= 11,365.24
Faktor aman terhadap keruntuhan kapasitas dukung :
F = qu / q'
6.536 > 3 ( OK )
HITUNG MOMEN
V = 67,433.74 Kg/m
B = 8.9 m
q-maks = 134,867.48 / 8.32
= 16,201.94
Momen
Mu = 1 / 12 x q - maks x L^2
0.083 x 16,201.94 x 41.60
= 56,170.09 Kg-m
= 561.70 KN-m
PERHITUNGAN TULANGAN TOP SLAB
1 Data
Mutu beton f'c = 21.70 MPa
Mutu baja fy = 400.00 MPa
2 Mencari nilai k
Momen Mu = 67.31 kNm
Lebar b = 1.00 m
Tinggi d = 0.45 m
k = 332.41 kNm2 → Mu / b x d^2
= 0.33 MPa
6 Tulangan Bagi
SKSNI-T15-91-03 Pasal 3.16.12 hal. 155 ==> rasio tul. Bagi tidak boleh kurang dari 0.0014
Rasio = 0.0014
b = 1,000.00 mm
h = 450.00 mm
As = 882.00 mm2 → 0,0014 x b x h
1 Data
Mutu beton f'c = 21.70 MPa
Mutu baja fy = 400.00 MPa
2 Mencari nilai k
Momen Mu = 187.28 kNm
Lebar b = 1.00 m
Tinggi d = 0.45 m
k = 924.83 kNm2 → Mu / b x d^2
= 0.92 MPa
6 Tulangan Bagi
SKSNI-T15-91-03 Pasal 3.16.12 hal. 155 ==> rasio tul. Bagi tidak boleh kurang dari 0.0014
Rasio = 0.0014
b = 1,000.00 mm
h = 450.00 mm
As = 882.00 mm2 → 0,0014 x b x h
1 Data
Mutu beton f'c = 21.70 MPa
Mutu baja fy = 400.00 MPa
2 Mencari nilai k
Momen Mu = 561.70 kNm
Lebar b = 1.00 m
Tinggi d = 0.45 m
k = 2,773.83 kNm2 → Mu / b x d^2
= 2.77 MPa
6 Tulangan Bagi
SKSNI-T15-91-03 Pasal 3.16.12 hal. 155 ==> rasio tul. Bagi tidak boleh kurang dari 0.0014
Rasio = 0.0014
b = 1,000.00 mm
h = 450.00 mm
As = 882.00 mm2 → 0,0014 x b x h
5.90
1.20 2.00
0.60
3.50
B Data Teknis
Bj Beton = 2,400.00 Kg/m3 f'c = 21.70 Mpa
Bj Tanah = 1,800.00 Kg/m3 fy = 400.00 Mpa
Ka = 0.28
C Pembebanan
1 Vertikal
No Berat - W (per m) Jarak dari O Momen ke O Ket.
( Kg ) (m) ( Kg-m )
1 0.3 x 6.1 x 2,400 x 1.2 = 5,270.4 1.350 7,115.0 Wall
2 0.6 x 3.5 x 2,400 x 1.2 = 6,048.0 1.750 10,584.0 Footing
3 2 x 6.1 x 1,800 x 1.2 = 26,352.0 2.500 65,880.0 Kaki timbunan
Σ 37,670.4 83,579.0
2 Horisontal 0.30
Pa = 0,5 x H^2 x y x Ka
1.20 2.00
0.60
O
3.50
V = 37,670.40 Kg
B = 3.50 m
e = 0.58 m
2V = 75,340.80 Kg
3B-6e = 6.99 m
q-maks = 10,772.79 Kg/m
1 Data
Mutu beton f'c (K250) = 21.70 MPa
Mutu baja fy = 400.00 MPa
2 Mencari nilai k
Momen Mu = 215.46 kNm
Lebar b = 1.00 m
Tinggi d = 0.60 m
k = 598.49 kNm2
= 0.60 MPa
6 Tulangan Susut
d = 600.00 mm
t = 300.00 mm → d/2
Rasio = 0.0035
b = 1,000.00 mm
h = 300.00 mm
As = 1,470.00 mm2 → 0,0035 x b x h
1 Data
Mutu beton f'c = 21.70 MPa
Mutu baja fy = 400.00 MPa
2 Mencari nilai k
Momen Mu = 366.98 kNm
Lebar b = 1.00 m
Tinggi d = 0.30 m
k = 4,077.53 kNm2
= 4.08 MPa
6 Tulangan Susut
d = 300.00 mm
t = 150.00 mm → d/2
Rasio = 0.0035
b = 1,000.00 mm
h = 150.00 mm
As = 735.00 mm2 → 0,0035 x b x h