Professional Documents
Culture Documents
Laporan Mingguan 1 Blok 2
Laporan Mingguan 1 Blok 2
ALAMAT PERUSAHAAN : Desa Patila, Kec. Pammana, Kab Wajo, Sulawesi Selatan
Laporan Minggu ke :I
No.
Hari Jam Uraian Aktivitas Keterangan
Urut
Dismating Gt bottom
insulation partially for
Combustion Chamber
Manhole
Visual/Borescope Inspection
08.00 from Combuster Side Instruktur :
Senin s/d Open Exhaust Manhole and - Agus Salim
1
1 April 2019 16.30 Visual/borescope inspection Hanafi
from GT Exhaust side - Akbal
Reassembly plate Segment,
CC Manhole and GT bottom
insulation and close the
exhaust manhole
LAPORAN KULIAH KERJA PRAKTEK
POLITEKNIK ATI MAKASSAR
PT. CONSOLIDATED ELECTRIC ASIA POWER
Dismating Gt bottom
insulation partially for
Combustion Chamber
Manhole
Visual/Borescope Inspection
08.00 Instruktur :
from Combuster Side
Selasa s/d - Agus Salim
2 Open Exhaust Manhole and
2 April 2019 16.30 Hanafi
Visual/borescope inspection
- Akbal
from GT Exhaust side
Reassembly plate Segment,
CC Manhole and GT bottom
insulation and close the
exhaust manhole
Dismating Gt bottom
insulation partially for
Combustion Chamber
Manhole
Visual/Borescope Inspection Instruktur :
08.00
from Combuster Side - Agus
Rabu s/d
3 Open Exhaust Manhole and Salim
3 April 2019 16.30
Visual/borescope inspection Hanafi
from GT Exhaust side - Akbal
Reassembly plate Segment,
CC Manhole and GT bottom
insulation and close the
exhaust manhole
Instruktur :
08.00
- Agus
Kamis s/d GT22 HGP Assessment &
4 Salim
4 April 2019 16.30 Compresor Washing
Hanafi
- Akbal
Instruktur :
- - Agus
Jumat 08.00 GT22 HGP Assessment &
5 Salim
5 April 2019 s/d Compresor Washing
Hanafi
16.30
- Akbal
Pembimbing Lapangan