SOUTH CENTRAL RAILWAY

OFFICE OF THE
DIVISIONAL ELECTRICAL ENGINEER
CONSTRUCTION, GUNTAKAL-515801
Mail ID: eeecgtl@gmail.com

No.G/E.61/CN/TRD/GTL/2022-23/GY-Bypass/PTFE Date: 06.08.2022

Sr.DEE/Tr./GTL
Dy.CE/CN/GTL
Dy.CSTE/CN/GTL
Sr.DEN/Central/GTL
Sr.DOM/GTL

Sub:-Joint inspection to be conducted for finalising the possible appropriate location


for shifting of existing PTFE neutral section between GOOTY(GY)
-Jakkalacheruvu (JKO) -reg.
Ref: Approved Engineering scale plan(ESP) & Signal interlocking plan(SIP).

******

With reference to the above subject, as part of the ongoing works of GY


Byepass line electrification works, the existing PTFE location is getting affected due to the
proposed new crossover point after the ROB towards the RU end. It is observed that in order to
maintain a distance of at least 400 metres after the stop signal and 200 metres before the stop
signal, the existing PTFE location has to be sifted to an appropriate location. A joint inspection
is to be conducted, for finding the possible location for shifting of existing PTFEs to a
new location to avoid any constraints in the operating viewpoint.

Sl. Section UP/DN Existing Proposed new location


No Location

1 GY-JKO UP (Feeder 409/19-21 To be finalised after joint check.


BM-181)

2 JKO-GY DN (Feeder 409/20-22 To be finalised after joint check.


BM-182)

Hence, it is requested to assign concerned supervisor from your office to


attend for a joint inspection on 08.08.2022 for checking the possible appropriate
location for the erection of PTFE’s in GY-JKO section.

GUNDEPUR GUNDEPURI
SHOBHAN BABU
I SHOBHAN 2022.08.06
BABU 14:26:10 +05'30'
DEE/CN/GTL

Copy to: Dy.CEE/OHE/C/SC for kind information, please.


SSE/CN/GTL for information and NA.
Agency: M/s PURNA ENTERPRISES for necessary action.