Corrospondence Detail's Regd. Shifting of Electrical Utilities
XEN , Electrical division Regarding submission of DPR of Shifting of Electrical Utilities Ref letter (i)
2 19-Feb-21 PD -NHAI PD/SGR/14050/2020/MGCPL/37
JPDCL coming in the alignment of NH44 km 187 to 189.35 ED/BTT/6376-78 17.02.2021
XEN , Electrical division Regarding Shifting of Electrical utilities coming in the alignment of
3 20-Feb-21 Asstt XEN -JPDCL BESD/20-21/616-618
JPDCL NH44 km 187 to 189.35
In ref with MG letter 101 dt 15.02.21 & NHAI letter 19 dt 14.12.20 Ref letter (i)
PD/SGR/14050/2020/MGCPL/19
regd 33KVA Electrical Line falling within the ROW wherein it is
4 01-Mar-21 PD -NHAI Chief Engg -JPDCL PD/SGR/14050/2020/MGCPL/40 14.12.2020 (ii)
requested to direct the concerned officials to conduct a joint survey PD/SGR/14050/2020/MGCPL/10
along with the representative of our contractors. 1 15.02.2021
In ref with NHAI HQ letter 31 dt 22.09.20 and NHAI Policy Circular (i) NHAI/CVO/2020/31
22.09.2020
5 12-Mar-21 NHAI MGCPL PD/SGR/14050/2020/MGCPL/45 dt 06.01.21 regd submission of Utility Shifting Estimates wherein it
(ii) Circular no. 7.2.11/2021
is advised to submit the utility shifting estimates. 06.01.2021
(i)
Reply of NHAI letter 45 dt 12.03.21 regd submission of utility shifing PD/SGR/14050/2020/MGCPL/45
estimates, wherein we have informed that estimate is in under 12.03.2021 (ii)
6 13-Mar-21 MGCPL PD -NHAI MGCPL/Banihal Bypass/130 preparation by the Utility owning departments and requested to PD/SGR/14050/2020/MGCPL/11
write a letter to the above department for early submission of the 12.09.2020 (iii)
PD/SGR/14050/2020/MGCPL/37
estimates. 19.02.2021
Informed that some trees are lying along with 33KVA line at ch
A.E.E. SUB DIVISION
7 18-Mar-21 MGCPL MGCPL/Banihal Bypass/ 133 187.920 therefore requested to Shut down of Electricity sothat tree
RAMBAN
cutting felling work can be completed.
In ref with NHAI letter 19 & 40 dt 14.12.20 & 01.03.21 regd 33 KVA (i)
PD/SGR/14050/2020/MGCPL/19
electrical line falling within ROW wherein requested to submit the
8 22-Mar-21 PD -NHAI Chief Engg -JPDCL PD/SGR/14050/2020/MGCPL/48 14.12.2020 (ii)
estimate for the same duly authenticated by your goodself for our PD/SGR/14050/2020/MGCPL/40
further action. 01.03.2021
XEN- Sub Tranmission In ref with our letter 145 dt 05.04.21 regd request for Shutdown of
11 12-Apr-21 MGCPL MGCPL/Banihal Bypass/151
Division 33 Kva line in Banihal feeder on dt 15.04.21
XEN- Sub Tranmission In ref with our letter 151 dt 12.04.21 regd request for Shutdown of
12 15-Apr-21 MGCPL MGCPL/Banihal Bypass/158
Division 33 Kva line in Banihal feeder on dt 18.04.21
Ref letter
XEN- Sub Tranmission In ref with NHAI letter 40 dt 01.03.21 regd abstract estimate
13 19-Apr-21 SE, JPDCL STD/UDH/216-19 PD/SGR/14050/2020/MGCPL/40
Division amounting to Rs 56.94lacs for shifting of 33Kva electrical line 01.03.2021
Ref leltter
Regarding submission of DPR of Electrical Utilities in alignment of
14 23-Apr-21 XEN- JPDCL PD -NHAI ED/BTT/429-32 PD/SGR/14050/2020/MGCPL/37
NH44 19.02.2021
In ref with NHAI letter 55 dt 07.05.21 regd DPR of Shifting of (i) SEB/287-89 18.05.2021
Chief Engineer, Supertending Engineer, SEB/2530-31 22.03.2021 (ii)
19 27-May-21 CEJ/TS-II/NH/1593-97 Electrical utilities wherein they had recommended that may allowed
Distribution, JPDCL JPDCL PD/SGR/14050/2020/MGCPL/55
NHIDCL for shifting of electrical utilities. 07.05.2021
Reply of MG letter 199 dt 14.06.21 regd request for revision of utility (i)
25 15-Jun-21 TL -Ayoleeza MGCPL ACPL/AE/BANIHAL/68 shifting estimates wherein requested to kindly furnish the rate PD/SGR/14052/2020/Ayoleeza/3
analysis. 3 15.06.2021
PD/SGR/14050/2020/MGCPL/67
33 14-Jul-21 Asst XEN BANIHAL ED, batote BESD/20-21/150-151 Regarding shifting of Electrical Utilities.( Banihal bypass) 24.06.2021
intimated that we have not recieve any response regd our letter 242
38 07-Sep-21 MGCPL PD -NHAI MGCPL/Banihal Bypass/251 & 243 dt 06.09.21 & again requested to inspect the quality of
materials which has ready at factory site.
NHAI/PIU-Ramban/2021- In ref with MG letter 243 dt 01.09.21 regd inspection & qaulity
39 08-Sep-21 PD -NHAI XEN- JPDCL
22/11018/10 checking of procure materials.
In Continuation of our letter 243 & 251 dt 06.09.21 & 07.09.21 regd
40 10-Sep-21 MGCPL PD -NHAI MGCPL/Banihal Bypass/260 shifting of Electricals utilities wherein it is again requested to
instruct to his officials to inspect the quality of material
Intimated regd we have already finalized the vendors for shifting of Ref- MG Letter No. 242
electrical utilities & payment has already been released to the 01.09.2021, 243 06.09.2021,251
43 28-Sep-21 MGCPL PD -NHAI MGCPL/Banihal Bypass/274
vendors so requested to instruct his official to inspect the quality of 07.09.2021, 260 10.09.2021, 268
08.09.2021
materials at factory site.
Ref:- MGCPL/BANIHAL
In ref with our letter 190 & 199 dt 02.06.21 & 14.06.21 regd DPR for BYPASS/190 DATED
46 01-Dec-21 MGCPL TL -Ayoleeza MGCPL/Banihal Bypass/290 shifting of utilities wherein it is submit that the documents which has 02.06.2021 MGCPL/BANIHAL
required by PD/PIU-Ramban BYPASS/199 DATED
14.06.2021
Ref:- MGCPL/BANIHAL
Submission of requisite documents for shifting of 33Kva electrical
47 01-Dec-21 TL -Ayoleeza PD -NHAI ACPL/AE/BANIHAL/239 BYPASS/290 DATED
utilities lines 01.12.2021
Ref:- NHAI/PIU-
NHAI/RO- Approval of Estimate for shifting of 33Kva line for amounting
48 29-Dec-21 Manager (T), RO J&K PD -NHAI
Jammu/2020/B.Bypass/11031/50 to Rs.58,92,222/-
Ramban/2021/11018/22
10.08.2021
Informed regd we had executed the civil works of more than Ref : 242 dated 01.09.2021, 243
Rs.10.00 Cr at site and have also made advance payments to 06.09.2021, 251 07.09.2021 260
10.09.2021 268 18.09.2021 274
51 21-Jan-22 MGCPL PD -NHAI MGCPL/Banihal Bypass/756 the vendor for the shifting the electrical utilities therefore 28.09.2021 286 30.10.2021
requested to release of payments as 75% of the sanctioned NHAI/PIU-RAMBAN/2021-
estimate. 22/11018/24 dated 04.01.2022
In ref with Authority letter 293 dt 23.12.21 regd revised DPR for Ref : (i) ED/BTT/56182
NHAI/PIU- 23.12.2021 (ii)
54 11-Feb-22 PD -NHAI XEN -JPDCL
Ramban/2021/11018/30
shifting of electrical untilities wherein it is informed that the work his ACPL/AE/BANIHAL/293
different as per estimate and practically. 10.02.2022
Ref: 1) X.en JDPCL Letter NO.
Regarding Revised DPR for Shifting of Electrical utilities wherein it ED/BTT/6735-37 12.02.2022
NHAI/PIU-
55 14-Feb-22 Dy Manager (T) -NHAI MGCPL
Ramban/2021/11018/31
is informed that to submit drawing & design of the Tower or self- 2) NHAI/PIU-
supporting structures from a reputed consultancy. Ramban/2021/11018/30
11.02.2022 NHAI/PIU-
In ref with NHAI letter 31 dt 14.02.22 regd submit drawing & design
Ref : (i) NHAI/PIU-
MGCPL/Banihal Bypass/2021- of the Tower or self-supporting structures from a reputed
56 16-Feb-22 MGCPL TL -Ayoleeza
22/312
Ramban/2021/11018/31 dated
consultancy. Wherein it is replied that the reimbursement of 14.02.2022