Project : Rohto Mentholatum (Myanmar) Factory Phase II Project

Subject: MEP Shop Drawing Sumission Logsheet

Submitted Recived Dwg.


No System Submittal No Rev. Drawing No Description Working Day
Date date Rev.

53 7/26/2020 ELECTRICAL HPC-ROH-DWG-SUB-026 R1 HPC-ROH-ELE-5201 02 GENERAL SITE LIGHTING LAYOUT PLAN 21

61 7/26/2020 ELECTRICAL HPC-ROH-DWG-SUB-029 R1 HPC-ROH-ELE-5204 02 GENERAL SITE SOCKET LAYOUT PLAN 21

66 7/26/2020 ELECTRICAL HPC-ROH-DWG-SUB-031 R1 HPC-ROH-ELE-5206 02 SECOND FLOOR SOCKET LAYOUT PLAN 21

74 7/26/2020 ELECTRICAL HPC-ROH-DWG-SUB-035 R1 HPC-ROH-ELE-5202-1 02 FIRST FLOOR PIPING DETAIL LAYOUT PLAN 21

79 7/26/2020 ELECTRICAL HPC-ROH-DWG-SUB-037 R1 HPC-ROH-ELE-5202-3 02 FIRST FLOOR TRANKING PLAN 21

81 7/26/2020 ELECTRICAL HPC-ROH-DWG-SUB-038 R1 HPC-ROH-ELE-5207 02 General main site cable layout plan 21

91 7/23/2020 ACMV SYSTEM HPC-ROH-DWG-SUB-047 R0 HPC-ROH-AC-5202-4 00 Chilller & boiler detail plan 23

152 8/7/2020 FIRE FIGHTING HPC-ROH-DWG-SUB-092 R0 HPC-ROH-FA&FF-5201 00 Fire fighting & fire alarm approval drawing of government fire 12
& FIRE ALARM department
SYSTEM
159 8/7/2020 ELECTRICAL HPC-ROH-DWG-SUB-099 R0 HPC-ROH-CSD-5201 00 COMBINED SERVICES DRAWING FOR FIRST FLOOR PLAN 12
SYSTEM