Document type TRA-SBJ-TEC-EL-GEN-00183-R06

TECHNICAL SUBMITTAL for MDB-H-2 & Associated Panels


Load Schedules

Project : The Royal Atlantis Resort and Residences (TRA)


Client: ATLANTIS THE PALM LIMITED 2 (ATP2)
Consultant: DYNAMIC EINGINEERING CONSULTANTS (DEC)
Main Contractor : SsangYong - Besix Joint Venture (SBJV)
MEP subcontractor: SsangYong - Besix Joint Venture (SBJV)
INDEX
REFERENCE PAGE NO

MDB-H-2 1

BB-H3-02 2

SMDB-H3-1601 3

DB-H3-1601-01 4

SMDB-H3-1701 5

SMDB-H3-1801 6

SMDB-H3-1801-BS 7

DB-H3-1801-BS-01 8

DB-H3-1801-BS-02 9

DB-H3-1901-BS-01 10

DB-H3-1801-BS-04 11

DB-H3-1801-BS-05 12

DB-H3-1801-BS-07 13

DB-H3-1701-BS-01 14

DB-H3-1801-01 15

SMDB-H3-1901 16

DB-H3-1901-01 17

SMDB-H3-2201 18

DB-H3-2201-08 19

DB-H3-2201-09 20

DB-H3-2201-10 21

SMDB-H3-2301 22

DB-H3-2301-01 23

BB-H1-05 24

SMDB-H1-3501 25

SMDB-H1-3601 26

DB-H1-3601-01 27

SMDB-H1-3701 28

SMDB-H1-3801 29

DB-H1-3801-01 30

SMDB-H1-3901 31

DB-H1-3901-01 32

SMDB-H1-4001 33

SMDB-H1-4101 34

DB-H1-4101-01 35
DB-H1-4101-01-PRE. SUITE 36
DB-H1-4101-02-PRE. SUITE 37

SMDB-H1-4201 38

SMDB-H1-4301 39

DB-H1-4301-01 40

DB-H1-4301-01-ROYAL SUITE 41

DB-H1-4301-02-ROYAL SUITE 42

SMDB-H3-LG01 43

DB-H3-LG01-01 44

DB-H3-LG01-02 45

Page 1 COVER PAGE MDB-H-2


REFERENCE NUMBER DATE TITLE
F+G-5134309-ATP2-LET-01980 2/7/2019 Release of Consolidated Electrical IFCs
TRA-SBJ-RFI-EL-GEN-06329 12/20/2018 M2 & M3 Missing Electrical Panels Schedule
TRA-SPE-TEC-AC-GEN-00031 08/-01/2019 Fan Coil Units Selection & Manufacturing Details – Part 3
TRA-SPE-TEC-AC-GEN-00219 2/19/2019 Technical Submittal for Fan Coil Units Selection & Manufacturing Details – Part 7
TRA-SPE-TEC-AC-GEN-00030 10/27/2018 Fan Coil Units Selection & Manufacturing Details – Part 2
172/PJCRC19-27/SH/SBJ/19/01703 5/7/2019 M2M3-L22-Toilets-L21-L24-Hakkasan-MEP

172/PJCRC19-27/SH/SBJ/19/01713 5/15/2019 WSP MEP Upper Suites IFCs-L40 TO L46

TRA-LTR-TCI-DEC-0425 4/16/2020 HoRoyal, Presidential and Bridge Suites Updated Drawings EIP 557 & 562 - IFC Submission

TRA-LTR-TCI-DEC-0454 06/05/2020 Hotel Bridge Suite Level 18 BOH Kitchen MEP Drawings (EIP 562) - IFC Submission

TRA-LTR-TCI-DEC-0594 8/10/2020 Royal Suite Lighting IFC Submission

TRA-LTR-TCI-DEC-0736 29/11/2020 L22 Main Sky Bridge Revised VVIP Cabana MEP

TRA-LTR-TCI-DEC-0815 2/10/2021 Signature Suites Electrical & ICT and Bridge Suite Terrace Lighting Drawings - IFC Submission
RELATED DOCUMENTS

DRAWING NUMBER DATE TITLE


TRA-SPE-TEC-EL-GEN-00123 20/12/2018 Technical Submittal for Manufacturing Drawings of MDB-H-2 & Associated Panels
TRA-SPE-SDG-PS-L00-00009-06 2/27/2019 Lower Ground Small Power Layout Area 9

01-M40-01-62-59 9/5/2018 VENTILATION SCHEMATIC AHU's PODIUM LEVELS

Site/Design Issue Resolution Form No. 0237: Changes to electrical Breakers based on DEWA LV
TRA-DEC-SBJ-01943 1/7/2020
Approval
TRA-SBJ-RFI-EL-GEN-12518-00 4/26/2020 Power Provision for Balcony Light/Lift Machine Room FCU's
Site/Design Issue Resolution Form No. 0237: Changes to electrical Breakers based on DEWA LV
TRA-DEC-SBJ-01943 1/7/2020
Approval
TRA-SBJ-RFI-EL-GEN-11634 4/13/2020 M2&M3: Reception Desk Millwork Changes - Power & Data Outlets Requirement
TRA-SPE-FCN-EL-GEN-00559 28/07/2020 Reception Desk Millwork Changes - Power & Data Outlets Requirement
TRA-SPE-FCN-EL-GEN-00478 6/21/2020 Automatic Soap Dispenser Power Supply (Level 21 & Level 22)
TRA-SPE-TEC-EL-GEN-00100 (REV 02), 00103 (REV 02), 00110 (REV 02) & 00108 (REV 01)
TRA-SBJ-RFI-EL-GEN-13556 24/09/2020
Clarifications
TRA-SBJ-FCN-EL-L22-05346 31/05/2022 M2/M3: SMDB-H3-2401-HK feeder is relocated from SMDB-H2-2301 to SMDB-H3-2201 panel

TRA-SBJ-FCN-EL-GEN-05464 13/07/2022 M2/M3: Level 17 & 42 FCU Power Provision (FCN # 05384)

TRA-SBJ-FCN-WS-GEN-05384 6/6/2022 M2/M3: WATER SUPPLY SYSTEM PRESSURIZATION SYSTEM RELOCATION

This shop drawings replace and supersede the below listed shop drawings.

DRAWING NUMBER TITLE


TRA-SPE-SDG-PS-B00-00062 Basement Small Power DB Schedule Layout Sheet 62(MDB-H-2)
TRA-SPE-SDG-PS-L16-00007 16th Floor Small Power DB Schedule Layout Sheet 7 (MDB-H-2)
TRA-SPE-SDG-PS-L17-00005 17th Floor Small Power DB Schedule Layout Sheet 5 (MDB-H-2)
TRA-SPE-SDG-PS-L18-00006 18th Floor Small Power DB Schedule Layout Sheet 6 (MDB-H-2)
TRA-SPE-SDG-PS-L19-00006 19th Floor Small Power DB Schedule Layout Sheet 6 (MDB-H-2)
TRA-SPE-SDG-PS-L22-00010 22nd Floor Small Power DB Schedule Layout Sheet 10 (MDB-H-2)
TRA-SPE-SDG-PS-L23-00010 23rd Floor Small Power DB Schedule Layout Sheet 10 (MDB-H-2)
TRA-SPE-SDG-PS-L35-00004 35th Floor Small Power DB Schedule Layout Sheet 4 (MDB-H-2)
TRA-SPE-SDG-PS-L36-00005 36th Floor Small Power DB Schedule Layout Sheet 5 (MDB-H-2)
TRA-SPE-SDG-PS-L37-00004 37th Floor Small Power DB Schedule Layout Sheet 4 (MDB-H-2)
TRA-SPE-SDG-PS-L38-00004 38th Floor Small Power DB Schedule Layout Sheet 4 (MDB-H-2)
TRA-SPE-SDG-PS-L39-00004 39th Floor Small Power DB Schedule Layout Sheet 4 (MDB-H-2)
TRA-SPE-SDG-PS-L40-00003 40th Floor Small Power DB Schedule Layout Sheet 3 (MDB-H-2)

Page 2 COVER PAGE MDB-H-2


TRA-SPE-SDG-PS-L41-00003 41st Floor Small Power DB Schedule Layout Sheet 3 (MDB-H-2)
TRA-SPE-SDG-PS-L42-00003 42nd Floor Small Power DB Schedule Layout Sheet 3 (MDB-H-2)
TRA-SPE-SDG-PS-L43-00003 43rd Floor Small Power DB Schedule Layout Sheet 3 (MDB-H-2)
TRA-SPE-SDG-PS-L00-00028 Lower Ground Small Power DB Schedule Layout Sheet 28 (MDB-H-2)

Page 3 COVER PAGE MDB-H-2


The references of the mechanical
FAHU EQUIP. ID TEC Status
equipments technical submittals

MAU-B1-1 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-2 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-3 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-4 TRA-SPE-TEC-AC-GEN-00027 B

MAU-B1-5 TRA-SPE-TEC-AC-GEN-00027 B

AHU-B1-5 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-6 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-8 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-9 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-10 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-12-3 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-13-2 TRA-SPE-TEC-AC-GEN-00068 B

AHU-B1-13-3 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-13-5 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-14-1 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-14-2 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-14-3 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-15 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-16 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-17-1 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-17-2 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-18 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-19 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-22-1 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-22-2 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-22-3 TRA-SPE-TEC-AC-GEN-00026 B

AHU-B1-23-1 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-23-2 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-24 TRA-SPE-TEC-AC-GEN-00004 B
The references of the mechanical
FAHU EQUIP. ID TEC Status
equipments technical submittals

AHU-B1-25 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-26 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-27 TRA-SPE-TEC-AC-GEN-00006 B

AHU-B1-28 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-29 TRA-SPE-TEC-AC-GEN-00004 B

AHU-B1-30 TRA-SPE-TEC-AC-GEN-00004 B

AHU-RR-01 TRA-SPE-TEC-AC-GEN-00079 B

MAU-RR-01 TRA-SPE-TEC-AC-GEN-00079 B

MAU-RR-02 TRA-SPE-TEC-AC-GEN-00079 B

DOAHU-B1-MK-01 TRA-SPE-TEC-AC-GEN-00026 B

AHU-FC-01 TRA-SPE-TEC-AC-GEN-00149 B

AHU-LG-01 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-02 TRA-SPE-TEC-AC-GEN-00011 B

AHU-02-01 TRA-SPE-TEC-AC-GEN-00167 B

MAU-LG-01 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-03 TRA-SPE-TEC-AC-GEN-00026 B

AHU-LG-04 TRA-SPE-TEC-AC-GEN-00149 B

DOAHU-LG-02 TRA-SPE-TEC-AC-GEN-00027 B

MAU-LG-02 TRA-SPE-TEC-AC-GEN-00149 B

AHU-LG-05 TRA-SPE-TEC-AC-GEN-00026 B

AHU-01-10 TRA-SPE-TEC-AC-GEN-00027 B

AHU-LG-06 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-07 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-08 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-09 TRA-SPE-TEC-AC-GEN-00026 B

AHU-LG-11 TRA-SPE-TEC-AC-GEN-00011 B

AHU-LG-12 TRA-SPE-TEC-AC-GEN-00011 B

MAU-02-01 TRA-SPE-TEC-AC-GEN-00079 B

AHU-01-08 TRA-SPE-TEC-AC-GEN-00150 B
The references of the mechanical
FAHU EQUIP. ID TEC Status
equipments technical submittals

AHU-01-09 TRA-SPE-TEC-AC-GEN-00150 B

AHU-04-01 TRA-SPE-TEC-AC-GEN-00150 B

MAU-04-01 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-04 TRA-SPE-TEC-AC-GEN-00079 B

AHU-04-02 TRA-SPE-TEC-AC-GEN-00150 B

MAU-04-02 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-03 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-04 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-05 TRA-SPE-TEC-AC-GEN-00079 B

MAU-04-06 TRA-SPE-TEC-AC-GEN-00079 B

AHU-CA-01 TRA-SPE-TEC-AC-GEN-00026 B

AHU-CA-02 TRA-SPE-TEC-AC-GEN-00027 B

AHU-CA-03 TRA-SPE-TEC-AC-GEN-00027 B

AHU-CA-04 TRA-SPE-TEC-AC-GEN-00027 B

AHU-CA-05 TRA-SPE-TEC-AC-GEN-00026 B

MAU-CA-01 TRA-SPE-TEC-AC-GEN-00027 B

DOAHU-SPA-01 TRA-SPE-TEC-AC-GEN-00011 B

AHU-AD-LG-01 TRA-SPE-TEC-AC-GEN-00026 B

MAU-AD-LG-01 TRA-SPE-TEC-AC-GEN-00026 B

DOAHU-B1-MK-01 TRA-SPE-TEC-AC-GEN-00076 B

AHU-LG-Z9-01 TRA-SPE-TEC-AC-GEN-00036 B

AHU-02-BR-01 TRA-SPE-TEC-AC-GEN-00167 B

MAU-LG-BR-01 TRA-SPE-TEC-AC-GEN-00167 B

AHU-MR-B1-02 TRA-SPE-TEC-AC-GEN-00167 B

MAU-MR-B1-01 TRA-SPE-TEC-AC-GEN-00149 B

AHU-MR-B1-01 TRA-SPE-TEC-AC-GEN-00149 B

MAU-MR-B1-02 TRA-SPE-TEC-AC-GEN-00149 B
The references of the mechanical equipments
EQUIPMENT REFERENCE TEC Status
technical submittals

TEF-B1-1 TRA-SPE-TEC-AC-GEN-00127 B

TEF-B1-4 TRA-SPE-TEC-AC-GEN-00127 B

TEF-B1-5 TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-1 TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-2,3,3a TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-New TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-4 TRA-SPE-TEC-AC-GEN-00127 B

TSF-B1-5 TRA-SPE-TEC-AC-GEN-00127 B

DWEF-LG-01 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-LG-02 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-LG-04 TRA-SPE-TEC-AC-GEN-00021 B

PEF-B1-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-3 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-4 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-5 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-6 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-7 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-8-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-8-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-8-3 TRA-SPE-TEC-AC-GEN-00099 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

PEF-B1-9-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-9-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-10-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-21 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-11-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-11-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-11-3 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-12 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-13 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-14-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-15 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-16-1 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-16-2 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-17 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-18 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-19 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-20 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-22 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-23 TRA-SPE-TEC-AC-GEN-00099 B

SEF-45-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-36-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-21-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-21-2 TRA-SPE-TEC-AC-GEN-00098 B

SEF-29-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-38/37-1 TRA-SPE-TEC-AC-GEN-00098 B

SEF-B1-ETS-01 TRA-SPE-TEC-AC-GEN-00098 B

FP-REF-1 TRA-SPE-TEC-AC-GEN-00021 B

GEF-LG-01 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-02 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-03 TRA-SPE-TEC-AC-GEN-00015 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

GEF-LG-04 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-06 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-07 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-08 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-09 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-10 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-12 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-14 TRA-SPE-TEC-AC-GEN-00015 B

GEF-LG-15 TRA-SPE-TEC-AC-GEN-00015 C

LPF-45-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-35-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-21-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-3 TRA-SPE-TEC-AC-GEN-00097 B

LPF-20-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-20-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-4 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-7 TRA-SPE-TEC-AC-GEN-00097 B

LPF-29-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-29-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-5 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-8 TRA-SPE-TEC-AC-GEN-00097 B

LPF-37-1 TRA-SPE-TEC-AC-GEN-00097 B

LPF-37-2 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-6 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-9 TRA-SPE-TEC-AC-GEN-00097 B

LPF-B1-10 TRA-SPE-TEC-AC-GEN-00097 B

SPF-45-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-35-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-2 TRA-SPE-TEC-AC-GEN-00097 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

SPF-21-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-3 TRA-SPE-TEC-AC-GEN-00097 B

SPF-20-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-4 TRA-SPE-TEC-AC-GEN-00097 B

SPF-29-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-5 TRA-SPE-TEC-AC-GEN-00097 B

SPF-37-1 TRA-SPE-TEC-AC-GEN-00097 B

SPF-B1-6 TRA-SPE-TEC-AC-GEN-00097 B

KEU-B1-1 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-2 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-3 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-4 TRA-SPE-TEC-AC-GEN-00038 B

KEU-LG-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-02 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-03 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-07 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-04 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-05 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-08 TRA-SPE-TEC-AC-GEN-00038 B

KEU-04-09 TRA-SPE-TEC-AC-GEN-00038 B

KEU-LG-03 TRA-SPE-TEC-AC-GEN-00038 B

KEU-RR-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-RR-02 TRA-SPE-TEC-AC-GEN-00038 B

KEU-CA-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-CA-02 TRA-SPE-TEC-AC-GEN-00038 B

KEU-B1-MK-01 TRA-SPE-TEC-AC-GEN-00038 B

KEU-AD-LG-01 TRA-SPE-TEC-AC-GEN-00038 B

TEF-LG-01 TRA-SPE-TEC-AC-GEN-00021 B

TEF-LG-02 TRA-SPE-TEC-AC-GEN-00021 B

TEF-LG-04 TRA-SPE-TEC-AC-GEN-00021 B

EF-LG-05 TRA-SPE-TEC-AC-GEN-00021 B

EF-LG-08 TRA-SPE-TEC-AC-GEN-00021 B
The references of the mechanical equipments technical
EQUIPMENT REFERENCE TEC Status
submittals

EF-LG-09 TRA-SPE-TEC-AC-GEN-00021 B

TEF-02-01 TRA-SPE-TEC-AC-GEN-00021 B

TEF-CA-01 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-1 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-2 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-3 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-4 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-6 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-9 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-10 TRA-SPE-TEC-AC-GEN-00021 B

TXF-B1-11 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-3 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-3 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-4 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-5 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-6 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-7 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-13 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-14 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-15 TRA-SPE-TEC-AC-GEN-00021 B

UEF-B1-15 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-16 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-17 TRA-SPE-TEC-AC-GEN-00021 B

USF-B1-18 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-2 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-01 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-02 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-03 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-04 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-05 TRA-SPE-TEC-AC-GEN-00021 B

EF-B1-MK-07 TRA-SPE-TEC-AC-GEN-00021 B

TEF-LG-07 TRA-SPE-TEC-AC-GEN-00021 B

EF-01-02 TRA-SPE-TEC-AC-GEN-00021 B

GEF-H-01 TRA-SPE-TEC-AC-GEN-00021 B
The references of the mechanical equipments
EQUIPMENT REFERENCE TEC Status
technical submittals

GEF-H-02 TRA-SPE-TEC-AC-GEN-00021 B

GEF-H-03 TRA-SPE-TEC-AC-GEN-00021 B

GEF-H-04 TRA-SPE-TEC-AC-GEN-00021 B

EF-RR-01 TRA-SPE-TEC-AC-GEN-00214 B

KEF-RR-01 TRA-SPE-TEC-AC-GEN-00021 B

KEF-RR-02 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-RR-01 TRA-SPE-TEC-AC-GEN-00021 B

GPEF-RR-01 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-AD-LG-01 TRA-SPE-TEC-AC-GEN-00021 B

TEF-FC-01 TRA-SPE-TEC-AC-GEN-00021 B

DWEF-FC-02 TRA-SPE-TEC-AC-GEN-00021 B

KEF-FC-03 TRA-SPE-TEC-AC-GEN-00021 B

GEF-FC-04 TRA-SPE-TEC-AC-GEN-00021 B

PEF-B1-14 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-20 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-23 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-22 TRA-SPE-TEC-AC-GEN-00099 B

PEF-B1-19 TRA-SPE-TEC-AC-GEN-00099 B
The references of the mechanical
SL NO FAHU EQUIP. ID TEC Status
equipments technical submittals

1 AHU-H-43-1 TRA-SPE-TEC-AC-GEN-00025 B

2 AHU-H-33-1 TRA-SPE-TEC-AC-GEN-00025 B

3 AHU-H-21-1 TRA-SPE-TEC-AC-GEN-00025 B

4 AHU-R-19-1 TRA-SPE-TEC-AC-GEN-00036 B

5 AHU-R-29-1 TRA-SPE-TEC-AC-GEN-00025 B

6 AHU-R-37-1 TRA-SPE-TEC-AC-GEN-00025 B

7 AHU-H-B1-1 TRA-SPE-TEC-AC-GEN-00010 B

8 AHU-H-B1-2 TRA-SPE-TEC-AC-GEN-00010 B

9 AHU-H-B1-3 TRA-SPE-TEC-AC-GEN-00010 B

10 AHU-R-B1-4 TRA-SPE-TEC-AC-GEN-00012 B

11 AHU-R-B1-5 TRA-SPE-TEC-AC-GEN-00012 B

12 AHU-R-B1-6 TRA-SPE-TEC-AC-GEN-00012 B
DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND
AREA: Palm Jumeirah Crescent, Dubai U.A.E.
PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

REF: MDB-H-2 CONSULTANT: DEC/WSP LOCATION : HOTEL B1 LEVEL -SUB/STN #1-B-1402

CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
2500(D/O)
INCOMER 4P 50 BY DEWA 2x1C 150 1 2400/5A CT
SET@0.85
Via Temporary Flexible Cable
DEWA MOBILE GENERATOR INCOMER 4P 2500(D/O) Non Auto 50 EPR/ HOFR CSP 12X1C 630 3X1C 400 5
( RFI 3575 & MAR 00468)
OUT GOING:

PFC TP 800 50 XLPE/LSF/SWA/LSF/CU 2x4C 300 2x1C 150 10 350 kVAR CAPACITOR BANK 3x100Kvar+1x50Kvar(4 steps)

BB-H3-02 TP 1250 50 1350A BUSBAR 160 236.40 226.16 236.18 698.74 576.24 BMS METER

BB-H1-05 TP 1600 50 3200A BUSBAR 320 181.51 180.21 185.35 547.07 402.52 BMS METER

MOVED FROM MDB-H-13(MECHANICAL LOAD


SMDB-H3-LG01 TP 400 50 XLPE/LSF/SWA/LSF/CU 4C 300 1C 150 70 57.33 58.48 57.46 173.27 135.74
UPDATED)

TOTAL CONNECTED LOAD PER PHASE 475.24 464.86 478.98 1419.08 1114.50

MAXIMUM DEMAND [3PH] @ D.F 0.79 = 1114.50kW TOTAL CONNECTED LOAD [3 PH] 1419.08 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 1


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF:BB-H3-02
CONSULTANT: DEC/WSP LOCATION : HOTEL CORE-3 ELEC. CLOSET
SMDB CONNECTED TO: MDB-H-2
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 1250 1350A BUSBAR 160

OUT GOING:

SMDB-H3-1601 TP 160 SET AT 125 25 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8 20.03 19.69 19.43 59.15 42.32

SMDB-H3-1701 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8 9.92 9.55 17.62 37.08 27.72

SMDB-H3-1801 TP 630 25 XLPE/LSF/SWA/LSF/CU 2x4C 300 2x1C 150 8 108.39 96.14 102.68 307.21 262.21

SMDB-H3-1901 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8 12.79 15.46 14.39 42.64 31.24

SMDB-H3-2201 TP 250 25 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8 47.71 49.53 46.63 143.86 119.59 BMS METER

SMDB-H3-2301 TP 250 25 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8 37.57 35.79 35.42 108.79 93.17 AS PER NEW IFC

TOTAL CONNECTED LOAD PER PHASE 236.40 226.16 236.18 698.74 576.24

MAXIMUM DEMAND [3PH] @ D.F 0.82 = 576.24kW TOTAL CONNECTED LOAD [3 PH] 698.74 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 2


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-1601
LOCATION : ELECTRICAL ROOM (16305)
CONSULTANT: DEC/WSP
LEVEL 16TH CORE 3
SMDB CONNECTED TO: BB-H3-02
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
DB NO. MCCB kA SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) -1 (2) (3)
N/A KW KW

INCOMER TP 160 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8

OUT GOING:

DB-H3-1601-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 26 3.92 3.92 2.73 A17.2-H1626

DB-H3-1601-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 24 3.69 3.69 2.60 A16.2-H1625

DB-H3-1601-RM03 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 31 3.92 3.92 2.83 A11.2-H1624

DB-H3-1601-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 33 3.69 3.69 2.60 A10.2-H1623

DB-H3-1601-RM05 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 42 3.69 3.69 2.60 A10.2 (R) H1622

DB-H3-1601-RM06 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 45 3.92 3.92 2.73 A14.2 (R)-H1621

DB-H3-1601-RM07 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 55 3.92 3.92 2.73 A15.2-H1620

DB-H3-1601-RM08 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 55 3.92 3.92 2.73 A9.2-H1631

DB-H3-1601-RM09 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 45 3.92 3.92 2.73 A8.2 (R)-H1630

DB-H3-1601-RM10 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 42 3.69 3.69 2.60 A5.2 (R)-H1629

DB-H3-1601-RM11 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 33 3.69 3.69 2.60 A5.2-H1628

DB-H3-1601-RM12 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 31 3.92 3.92 2.73 A6.2-H1627

DB-H3-1601-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 4.81 4.01 4.44 13.26 10.12 AS PER SDIR 237

TOTAL CONNECTED LOAD PER PHASE 20.03 19.69 19.43 59.15 42.32

MAXIMUM DEMAND [3PH] @ D.F 0.72 = 42.32kW TOTAL CONNECTED LOAD [3 PH] 59.15 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 3


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-1601-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (16305) LEVEL 16TH CORE 3 MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H3-1601

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

FCU/CAV
OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

W/H
HD

SB
R Y B

1 R1 16 2.5 2.5 FACADE LIGHTING ENDWALL-14 TO 16 7.2 20 43 XP22(24x0.3) 1.00 0.04

2 Y1 16 2.5 2.5 16TH FLOOR BALCONY LIGHT 4 36.7 73 XL22( 8x0.5 ) 1.00 0.07

STOR.-16308,VEST.-16307,ICE STOR.-16309, PLUMBING-


3 B1 16 2.5 2.5 16304,ELECT RM-16305, 2,2,5 31, 26, 32 274 LIGHT TYPE-B-FL5, B-D3a,B-D2a 1.00 0.27
40A, 4P, ELEVATOR LOBBY-16300,IT RM-16303
100mA
STOR.-17304,VEST.-17305,ICE STOR.-17309, PLUMBING-
4 R2 16 2.5 2.5 17308,ELECT RM-17306, ELEV. 5,3,3 31, 26, 32 329 LIGHT TYPE-B-FL5, B-D3a,B-D2a 1.00 0.33
LOBBY-17302,IT RM-17303,STAIR VEST.-18310

5 Y2 16 2.5 2.5 FACADE LIGHTING ENDWALL-14 TO 16 4.35 2.2 10 XU21 (29Nos) 1.00 0.01

6 B2 16 2.5 2.5 FACADE LIGHTING ENDWALL-14 TO 16 38.5 15 578 XL20 1.00 0.58

SERVICE LOBBY-16302, CAV-H-16-5,


7 R3 20 4 4 2 100 200 0.90 0.18
ELEVATOR LOBBY-16300 CAV-H-16-6

CAV-H-17-3,FCU-H-17-EL-3B/ CONDENSATE PUMP


40A, 4P,
8 Y3 20 4 4 ELEVATOR LOBBY-17300 2 253, 100 453 (LOAD REVISED AS PER TRA-SPE-TEC-AC-GEN-00031- 0.90 0.41
100mA
01) & (SDIR-0007)

9 B3 20 SPARE 100 1.00 0.10

FCU-H-16-EL-3 / CONDENSATE PUMP (LOAD


10 R4 20 4 4 ELEVATOR LOBBY-16300 1 1 713, 100 813 REVISED AS PER TRA-SPE-TEC-AC-GEN-00031-01) & 0.90 0.73
(SDIR-0007)
40A, 4P,
100mA FCU-H-17-EL-3A/ CONDENSATE PUMP (LOAD
63A,TP, ISOLATOR

11 Y4 20 4 4 ELEVATOR LOBBY-17300 1 1 713, 100 813 REVISED AS PER TRA-SPE-TEC-AC-GEN-00031-01) & 0.90 0.73
(SDIR-0007)

12 B4 20 4 4 17th FLR SKYCOURT PROJECTOR 1 240 240 0.50 0.12

STOR.-16308,VEST.-16307,CORRIDOR-16201b,
13 R5 32 2X4 2X4 7 200 1400 RING 0.50 0.70
IT RM-16303,ELEVATOR LOBBY-16300

CORRIDOR-16201b,PLUMBING-16304,
14 Y5 32 2X4 2X4 5 200 1000 RING 0.50 0.50
ELECT RM-16305,ELEVATOR LOBBY-16300

ELECTR. RM-17306,ELEVATOR LOBBY-17300,


40A, 4P, 15 B5 32 2X4 2X4 CORRIDOR-17301,VEST.-17305, 6 200 1200 RING 0.50 0.60
30mA SERVICE LOBBY-17302,

CORRIDOR-17301,STAIR VEST.-17310,
16 R6 32 2X4 2X4 7 200 1400 RING 0.50 0.70
ICE STOR.-17309,PLUMB.-17308,PLUMB.-17307

17 Y6 20 4 4 16TH FLR ICE MAKER 1 500 500 0.90 0.45

18 B6 20 4 4 ICE STOR.-17309 1 500 500 0.50 0.25

19 R7 16 2.5 2.5 17TH FLR LIGHTING CR09-93,111,114 2,5,6 6,49 309 LIGHT TYPE-R09,C04,C04.1 1.00 0.31

20 Y7 16 2.5 2.5 17TH FLR LIGHTING CR09-91,101,112 8,3,5 14,10,9.5 190 LIGHT TYPE-R06,DS,R05,R08 1.00 0.19

40A, 4P, 21 B7 16 2.5 2.5 17TH FLR LIGHTING CR09-92,102,113 1,2,3 10,20,9.5 79 LIGHT TYPE-DL,DP,R06.1 1.00 0.08
100mA
22 R8 16 2.5 2.5 16TH FLR LIGHTING CR14-81,92,93,94 6,3,2,2 2.5,14,10,20 117 LIGHT TYPE-R09,R06,DS,DP 1.00 0.12

23 Y8 16 2.5 2.5 16TH FLR LIGHTING CR14-82,91 44,1 6,10 274 LIGHT TYPE-C04,C04.1,DL 1.00 0.27

24 B8 16 SPARE 1000 1000 1.00 1.00

25 R9 20 SPARE 200 1.00 0.20


40A, 4P,
26 Y9 16 2.5 2.5 FACADE LIGHTING ENDWALL-18 TO 20 19 36.7 697 XL21 1.00 0.70
100mA
27 B9 16 2.5 2.5 FACADE LIGHTING ENDWALL-18 TO 20 31.6 15 474 XL20 1.00 0.47
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ TOTAL LOAD PER PHASE 4811 4010 4444 0.76 10.12
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 13.26 KW
TOTAL LOAD (KW) 13.26
AMPS : 21.27 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 4


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-1701
LOCATION : ELECTRICAL ROOM (17306)
CONSULTANT: DEC/WSP
LEVEL 17TH CORE 3
SMDB CONNECTED TO: BB-H3-02
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 125 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8

OUT GOING:

DB-H3-1701-RM01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 38 4.96 4.77 5.02 14.75 11.45 B5.1 (R)-H1711

DB-H3-1701-RM02 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 36 4.96 4.77 5.02 14.75 11.45 B8.1 (R)-H1712

DB-H3-1701-RM03 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 22 7.58 7.58 4.83 B9.1-H1713

TOTAL CONNECTED LOAD PER PHASE 9.92 9.55 17.62 37.08 27.72

MAXIMUM DEMAND [3PH] @ D.F 0.75 = 27.72kW TOTAL CONNECTED LOAD [3 PH] 37.08 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 5


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-1801
LOCATION : ELECTRICAL ROOM (18306)
CONSULTANT: DEC/WSP
LEVEL 18TH CORE 3
SMDB CONNECTED TO: BB-H3-02
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 800 XLPE/LSF/SWA/LSF/CU 2x4C 300 2x1C 150 8

OUT GOING:

DB-H3-1801-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 29 3.69 3.69 2.60 A2.1 (H1827)

DB-H3-1801-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 36 3.92 3.92 2.73 A18.1 (H1828)

DB-H3-1801-RM03 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 37 3.69 3.69 2.60 A30.1 (H1829)

DB-H3-1801-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 21 3.69 3.69 2.60 A22.1 (H1831)

DB-H3-1801-RM05 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 30 3.69 3.69 2.60 A23.1 (H1832)

DB-H3-1801-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 5.28 4.43 3.70 13.40 10.21 ELECTR RM-18306

DB-H3-1801-RM06 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 31 3.92 3.92 2.73 A31.1 (H1830)

DB-H3-1801-RM07 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 38 3.92 3.92 2.73 A24.1 (H1833)

SMDB-H3-1801-BS TP 500 25 XLPE/LSF/SWA/LSF/CU 2x4C 300 2x1C 150 32 91.81 84.10 91.37 267.29 233.41

TOTAL CONNECTED LOAD PER PHASE 108.39 96.14 102.68 307.21 262.21

MAXIMUM DEMAND [3PH] @ D.F 0.85 = 262.21kW TOTAL CONNECTED LOAD [3 PH] 307.21 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 6


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-1801-BS
LOCATION : ELECTRICAL CUPBOARD
CONSULTANT: DEC/WSP
IN BETWEEN GRID 26 & 27
SMDB CONNECTED TO: SMDB-H3-1801
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
DB NO. MCCB kA SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 500 XLPE/LSF/SWA/LSF/CU 2x4C 300 2x1C 150 32 PMU WITH BMS CONNECTION

OUT GOING:

40 SET
DB-H3-1801-BS-01 TP 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 12 2.80 2.34 3.28 8.42 8.42
@32

40 SET
DB-H3-1801-BS-02 TP 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 78 1.06 0.74 0.85 2.65 2.65
@32

DB-H3-1901-BS-01 TP 80 35 XLPE/LSF/SWA/LSF/CU 4C 120 1C 70 93 10.77 6.75 11.71 29.24 26.58 AS PER SDIR 237

DB-H3-1801-BS-04 TP 125 35 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 12 14.72 19.13 17.67 51.52 46.21

DB-H3-1801-BS-05 TP 125 35 XLPE/LSF/SWA/LSF/CU 4C 240 1C 120 80 21.41 17.06 20.56 59.03 52.34

DB-H3-1701-BS-01 TP 32 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 45 3.62 2.85 2.27 8.74 8.38 AS PER SDIR 237

DB-H3-1801-BS-07 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 77 3.40 1.20 1.00 5.60 4.10 AS PER IFC M2M3-L22-Toilets-L21-L24-Hakkasan-MEP

ELEVATOR HSE-03 TP 32 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 90 1.53 1.53 1.53 4.60 3.82 300mA ELCB (RFI 13577) ( 63A TP ISOLATOR INSTALLED AT SITE )

SW POOL EQUIPMENT TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 10 45 6.67 6.67 6.67 20.00 16.60 ( 63ATP ISOLATOR INSTALLED AT SITE )

WF EQUIPMENT TP 25 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 45 3.33 3.33 3.33 10.00 8.30 ( 40A TP ISOLATOR INSTALLED AT SITE )

STEAM ROOM L18 TP 25 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 87 3.33 3.33 3.33 10.00 8.30 ( 63A TP ISOLATOR INSTALLED AT SITE )

STEAM ROOM L19 TP 25 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 85 3.33 3.33 3.33 10.00 8.30 ( 63A TP ISOLATOR INSTALLED AT SITE )

FREE STANDING ELECTRIC OVEN (ITEM 11) TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 70 7.00 7.00 7.00 21.00 17.43 30mA ELCB (SHUNT TRIP)

ELECTRIC DEEP FAT FRYER (ITEM 14) TP 25 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 70 2.50 2.50 2.50 7.50 6.23 30mA ELCB (SHUNT TRIP)

ELECTRIC COMBI STEAMER(ITEM BSP 15) TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 70 6.33 6.33 6.33 19.00 15.77 30mA ELCB (SHUNT TRIP)

TOTAL CONNECTED LOAD PER PHASE 91.81 84.10 91.37 267.29 233.41

MAXIMUM DEMAND [3PH] @ D.F 0.87 = 233.41kW TOTAL CONNECTED LOAD [3 PH] 267.29 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 7


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-1801-BS-01 JOB REF.:
LOCATION : 18TH FLOOR, CORE-3, BRIDGE SUITE ELECTRICAL INCOMING CABLE SIZE : 1X4C 10mm2 CU / XLPE/SWA/LSF+ 1X 1C 10 mm2, CU/G/Y/LSF ECC
MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H3-1801-BS
CUPBOARD
CONNECTED LOADS/POINTS LOAD PER CKT (W)
CKT

NEON LTG.
RATING ECC

LIGHTING

13A T.S/O
RATING MCB RTG WIRE DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O

5A S/O

W A/C

S A/C
OF SR. NO. CKT NO. WIRE ROOM / AREA UNIT WATTS REMARKS

MISC
CCU
SCH

FCU
D/W
OF ELCB IN Amp. SIZE FACTOR LOAD(KW)

SB
INCOMER SIZE mm² R Y B
mm²

1 R1 16 2.5 2.5 COURT, LOBBY 16 2.5 40 SS-X02 1.00 0.04

2 Y1 16 2.5 2.5 GUEST WC 2M 6 12 SS-C05 1.00 0.01

3 B1 16 2.5 2.5 GAMING THEATRE, GUEST WC 4.4M, 12.4M 6 101 SS-C03, SS-C05 1.00 0.10
40A,4P,
100mA SS-R06, SS-R04, SS-R05, SS-C05,
4 R2 16 2.5 2.5 COURT,GAMING THEATRE, BAR 19.3M, 8.6M, 9 10, 7.3, 6 252 1.00 0.25
SS-C02

5 Y2 16 2.5 2.5 GAMING THEATRE, BAR, COURT 13 10 130 DT, DL, DS, 1.00 0.13

6 B2 16 2.5 2.5 COURT, TERRACE 14 2, 10 76 SS-C16.1, DL 1.00 0.08

7 R3 16 2.5 2.5 MAJILIS 5 12 60 JUNCTION BOX 1.00 0.06

8 Y3 16 2.5 2.5 BAR 2 25 50 SS-P01 1.00 0.05

9 B3 16 2.5 2.5 BAR 7.2M 6 43 SS-C02, SS-C05 1.00 0.04


40A,4P,
100mA
10 R4 16 2.5 2.5 MAJLIS, OUTDOOR KITCHEN 8 7 56 SS-X06, 1.00 0.06

11 Y4 16 2.5 2.5 STUDY 4 10 40 DL, DS 1.00 0.04

12 B4 16 2.5 2.5 OUTDOOR KITCHEN , POND 16.7M 8 134 SS-X09 1.00 0.13

13 R5 16 2.5 2.5 GUEST WC 1.1 M 10.83 12 SS-C06 1.00 0.01

14 Y5 16 2.5 2.5 STUDY, POND , TERRACE 26.9 M, 26 6,7 343 SS-C05, SS-X04, SS-X05 1.00 0.34

15 B5 16 2.5 2.5 DINING 55.2 M 20 1104 SS-C01 1.00 1.10


40A,4P,
100mA
16 R6 16 2.5 2.5 OUTDOOR KITCHEN 12 3.8 46 SS-X08 1.00 0.05

17 Y6 16 2.5 2.5 STUDY 1 10 10 DS 1.00 0.01

18 B6 16 2.5 2.5 PLANTER 8 6 48 SS-X01 1.00 0.05

PLANTER(18TH FLOOR), CORRIDOR


19 R7 16 2.5 2.5 55.2 M, 1 20, 10 1114 SS-C01, DS 1.00 1.11
(19TH FLOOR)

LIVING (18 FLOOR), CORRIDOR (19TH


20 Y7 16 2.5 2.5 8 10 , 2.5 50 DT , SS-X02 1.00 0.05
FLOOR)

40A,4P, TERRACE(18TH FLOOR),


21 B7 16 2.5 2.5 9 12, 10, 7.3 87 JUNCTION BOX, SS-R05,SS-R04 1.00 0.09
100mA CORRIDOR(19TH FLOOR)

22 R8 16 2.5 2.5 POOL BAR 4 2.4 10 XW23 1.00 0.01

23 Y8 16 2.5 2.5 TERRACE 8.2 M 8 66 SS-X09 1.00 0.07

24 B8 16 2.5 2.5 MAJILIS, TERRACE, POND 10 7 70 SS-X05, SS-X04 1.00 0.07

25 R9 16 2.5 2.5 TERRACE 2 7 14 SS-X06 1.00 0.01

26 Y9 16 2.5 2.5 POND 27.8 M 8 222 SS-X09 1.00 0.22

2.5 2.5 20 50
40A,TP, ISOLATOR

27 B9 16 LIVING 2.5 SS-X02 1.00 0.05


40A,4P,
100mA LIVING, DINING, MAJILIS,OUTDOOR
28 R10 16 2.5 2.5 7 10 70 DL, DS, DT 1.00 0.07
KITCHEN, TERRACE

29 Y10 16 2.5 2.5 BAR 2.2 M 6 13 SS-C03 1.00 0.01

30 B10 16 2.5 2.5 DINING 28 3.8 106 SS-X08 1.00 0.11

BAR,GAMING THEATRE,STORE, GUES


31 R11 16 2.5 2.5 18 7.3, 10 169 SS-R04, SS-R05, SS-R06 1.00 0.17
WC

32 Y11 16 2.5 2.5 STAIR, GUEST WC, GAMING THEATRE 23 10, 2 54 SS-C16.1, SS-C16.2, DP 1.00 0.05

40A,4P,
33 B11 16 2.5 2.5 GUEST WC, GAMING THEATRE, LOBBY 14 7.3 102 SS-R04, SS-R08 1.00 0.10
100mA

34 R12 16 2.5 2.5 GAMING THEATRE, BAR 17.7 M 6 106 SS-C17 1.00 0.11

35 Y12 16 2.5 2.5 STUDY 2 7.3 15 SS-R14 1.00 0.01

36 B12 16 2.5 2.5 STAIR 27.12 M 6 163 SS-C02 1.00 0.16

37 R13 16 2.5 2.5 STORE (19TH FLOOR) 27.6 M 6 166 SS-C19.1, SS-C05.1 1.00 0.17

38 Y13 16 2.5 2.5 LIVING, LOBBY (19TH FLOOR) 50 17 850 SS-R19, SS-R17 1.00 0.85

39 B13 16 2.5 2.5 STUDY,LIVING, BAR, DINING (19TH FLOOR) 54 17, 33 950 SS-R17, SS-R18, SS-R19 1.00 0.95

40A,4P,
LOBBY, LIVING, DINING,SYUDY,BAR (19TH
100mA 40 R14 16 2.5 2.5 166, 6.8 M 2 , 3 ,17 472 SS-C16.1, SS-C16.2, SS-C08,SS-R17 1.00 0.47
FLOOR)

41 Y14 16 2.5 2.5 LIVING, DINING,SYUDY,BAR (19TH FLOOR) 67 6 402 SS-C17 1.00 0.40

42 B14 16 2.5 2.5 STAIR,LIVING, DINING,LOBBY,BAR (19TH FLOOR) 19 10 190 DP 1.00 0.19

43 R15 16 2.5 2.5 DINING (19TH FLOOR) 28 3 70 SS-R21 1.00 0.07

44 Y15 16 2.5 2.5 STORE (19TH FLOOR) 4 9 36 SS-R10 1.00 0.04

45 B15 16 2.5 2.5 ELECTRICAL CUP BOARD 1 58 58 B1 1.00 0.06


40A,4P,
100mA
46 R16 16 2.5 2.5 MAJILIS, OUTDOOR KITCHEN 23.5 M 6 141 SS-XL23 1.00 0.14

47 Y16 16 2.5 2.5 POOL 12 6, 2.4 50 XW25, XW24 1.00 0.05

48 B16 SPACE

49 R17 SPACE

50 Y17 SPACE

51 B17 SPACE
40A,4P,
100mA
52 R18 SPACE

53 Y18 SPACE

54 B18 SPACE

TOTAL LOAD PER PHASE 2798 2344 3282 1.00 8.42


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet
_ W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- TOTAL CONNECTED LOAD (TCL): 8.42 KW
Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 8.42
AMPS : 13.51 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 8


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-1801-BS-02 JOB REF.:
INCOMING CABLE SIZE : 1X4C 10mm2 CU / XLPE/SWA/LSF+ 1X 1C 10 mm2, CU/G/Y/LSF ECC
LOCATION : 18TH FLOOR, CORE-A, BRIDGE SUITE ELECTRICAL CUPBOARD MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H3-1801-BS
CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING OF MCB RTG IN CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O

5A S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU
SCH

FCU
INCOMER ELCB Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
SB
R Y B

1 R1 16 2.5 2.5 LIFT LOBBY, MASTER BATH ROOMS ,MASTER BED ROOM,SAFE 18,4M 10,6 204.00 DP, DT, DL,DS,SS-C05.1 1.00 0.20

2 Y1 16 2.5 2.5 SERVICE EXIT, HSE-03 4 10.00 40.00 DL, DS 1.00 0.04

3 B1 16 2.5 2.5 FAMILY ROOM, SAFE, DRESSING 66.2M,2 6.00 409.20 SS-C05.1, SS-C05, SS-C11, SS-R01 1.00 0.41
40A,4P, 100mA

4 R2 16 2.5 2.5 MASTE BATH ROOMS, STAIR 17.1 8.00 136.80 SS-C14, SS-C12 1.00 0.14

5 Y2 16 2.5 2.5 FAMILY ROOM,KITCHEN, MASTER BATH ROOMS 39.8,4 10.83, 2, 6 273.84 SS-C09, SS-C06, SS-C05, SS-R02 1.00 0.27

6 B2 16 2.5 2.5 MASTER BATH ROOM 3 2.00 6.00 SS-R03, SS-R02 1.00 0.01

7 R3 16 2.5 2.5 DRESSING 5.6 M 16.00 89.60 SS-C10 1.00 0.09

8 Y3 16 2.5 2.5 MASTER BATHROOM 2.8 M 5.52 15.46 SS-C15 1.00 0.02

9 B3 16 2.5 2.5 MASTER BATHROOM 10.6 M 5.30 56.18 SS-C13 1.00 0.06
40A,4P, 100mA
10 R4 16 2.5 2.5 STEAM 2 12.00 24.00 JUNCTION BOX 1.00 0.02

11 Y4 16 2.5 2.5 MASTER BED ROOM, MASTER BATH ROOM 4 1.00 4.00 SS-NL01 1.00 0.00
40A,TP, ISOLATOR

12 B4 16 2.5 2.5 STAIR 27.1 M 6,3 90.00 SS-C02, SS-C08 1.00 0.09

SS-R08, SS-R05, SS-R16, SS-R06,SS-


13 R5 16 2.5 2.5 STAFF WC, MASTER BATH ROOM, MASTER BED ROOM,LIFT LOBBY 20 10, 9, 7.3 193.60 1.00 0.19
R10

14 Y5 16 2.5 2.5 SERVICE EXIT, GUEST WC 12 9.00 108.00 SS-R10 1.00 0.11

15 B5 16 2.5 2.5 MASTER BATH ROOM, MASTER BED ROOM,DRESSING,SAFE 31 7.3, 10 234.40 SS-R04, SS-R05, SS-R08, SS-R013, SS-R015 1.00 0.23
40A,4P, 100mA
16 R6 16 2.5 2.5 FAMILY ROOM, STAFF WC, MASTER BATH ROOMS, MASTER BED ROOM 79 2.00 158.00 SS-C16.1, SS-C16.2, SS-C20 1.00 0.16

17 Y6 16 2.5 2.5 KITCHEN, MASTER BED ROOMS, MASTER BATH ROOMS,FAMILY ROOM 32.1 M 6.00 192.60 SS-C17 1.00 0.19

18 B6 16 2.5 2.5 STEAM, MASTER BATH ROOMS 3, 2 12, 10 56.00 JUNCTION BOX, DP 1.00 0.06

19 R7 16 2.5 2.5 KITCHEN, FAMILY ROOM, MASTER BATH ROOMS 34 7.3, 10 250.90 SS-R08, SS-R04, SS-R15, SS-R05 1.00 0.25

20 Y7 16 2.5 2.5 PLANT ROOM,ELE. CUPBOARD 2 52.00 104.00 b1 (RFI-11762) 1.00 0.10

21 B7 SPACE 1.00 0.00


40A,4P, 100mA
22 R8 SPACE 1.00 0.00

23 Y8 SPACE 1.00 0.00

24 B8 SPACE 1.00 0.00

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB- Sign Board _ D/W - Dish TOTAL LOAD PER PHASE 1057 738 852 1.00 2.65
Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 2.65 KW
TOTAL LOAD (KW) 2.65
AMPS : 4.24 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 9


PROJECT: THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-1901-BS-01 JOB REF.:
LOCATION : 19TH FLOOR, CORE-A,BRIDGE SUITE INCOMING CABLE SIZE : 1X4C 120mm2 CU / XLPE/SWA/LSF+ 1X 1C 70 mm2, CU/G/Y/LSF ECC
MAIN INCOMER : 80A,TP, ISOLATOR FED FROM : SMDB-H3-1801-BS
ELECTRICAL CUPBOARD
CONNECTED LOADS/POINTS LOAD PER CKT (W)
CKT

NEON LTG.
RATING MCB ECC

LIGHTING

13A T.S/O
RATING CKT WIRE UNIT DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O

W A/C

S A/C
SPUR
OF SR. NO. RTG IN WIRE ROOM / AREA REMARKS

MISC
CCU
SCH

FCU
D/W
OF ELCB NO. SIZE WATTS FACTOR LOAD(KW)

SB
INCOMER Amp. SIZE mm² R Y B
mm²

MASTER BATHROOM HIS, DRESSING, MASTER BATHROOM


1 R1 16 2.5 2.5 4, 5, 5, 10 140 DP, DT, DL 1.00 0.14
HERS, BALCONY, MASTER BEDROOM

BALCONY, SECOND BATHROOM, DRESSING, SECOND


2 Y1 16 2.5 2.5 6, 3, 2 10 110 DL, DS, DT 1.00 0.11
BEDROOM
40A,4P, 3 B1 16 2.5 2.5 STEAM, DRESSING 2, 73m, 13.8m, 2 12, 6, 557 SS_JBOX, SS_C05, SS_C11, SS_R01 1.00 0.56
100mA
4 R2 16 2.5 2.5 SECOND BATHROOM, STORE-02, 1.4m, 18m, 10.8m 6 180 SS_C15, SS_C17, SS_C05 1.00 0.18

SECOND BATHROOM, DRESSING, MASTER


5 Y2 16 2.5 2.5 6, 3.0m, 8 2, 16 76 SS_R03, SS_C10, SS_R02 1.00 0.08
BATHROOM HIS, MASTER BATHROOM HERS

6 B2 16 2.5 2.5 MASTER BATHROOM HIS 2.4m 8 19 SS_C14 1.00 0.02

SECOND BATHROOM, MASTER BATHROOM HIS, MASTER


7 R3 16 2.5 2.5 7.6m, 1.4m 10.8, 5.2 90 SS_C06, SS_C15 1.00 0.09
BATHROOM HERS

8 Y3 16 2.5 2.5 MASTER BATHROOM HIS, MASTER BATHROOM HERS 13m 8 104 SS_C12 1.00 0.10

9 B3 16 2.5 2.5 MASTER BATHROOM HERS 1.4m 6 8 SS_C15 1.00 0.01


40A,4P,
100mA 10 R4 16 2.5 2.5 BALCONY 8 7 56 SS_X06 1.00 0.06

SECOND BATHROOM, SECOND BEDROOM, MASTER


11 Y4 16 2.5 2.5 BEDROOM, MASTER BATHROOM HIS, MASTER 7 1 7 SS_NL01 1.00 0.01
BATHROOM HERS

12 B4 16 2.5 2.5 DRESSING 2.8m 16 45 SS_C10 1.00 0.04

13 R5 16 2.5 2.5 PLANT ROOM,ELE. CUPBOARD 2 52.00 104.00 b1 1.00 0.10

MASTER BATHROOM HIS, MASTER BATHROOM HERS,


DP, SS_R16, SS_R05, SS_R04, SS_R06,
14 Y5 16 2.5 2.5 MASTER BEDROOM, NEAR MASTER BEDROOM DRESSING, 2, 4, 11, 1, 3, 1 7.3,10 215 1.00 0.21
SS_R08
NEAR GRAND STAIR
DP, SS_R08, SS_R06, SS_R16, SS_R04,
15 B5 16 2.5 2.5 SECOND BATHROOM, DRESSING, SECOND BEDROOM 1, 1, 3, 2, 2, 4 10, 7.3 122 1.00 0.12
SS_R05
40A,4P, MASTER BEDROOM HIS, DRESSING, NEAR DRESSING,
100mA 16 R6 16 2.5 2.5 2, 16, 9, 2 10, 7.3 217 SS_R05, SS_R04, SS_R08, SS_R15 1.00 0.22
MASTER BATHROOM HIS, MASTER BEDROOM

17 Y6 16 2.5 2.5 HSE-03 10 2 20 SS_C16.2 1.00 0.02

SECOND BATHROOM, SECOND BEDROOM, MASTER


18 B6 16 2.5 2.5 BEDROOM, MASTER BATHROOM HERS, NEAR DRESSING, 3, 39, 46, 2 176 SS_C20, SS_C16.2, SS_C16.1 1.00 0.18
MASHER BATHROOM HIS, SECOND BATHROOM

19 R7 16 2.5 2.5 STORE-02, SERVICE EXIT, NEAR PLANT 8 9 72 SS_R10 1.00 0.07

SECOND BEDROOM, NEAR SECOND BEDROOM, SECOND SS_C16.1, SS_C16.2, SS_R08, SS_R15,
20 Y7 16 2.5 2.5 12, 6, 14, 2, 9, 1 2, 7.3 226 1.00 0.23
BATHROOM, DRESSING, MASTER BATHROOM HERS SS_R04, SS_R13

40A,4P, 21 B7 16 2.5 2.5 STEAM 3 12 36 SS_JBOX 1.00 0.04


100mA
22 R8 16 2.5 2.5 NEAR DRESSING 1, 2 7 22 SS_R08, SS_R04 1.00 0.02

23 Y8 20 4 4 FOR LCP-H3-1901-BS-01 1 200 200 0.90 0.18

24 B8 16 2.5 2.5 SECOND BEDROOM 2, 3.7m 10 57 DL, SS_C21 1.00 0.06

25 R9 20 4 4 OUTDOOR 1 200 200 0.90 0.18

26 Y9 20 4 4 BEDROOM 3 200 600 0.90 0.54

27 B9 20 4 4 BEDROOM 2 400 800 0.90 0.72


40A,4P,
30mA
28 R10 20 4 4 BEDROOM 4 200 800 TRA-LTR-TCI-DEC-0815 0.90 0.72

29 Y10 20 4 4 BEDROOM 4 200 800 TRA-LTR-TCI-DEC-0815 0.90 0.72

30 B10 20 4 4 BEDROOM 1 2 200, 400 1000 0.90 0.90


80A,TP, ISOLATOR

31 R11 20 4 4 BEDROOM 2 200 400 0.90 0.36

32 Y11 20 4 4 WC 1 100 100 0.90 0.09

33 B11 20 4 4 BATH ROOM 6 100 600 0.90 0.54


40A,4P,
30mA
34 R12 20 4 4 SHAVER OUTLET 1 200 200 0.90 0.18

35 Y12 20 4 4 DRESSING 1 200 200 0.90 0.18

36 B12 20 4 4 SIRVICE EXIT 5 200 1000 0.90 0.90

37 R13 20 4 4 SAFE 2 200 400 0.90 0.36

38 Y13 20 4 4 NEAR SAFE 1 1 200, 400 600 0.90 0.54

39 B13 20 4 4 LIFT LOBBY 2 200 400 0.90 0.36


40A,4P,
30mA
40 R14 20 4 4 MASTER BEDROOM 2 200 400 0.90 0.36

41 Y14 20 4 4 MASTER BEDROOM 2 400 800 0.90 0.72

42 B14 20 4 4 MASTER BEDROOM 4 200 800 TRA-LTR-TCI-DEC-0815 0.90 0.72

43 R15 20 4 4 MASTER BEDROOM 4 200 800 TRA-LTR-TCI-DEC-0815 0.90 0.72

44 Y15 20 4 4 MASTER BEDROOM 3 200 600 0.90 0.54

45 B15 20 4 4 MASTER BEDROOM 2 400 800 0.90 0.72


40A,4P,
30mA
46 R16 20 4 4 DRESSING 2 200 400 0.90 0.36

47 Y16 20 4 4 FEMALE BATHROOM 1 200 200 0.90 0.18

48 B16 20 4 4 SHAVER OUTLET 1 200 200 0.90 0.18

49 R17 20 4 4 WC 2 100 200 0.90 0.18

50 Y17 20 4 4 MALE BATHROOM 1 200 200 0.90 0.18

51 B17 20 4 4 SHAVER OUTLET 1 200 200 0.90 0.18


40A,4P,
30mA
52 R18 20 4 4 DRESSING 2 200 400 0.90 0.36

53 Y18 20 4 4 DRESSING 2 200 400 0.90 0.36

54 B18 20 4 4 WC 4 100 400 0.90 0.36

FCU-BS-30 (REVISED AS PER


55 R19 20 4 4 BATH ROOM 1 713 713 0.90 0.64
TRA-SPE-TEC-AC-GEN-00095)
40A,4P, FCU-BS-29 (REVISED AS PER
56 Y19 20 4 4 SERVICE EXIT 1 157 157 0.90 0.14
100mA TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-32 (REVISED AS PER
57 B19 20 4 4 DRESSING 1 989 989 0.90 0.89
TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-28 (REVISED AS PER
58 R20 20 4 4 LIFT LOBBY 1 213 213 0.90 0.19
TRA-SPE-TEC-AC-GEN-00095)
40A,4P, FCU-BS-34 (REVISED AS PER
59 Y20 20 4 4 MALE BATHROOM 1 123 123 0.90 0.11
100mA TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-35 (REVISED AS PER
60 B20 20 4 4 FEMALE BATHROOM 1 253 253 0.90 0.23
TRA-SPE-TEC-AC-GEN-00095)

61 R21 32 2x4 2x4 MOTORISED CURTAIN 8 325 2600 0.90 2.34

62 Y21 20 4 4 FEMALE BATHROOM 5 100 500 0.90 0.45

63 B21 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 0.90 1.46


40A,4P,
30mA
64 R22 32 2x4 2x4 MOTORISED CURTAIN 6 325 1950 0.90 1.76

65 Y22 20 4 4 HIS & HER BATHROOM 2 180 360 RAIN SHOWER (RFI 17562) 0.90 0.32

66 B22 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 0.90 1.46

FCU-BS-31 (REVISED AS PER


64 R23 20 4 4 BATH ROOM 1 213 213 0.90 0.19
TRA-SPE-TEC-AC-GEN-00095)
40A,4P, FCU-BS-33 (REVISED AS PER
65 Y23 20 4 4 DRESSING 1 157 157 0.90 0.14
100mA TRA-SPE-TEC-AC-GEN-00095)

66 B23 0

TOTAL LOAD PER PHASE 10770 6754 11711 0.91 26.58


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _
W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- TOTAL CONNECTED LOAD (TCL): 29.24 KW
Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 29.24
AMPS : 46.89 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 10


PROJECT: THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-1801-BS-04 JOB REF.:
LOCATION : 18TH FLOOR, CORE-3, BRIDGE SUITE ELECTRICAL INCOMING CABLE SIZE : 1X4C 50mm2 CU / XLPE/SWA/LSF+ 1X 1C 25 mm2, CU/G/Y/LSF ECC
MAIN INCOMER : 125A,TP, ISOLATOR FED FROM : SMDB-H3-1801-BS
CUPBOARD
CONNECTED LOADS/POINTS LOAD PER CKT (W)
CKT

NEON LTG.
RATING RATING MCB

ISOLATOR
LIGHTING

13A T.S/O
WIRE ECC WIRE UNIT DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O

OULET

W A/C

S A/C
SPUR
OF OF SR. NO. CKT NO. RTG IN ROOM / AREA REMARKS

MISC
CCU
SCH

FCU
D/W
SIZE SIZE mm² WATTS R Y B FACTOR LOAD(KW)
INCOMER ELCB Amp.
mm²

1 R1 20 4 4 BAR 1 200 200 FOR REFRIGERATION UNIT 0.90 0.18

40A,4P,
2 Y1 20 4 4 BAR 2 400 800 0.90 0.72
30mA

3 B1 20 SPARE 200 0.90 0.18

4 R2 300 0.90 0.27

40A,4P,
5 Y2 20A TP SPARE 1 900 300 0.90 0.27
30mA

6 B2 300 0.90 0.27

7 R3 20 4 4 BAR 1 200 200 FOR WINE REFRIGERATION 0.90 0.18

8 Y3 20 4 4 GAMING THEATRE 1 2 400 1000 (TRA-LTR-TCI-DEC-0815) 0.90 0.90

9 B3 20 4 4 GAMING THEATRE 2 400 800 0.90 0.72


40A,4P,
30mA
10 R4 20 4 4 GAMING THEATRE 2 200 400 0.90 0.36

11 Y4 20 4 4 GAMING THEATRE 2 400 800 0.90 0.72

12 B4 20 4 4 GAMING THEATRE 2 400 800 0.90 0.72

13 R5 20 4 4 GAMING THEATRE 2 200 400 0.90 0.36

14 Y5 20 4 4 BAR 2 200 400 0.90 0.36

15 B5 20 4 4 BAR 2 400 800 0.90 0.72


40A,4P,
30mA
16 R6 20 4 4 GAMING THEATRE 2 200 400 0.90 0.36

17 Y6 20 4 4 STORE 2 200 400 0.90 0.36

18 B6 20 4 4 WC-02 1 100 100 0.90 0.09

19 R7 20 4 4 STUDY 2 200 400 0.90 0.36

20 Y7 20 4 4 STUDY 2 400 800 0.90 0.72

21 B7 20 4 4 STUDY 2 200 400 0.90 0.36


40A,4P,
30mA
22 R8 20 4 4 STUDY 2 200 400 0.90 0.36

23 Y8 20 4 4 LIVING ROOM 2 200 400 0.90 0.36

24 B8 20 4 4 LIVING ROOM 3 200 600 0.90 0.54

25 R9 20 4 4 LIVING ROOM 2 400 800 0.90 0.72

26 Y9 20 4 4 LIVING ROOM 1 2000 2000 0.90 1.80

27 B9 20 4 4 DINING 3 200 600 0.90 0.54


40A,4P,
30mA
28 R10 20 4 4 DINING 2 200 400 0.90 0.36

29 Y10 20 4 4 DINING 2 400 800 0.90 0.72

30 B10 20 4 4 NEAR DINING 1 200 200 0.90 0.18

31 R11 20 4 4 FORECOURT 2 200 400 0.90 0.36

32 Y11 20 4 4 LCP-H3-1801-BS-01 1 200 200 0.90 0.18

33 B11 20 4 4 GUEST WC 1 100 100 0.90 0.09


40A,4P,
30mA
34 R12 SPACE 0.90 0.00

35 Y12 20 4 4 STORE 2 200 400 0.90 0.36


125A,TP, ISOLATOR

36 B12 20 4 4 GAMING THEATRE 1 2000 2000 0.90 1.80

37 R13 SPACE 0 0.90 0.00

38 Y13 20 4 4 DINING 1 200 200 0.90 0.18

39 B13 32 2x4 2x4 MOTORISED CURTAIN 8 325 2600 RING 0.90 2.34
40A,4P,
30mA
40 R14 32 2x4 2x4 MOTORISED CURTAIN 4 325 1300 RING 0.90 2.63

41 Y14 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 RING 1.90 0.00

42 B14 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 RING 0.90 1.46

FCU-BS-02 (REVISED AS PER


43 R15 20 4 4 GAMING THEATRE 1 713 713 0.90 0.64
TRA-SPE-TEC-AC-GEN-00095)

40A,4P, FCU-BS-26, FCU-BS-27


100mA 44 Y15 20 4 4 DINING 2 213 426 (REVISED AS PER TRA-SPE-TEC- 0.90 0.38
AC-GEN-00095)
FCU-BS-14, (REVISED AS PER
45 B15 20 4 4 BAR 1 989 989 0.90 0.89
TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-16 (REVISED AS PER
46 R16 20 4 4 NEAR BAR 1 713 713 0.90 0.64
TRA-SPE-TEC-AC-GEN-00095)
40A,4P, FCU-BS-17 (REVISED AS PER
47 Y16 20 4 4 STUDY 1 713 713 0.90 0.64
100mA TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-19 (REVISED AS PER
48 B16 20 4 4 LOBBY 1 713 713 0.90 0.64
TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-20 (REVISED AS PER
49 R17 20 4 4 FORECOURT 1 713 713 0.90 0.64
TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-23, FCU-BS-24
40A,4P,
50 Y17 20 4 4 LIVING ROOM 2 213 426 (REVISED AS PER TRA-SPE-TEC- 0.90 0.38
100mA
AC-GEN-00095)
FCU-BS-22 (REVISED AS PER
51 B17 20 4 4 LIVING ROOM 1 713 713 0.90 0.64
TRA-SPE-TEC-AC-GEN-00095)

52 R18 32 2x4 2x4 MOTORISED CURTAIN 8 325 2600 RING 0.90 2.34

40A,4P,
53 Y18 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 RING 0.90 1.46
30mA

54 B18 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 RING 0.90 1.46

55 R19 32 2x4 2x4 MOTORISED CURTAIN 8 325 2600 RING 0.90 2.34

40A,4P,
56 Y19 32 2x4 2x4 MOTORISED CURTAIN 8 2600 0.90 2.34
30mA

57 B19 32 SPARE 1300 RING 0.90 1.17

58 R20 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 RING 0.90 1.46

40A,4P,
59 Y20 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 RING 0.90 1.46
30mA

60 B20 SPACE 0.90 0.00

FCU-BS-38 (REVISED AS PER


61 R21 20 4 4 GAMING THEATRE 1 157 157 0.90 0.14
TRA-SPE-TEC-AC-GEN-00095)

62 Y21 20 SPARE 200 0.90 0.18

FCU-BS-15 (REVISED AS PER


63 B21 20 4 4 BAR 1 989 989 0.90 0.89
40A,4P, TRA-SPE-TEC-AC-GEN-00095)
100mA FCU-BS-21 (REVISED AS PER
64 R22 20 4 4 FORECOURT 0.90 0.00
TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-18 (REVISED AS PER
65 Y22 20 4 4 STUDY 1 989 989 0.90 0.89
TRA-SPE-TEC-AC-GEN-00095)
FCU-BS-25 (REVISED AS PER
66 B22 20 4 4 LIVING ROOM 1 213 213 0.90 0.19
TRA-SPE-TEC-AC-GEN-00095 )

67 R23

FOR CRESTRON CHARGING


68 Y23 20 4 4 LIVING ROOM 2 200 400 0.50 0.20
TRA-LTR-TCI-DEC-0815

69 B23
40A,4P,
100mA
70 R24

71 Y24

72 B24

TOTAL LOAD PER PHASE 14721 19129 17667 0.90 46.21


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet
_ W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- TOTAL CONNECTED LOAD (TCL): 51.52 KW
Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 51.52
AMPS : 82.62 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 11


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-1801-BS-05 JOB REF.:
LOCATION : 18TH FLOOR, CORE-A, BRIDGE SUITE ELECTRICAL INCOMING CABLE SIZE : 1X4C 240mm2 CU / XLPE/SWA/LSF+ 1X 1C 120 mm2, CU/G/Y/LSF ECC
MAIN INCOMER : 125A,TP, ISOLATOR FED FROM : SMDB-H3-1801-BS
CUPBOARD
CONNECTED LOADS/POINTS LOAD PER CKT (W)

COMMANO

COMMANO
NEON LTG.
RATING ECC

ISOLATOR
LIGHTING

13A T.S/O
RATING MCB RTG CKT WIRE UNIT DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O

1P S/O

3P S/O

W A/C

S A/C
SPUR
OF SR. NO. CKT NO. WIRE ROOM / AREA REMARKS

MISC
SCH

FCU
OF ELCB IN Amp. SIZE mm² WATTS R Y B FACTOR LOAD(KW)
INCOMER SIZE mm²

1 R1 20 4 4 FAMILY ROOM 5 200 1000 TRA-LTR-TCI-DEC-0815 0.90 0.90

2 Y1 20 4 4 FAMILY ROOM 2 400 800 0.90 0.72

3 B1 20 4 4 CORRIDOR 5 200 1000 0.90 0.90


40A,4P,
30mA
4 R2 20 4 4 LOBBY 3 200 600 0.90 0.54

5 Y2 20 4 4 WC-01 1 100 100 0.90 0.09

6 B2 20 4 4 DRESSING 2 200 400 0.90 0.36

7 R3 20 4 4 DRESSING 1 1 200 ,400 600 0.90 0.54

8 Y3 20 4 4 DRESSING 2 200 400 0.90 0.36

9 B3 20 4 4 SAFE 3 200 600 0.90 0.54


40A,4P,
30mA
10 R4 20 4 4 WC 2 100 200 0.90 0.18

11 Y4 20 4 4 MALE BATHROOM 1 200 200 0.90 0.18

12 B4 20 4 4 SHAVER OUTLET 1 200 200 0.90 0.18

13 R5 20 4 4 DRESSING 2 200 400 0.90 0.36

14 Y5 20 4 4 FEMALE BATHROOM 1 200 200 0.90 0.18

15 B5 20 4 4 SHAVER OUTLET 1 200 200 0.90 0.18


40A,4P,
30mA
16 R6 20 4 4 MASTER BEDROOM 3 200 600 0.90 0.54

17 Y6 20 4 4 MASTER BEDROOM 2 400 800 0.90 0.72

18 B6 20 4 4 MASTER BEDROOM 4 200 800 TRA-LTR-TCI-DEC-0815 0.90 0.72

19 R7 20 4 4 MASTER BEDROOM 4 200 800 TRA-LTR-TCI-DEC-0815 0.90 0.72

40A,4P,
20 Y7 20 4 4 MASTER BEDROOM 1 2 200 ,400 1000 0.90 0.90
30mA

21 B7 20 4 4 KITCHEN 1 200 200 VENTLESS HOOD (ITEM-23) 0.90 0.18

22 R8 1867 0.90 1.68


700 SERIES FREE STANDING
40A,4P,
23 Y8 20A TP 4 4 KITCHEN 1 5600 1867 ELECTRIC GRIDDLE (ITEM- 0.90 1.68
30mA
20)(WITH SHUNT TRIP)
24 B8 1867 0.90 1.68

FULLY AUTOMATIC ESPRESSO


25 R9 20 4 4 KITCHEN 1 1600 1600 0.90 1.44
MACHINE (ITEM-13)
40A,4P, HOT WATER BOILER (ITEM 17)
26 Y9 20 4 4 KITCHEN 1 1900 1900 0.90 1.71
30mA (WITH SHUNT TRIP)

27 B9 63 25 16 KITCHEN 1 7400 7400 FOR INDUCTION HOB 0.90 6.66

28 R10 25 6 6 KITCHEN 1 2300 2300 FOR EXTRACTOR 0.90 2.07

40A,4P,
29 Y10 32 6 6 KITCHEN 1 3100 3100 0.90 2.79
30mA

30 B10 20 4 4 KITCHEN 1 500 500 KITCHEN HOOD (ITEM-12) 0.90 0.45

31 R11 20 4 4 KITCHEN 1 810 810 WARMING DRAWER (ITEM -10) 0.90 0.73
125A,TP, ISOLATOR

32 Y11 20 4 4 HIS BATHROOM 3 100 300 0.90 0.27

33 B11 20 4 4 WC 2 100 200 0.90 0.18


40A,4P,
30mA
34 R12 20 4 4 HERS BATHROOM 3 100 300 0.90 0.27

35 Y12 20 4 4 FOR LCP 1 100 100 0.90 0.09

36 B12 20 4 4 KITCHEN 1 500 500 KITCHEN HOOD (ITEM-12) 0.90 0.45

37 R13 32 6 6 KITCHEN 1 1600 1600 FOR COFFEE MACHINE 0.90 1.44

40A,4P,
38 Y13 25 6 6 KITCHEN 1 2400 2400 0.90 2.16
30mA

39 B13 20 4 4 KITCHEN 1 1300 1300 0.90 1.17

40 R14 20 4 4 KITCHEN 1 120 120 FOR FRIDGE (RFI 17562) 0.90 0.11

41 Y14 20 4 4 KITCHEN 3 1 200 1000 (RFI 17562) 0.90 0.90

42 B14 20 4 4 WC 1 100 100 (RFI 17562) 0.90 0.09


40A,4P,
30mA
43 R15 20 4 4 KITCHEN 1 1300 1300 FOR FREEZER (RFI 17562) 0.90 1.17

44 Y15 20 4 4 KITCHEN 1 120 120 RFI 17562) 0.90 0.11

GLUE FLY KILLER (ITEM 6) (RFI


45 B15 20 4 4 KITCHEN 1 100 100 0.90 0.09
17562)

46 R16 1500 0.90 1.35

40A,4P,
47 Y16 20A TP 4 4 KITCHEN 1 4500 1500 BSP-11 0.90 1.35
30mA

48 B16 1500 0.90 1.35

FCU-BS-10 (REVISED AS PER TRA-


49 R17 20 4 4 KITCHEN 1 213 213 0.90 0.19
SPE-TEC-AC-GEN-00095)
FCU-BS-07A, FCU-BS-08 (REVISED
40A,4P,
50 Y17 20 4 4 CORRIDOR 2 106, 157 263 AS PER TRA-SPE-TEC-AC-GEN- 0.90 0.24
100mA
00095)
FCU-BS-11 (REVISED AS PER TRA-
51 B17 20 4 4 MALE BATHROOM 1 123 123 0.90 0.11
SPE-TEC-AC-GEN-00095)
FCU-BS-09, (REVISED AS PER TRA-
52 R18 20 4 4 DRESSING 1 989 989 0.90 0.89
SPE-TEC-AC-GEN-00095)
40A,4P, FCU-BS-05 (REVISED AS PER TRA-
53 Y18 20 4 4 DRESSING 1 157 157 0.90 0.14
100mA SPE-TEC-AC-GEN-00095)
FCU-BS-06 (REVISED AS PER TRA-
54 B18 20 4 4 FEMALE BATHROOM 1 157 157 0.90 0.14
SPE-TEC-AC-GEN-00095)

55 R19 32 2x4 2x4 MOTORISED CURTAIN 6 325 1950 RING 0.90 1.76

56 Y19 32 2x4 2x4 MOTORISED CURTAIN 2 325 650 RING 0.90 0.59

57 B19 32 2x4 2x4 MOTORISED CURTAIN 5 325 1625 RING 0.90 1.46
40A,4P,
30mA
58 R20 32 2x4 2x4 MOTORISED CURTAIN 6 325 1950 RING 0.90 1.76

59 Y20 20 4 4 BRIDGE SUITE PANTRY 1 200 200 CONTROL PANEL 0.90 0.18

60 B20 20 4 4 MOTORISED CURTAIN 5 325 1625 0.90 1.46

FCU-BS-04 (REVISED AS PER TRA-


61 R21 20 4 4 DRESSING 1 713 713 0.90 0.64
SPE-TEC-AC-GEN-00095)
40A,4P,
62 Y21 0.90 0.00
100mA
FCU-BS-07B (REVISED AS PER
63 B21 20 4 4 KITCHEN 1 160 160 0.90 0.14
TRA-SPE-TEC-AC-GEN-00095)

61 R22 0.90 0.00

40A,4P,
62 Y22 20 4 4 HIS & HER BATHROOM 1 180 180 RAIN SHOWER (RFI 17562) 0.90 0.16
30mA

63 B22 20 4 4 HIS & HER BATHROOM 1 180 180 RAIN SHOWER (RFI 17562) 0.90 0.16

TOTAL LOAD PER PHASE 21412 17057 20557 0.89 52.34


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet
_ W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- TOTAL CONNECTED LOAD (TCL): 59.03 KW
Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 59.03
AMPS : 94.66 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 12


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-1801-BS-07 JOB REF.:
INCOMING CABLE SIZE : 1X4C 50mm2 CU / XLPE/SWA/LSF+ 1X1C 25mm2, CU/G/Y/LSF ECC
LOCATION : BRIDGE SUITE ELECTRICAL ROOM LEVEL 18TH MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H3-1801-BS

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD

SB
R Y B

1 R1 32 6 6 OUTDOOR KITCHEN 1 3000 3000 FOR BARBECUE GRILL 0.50 1.50

40A, 4P,
2 Y1 20 4 4 OUTDOOR KITCHEN 1 200 200 FOR REFRIGERATION UNIT 1.00 0.20
30mA

FOR LEAK DETCTION CONTROL


3 B1 20 4 4 ELECTRIC CUPBOARD 1 200 200 1.00 0.20
PANEL

4 R2 SPACE 0 1.00 0.00

40A, 4P, 5 Y2 20 SPARE 200 1.00 0.20


100mA

6 B2 20 SPARE 200 1.00 0.20

7 R3 SPACE 0 1.00 0.00

40A, 4P,
8 Y3 20 SPARE 200 1.00 0.20
100mA
40A,TP, ISOLATOR

AS PER IFC

9 B3 20 SPARE 200 1.00 0.20

10 R4 SPACE 0 1.00 0.00

40A, 4P,
11 Y4 20 SPARE 200 1.00 0.20
100mA

12 B4 20 SPARE 200 1.00 0.20

13 R5 20 SPARE 200 1.00 0.20

14 Y5 20 4 4 OUTDOOR KITCHEN 200 200 EI-1079 1.00 0.20

15 B5 20 SPARE 200 1.00 0.20


40A, 4P,
30mA
16 R6 20 SPARE 200 1.00 0.20

AS PER IFC

17 Y6 20 SPARE 200 1.00 0.20

18 B6 1.00 0.00

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
TOTAL LOAD PER PHASE 3400 1200 1000 0.73 4.10
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 5.60 KW
TOTAL LOAD (KW) 5.60
AMPS : 8.98 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 13


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-1701-BS-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 10mm2 CU / XLPE/SWA/LSF+ 1X 1C 10 mm2, CU/G/Y/LSF ECC
LOCATION : 17TH FLOOR, CORE-3,BRIDGE SUITE POOL PLANT ROOM MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H3-1801-BS

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.

ISOLATOR
LIGHTING

13A T.S/O
RATING OF RATING OF MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU
SCH

FCU
INCOMER ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
SB
R Y B

1 R1 16 2.5 2.5 LIGHTING 7 58 406.00 1.00 0.41

2 Y1 16 2.5 2.5 LIGHTING 4 58.00 232.00 1.00 0.23

3 B1 16 2.5 2.5 LIGHTING 7 52 364.00 1.00 0.36


40A,4P,
100mA
4 R2 16 2.5 2.5 LIGHTING 7 58 406.00 1.00 0.41

5 Y2 16 2.5 2.5 LIGHTING 7 58.00 406.00 1.00 0.41

6 B2 SPACE 0.00 1.00 0.00

7 R3 20 4 4 BRIDGE SUITE PLANT ROOM 3 200.00 600.00 1.00 0.60

8 Y3 SPACE 0.00 1.00 0.00

9 B3 SPACE 0.00 1.00 0.00


40A,4P,
30mA
10 R4 20 SPARE 200.00 1.00 0.20

11 Y4 20 SPARE 200.00 1.00 0.20

12 B4 20 SPARE 200.00 1.00 0.20


40A,TP, ISOLATOR

13 R5 250.00 1.00 0.25

40A,4P, LOAD AS PER APPROVED TRA-SPE-TEC-AC-


14 Y5 20A TP 4 4 EF-BS-01 1 750 250.00 1.00 0.25
100mA GEN-00214

15 B5 250.00 1.00 0.25

16 R6 250.00 1.00 0.25

40A,4P, LOAD AS PER APPROVED TRA-SPE-TEC-AC-


17 Y6 20A TP 4 4 EF-BS-02 1 750 250.00 1.00 0.25
100mA GEN-00214

18 B6 250.00 1.00 0.25

FCU-BS-37 (REVISED AS PER TRA-SPE-TEC-


19 R7 20 4 4 POOL PLANT ROOM 1 74 300 1.00 0.30
AC-GEN-00095)

40A,4P, FCU-BS-36 (REVISED AS PER TRA-SPE-TEC-


20 Y7 20 4 4 POOL PLANT ROOM 1 253 300.00 1.00 0.30
100mA AC-GEN-00095)

21 B7 SPACE 1.00 0.00

22 R8 250.00 0.90 0.23

MAU-BS-01 (TEC 00791) ELCB PROVIDED IN


23 Y8 20A TP 4 4 MECHANICAL PLENUM (MAU-BS-01 ) 1 750.00 250.00 0.90 0.23
CONTROL PANEL

24 B8 250.00 0.90 0.23

25 R9 959.00 0.90 0.86

40A,4P,
26 Y9 20A TP 4 4 MECHANICAL PLENUM 1 2877.00 959.00 KEU-BS-01 (TEC 00791)(RFI15587) 0.90 0.86
300mA

27 B9 959.00 0.90 0.86

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB- TOTAL LOAD PER PHASE 3621 2847 2273 0.96 8.38
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 8.74 KW
TOTAL LOAD (KW) 8.74
AMPS : 14.02 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 14


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-1801-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (18306) LEVEL 18TH CORE 3 MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H3-1801

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD
R Y B

1 R1 16 2.5 2.5 BALCONY LIGHT L18 8 36.7 147 XL22 1.00 0.15
STOR.-18304,VEST.-18305,ICE STOR.-18309,
PLUMBING-18308,ELECT RM-18306,IT ROOM-
2 Y1 16 2.5 2.5 5,2,3 31, 26, 32 274 LIGHT TYPE-B-FL5, B-D3a,B-D2a 1.00 0.27
18303,STR VEST-18310,SERVICE LOBBY-18302
ELEVATOR LOBBY-16300,IT RM-16303
40A, 4P, 3 B1 SPACE
100mA
FCU-H-18-EL-3B / CONDENSATE PUMP
4 R2 20 4 4 ELEVATOR LOBBY-18300 1 1 253, 100 353 (REVISED AS PER TRA-SPE-TEC-AC-GEN- 0.90 0.32
00219-00) & (SDIR-0007)
5 Y2 SPACE

6 B2 SPACE
FCU-H-18-EL-3A / CONDENSATE PUMP
7 R3 20 4 4 ELEVATOR LOBBY-18300 1 1 713, 100 813 (REVISED AS PER TRA-SPE-TEC-AC-GEN- 0.90 0.73
40A, 4P, 00219-00) & (SDIR-0007)
100mA 8 Y3 SPACE

9 B3 SPACE
ELEVATOR LOBBY-18300,
10 R4 20 4 4 2 100 200 CAV-H-18-3,CAV-H-18-2 0.90 0.18
SERVICE LOBBY-18302
40A, 4P,
40A,TP, ISOLATOR

100mA 11 Y4 20 4 4 L18 COURT 1 123 123 FCU-BS-01 0.90 0.11

12 B4 20 SPARE 300 300 0.50 0.15


CORRIDOR-18301,STAIR VEST-18310,
13 R5 32 2X4 2X4 ICE STOR.-18309,PLUMBING-18308, 7 200 1400 RING 0.50 0.70
ELECTRICAL ROOM-18306
ELEVATOR LOBBY-18300,CORRIDOR-
14 Y5 32 2X4 2X4 7 1 200, 100 1500 RING 0.50 0.75
18301,SERVICE LOBBY-18302,STOR-18304
40A, 4P,
15 B5 20 SPARE 200 0.50 0.10
30mA
16 R6 20 SPARE 200 0.50 0.10

17 Y6 20 4 4 ICE MAKER-18309 1 500 500 0.90 0.45

18 B6 20 4 4 L18 COURT 1 200 200 0.50 0.10

19 R7 SPACE

20 Y7 SPACE

40A, 4P, 21 B7 16 SPARE 1000 1000 1.00 1.00


100mA
22 R8 16 2.5 2.5 18TH FLOOR LIGHTING CR10-73,91 55 6 330 LIGHT TYPE-C04,C04.1 1.00 0.33

23 Y8 16 2.5 2.5 18TH FLOOR LIGHTING CR10-71,81,82 6,6,6 9.5,14,10 201 LIGHT TYPE-R05,R06,R08,DS,DL 1.00 0.20

24 B8 16 2.5 2.5 18TH FLOOR LIGHTING CR10-72,92,93,94 7,6,3,2 9.5,2.5,14,20 164 LIGHT TYPE-R06.1,R09,R06,DP 1.00 0.16

25 R9 1833 0.80 1.47


40A, 4P,
26 Y9 20A TP 4 4 LEVEL 18 CORE 3 1 5500 1833 AV-C3-L18-01 0.80 1.47
30mA
27 B9 1833 0.80 1.47
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ TOTAL LOAD PER PHASE 5276 4431 3697 0.76 10.21
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 13.40 KW
TOTAL LOAD (KW) 13.40
AMPS : 21.50 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 15


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-1901
LOCATION : ELECTRICAL ROOM (19306)
CONSULTANT: DEC/WSP
LEVEL 19TH CORE 3
SMDB CONNECTED TO: BB-H3-02
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 125 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8

OUT GOING:

DB-H3-1901-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 29 3.69 3.69 2.60 A2.1-H1927

DB-H3-1901-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 35 3.92 3.92 2.73 A19.1-H1928

DB-H3-1901-RM03 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 35 3.69 3.69 2.60 A30.1-H1929

DB-H3-1901-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 30 3.92 3.92 2.73 A31.1-H1930

DB-H3-1901-RM05 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 21 3.69 3.69 2.60 A22.1-H1931

DB-H3-1901-RM06 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 28 3.69 3.69 2.60 A23.1-H1932

DB-H3-1901-01 TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 5.18 3.93 3.09 12.20 9.92 ELECTR RM-19306

DB-H3-1901-RM07 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 36 3.92 3.92 2.73 A24.1-H1933

DB-H3-1901-RM08 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 36 3.92 3.92 2.73 BEDROOM-19B

TOTAL CONNECTED LOAD PER PHASE 12.79 15.46 14.39 42.64 31.24

MAXIMUM DEMAND [3PH] @ D.F 0.73 = 31.24kW TOTAL CONNECTED LOAD [3 PH] 42.64 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 16


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-1901-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (19306) LEVEL 19TH CORE 3 MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H3-1901

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD
R Y B

1 R1 16 2.5 2.5 STAIR CASE-S03-CORE 3 24 14.00 336 LIGHT TYPE-B-W1 1.00 0.34
STOR.-19304,VEST.-19305,ICE STOR.-19309,
PLUMBING-19308,ELECT RM-19306,IT ROOM-
2 Y1 16 2.5 2.5 5,2,3 31, 26, 32 274 LIGHT TYPE-B-FL5, B-D3a,B-D2a 1.00 0.27
19303,STR VEST-19310,SERVICE LOBBY-19302
ELEVATOR LOBBY-19300,IT RM-16303
40A, 4P,
100mA 3 B1 16 2.5 2.5 L19 BALCONY LIGHTING 4 36.7 147 XL22 (8Nos.) 1.00 0.15

4 R2 16 2.5 2.5 L-18-20 FAÇADE LIGHTING 8.4 20 168 XP22 (28Nos.) 1.00 0.17

5 Y2 16 2.5 2.5 L-18-20 FAÇADE LIGHTING 3.6 2.2 8 XU21 (24Nos.) 1.00 0.01

6 B2 16 2.5 2.5 L-18-20 FAÇADE LIGHTING 38.5 15 578 XL20 1.00 0.58

FCU-H-19-EL-3A / CONDENSATE PUMP (REVISED


7 R3 20 4 4 ELEVATOR LOBBY-19300 1 1 713, 100 813 AS PER TRA-SPE-TEC-AC-GEN-00219-00) & 0.90 0.73
(SDIR-0007)

40A, 4P,
8 Y3 20 SPARE 813 0.90 0.73
100mA

FCU-H-19-EL-3B/ CONDENSATE PUMP (REVISED


9 B3 20 4 4 ELEVATOR LOBBY-19300 1 1 253, 100 353 AS PER TRA-SPE-TEC-AC-GEN-00219-00) & 0.90 0.32
(SDIR-0007)

CAV-H-19-6 , CAV-H-19-5 (REVISED AS PER TRA-


10 R4 20 4 4 SERVICE LOBBY-19302 2 100.00 200 0.90 0.18
SPE-SDG-AC-00004-01)
63A,TP, ISOLATOR

40A, 4P,
100mA 11 Y4 20 SPARE 336 0.90 0.30

12 B4 20 4 4 STOARGE-21300 1 100.00 100 CAV-H-21-5, (REVISED AS PER SDIR-0007) 0.50 0.05

ELEVATOR LOBBY-19300,CORRIDOR-
13 R5 32 2X4 2X4 5 200.00 1000 RING 0.50 0.50
19301,SERVICE LOBBY-19302,STOR-19304
CORRIDOR-19301,STAIR VEST-19310,
14 Y5 32 2X4 2X4 ICE STOR.-19309,PLUMBING-19308, 7 200.00 1400 RING 0.50 0.70
ELECTRICAL ROOM-19306
40A, 4P, 15 B5 32 SPARE 1200 0.90 1.08
30mA
16 R6 32 SPARE 2000 0.90 1.80

17 Y6 20 4 4 ICE MAKER-19306 1 500.00 500 0.90 0.45

18 B6 20 4 4 L19 CORRIDOR 1 200.00 200 0.50 0.10

19 R7 16 2.5 2.5 19TH FLOOR LIGHTING CR10-73,91 35,20 6.00 312 LIGHT TYPE-C04,C04.1 1.00 0.31

20 Y7 16 2.5 2.5 19TH FLOOR LIGHTING CR10-71,81,82 6,6,6 9.5,14,10 201 LIGHT TYPE-R05,R06,R08,DS,DL 1.00 0.20

40A, 4P, 21 B7 16 2.5 2.5 19TH FLOOR LIGHTING CR10-72,92,93,94 7,6,3,2 9.5,2.5,14,20 164 LIGHT TYPE-R06.1,R09,R06,DP 1.00 0.16
100mA
22 R8 16 SPARE 147 0.90 0.13

23 Y8 16 SPARE 200.00 201 1.00 0.20

24 B8 16 SPARE 154.00 154 1.00 0.15

25 R9 20 SPARE 200 0.50 0.10


40A, 4P,
26 Y9 20 SPARE 200 0.50 0.10
30mA
27 B9 20 SPARE 200 0.50 0.10
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO-
TOTAL LOAD PER PHASE 5176 3933 3095 0.81 9.92
Isolator_ MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 12.20 KW
TOTAL LOAD (KW) 12.20
AMPS : 19.57 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 17


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-2201
LOCATION : ELECTRICAL ROOM (22304)
CONSULTANT: DEC/WSP
LEVEL 22ND CORE 3
SMDB CONNECTED TO: BB-H3-02
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 250 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8 PMU WITH BMS CONNECTION

OUT GOING:
BMS METER (RFI 12097)(AS
DB-H3-2201-08 TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 90 6.86 6.17 8.93 21.96 19.71 PER TRA-LTR-TCI-DEC-0884 -
L22)

63A SET
DB-H3-2201-09 TP 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 35 4.07 7.24 3.39 14.70 13.78 BMS METER (RFI 12097)
AT 40A

63A SET
DB-H3-2201-10 TP 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 5.97 5.77 3.89 15.63 11.64 BMS METER (RFI 12097)
AT 40A

BMS METER (SMDB ADDED AS


SMDB-H3-2401-HK TP 160 25 XLPE/LSF/SWA/LSF/CU 4C 300 1C 120 20 28.14 27.68 27.75 83.57 68.06
PER FCN 05346)
30mA ELCB for AV rack
POWER DXB AV RACK (L22) TP 25 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C10 35 2.67 2.67 2.67 8.00 6.40 (RFI 13556) 172/PJCRC19-
27/DM/SBJ/21/03801

TOTAL CONNECTED LOAD PER PHASE 47.71 49.53 46.63 143.86 119.59 0

MAXIMUM DEMAND [3PH] @ D.F 0.83 = 119.59kW TOTAL CONNECTED LOAD [3 PH] 143.86 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 18


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-2201-09 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2,Cu/XLPE/SWA/PVC + 1X1C16mm2, Cu/G/Y/PVC, ECC.
LOCATION : 22ND LEVEL SKY POOL BAR MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H3-2201

CONNECTED LOADS/POINTS LOAD PER CKT (W)

COMMANDO
USFU-SPUR
NEON LTG.

SFU-SPUR
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE SIZE DEMAND DEMAND

OUTLET

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² mm² FACTOR LOAD(KW)

D/W
16A

ISO
HD
SB

JB
R Y B

1 R1 16 2.5 2.5 STAIRCASE AREA 4 100 400 5A 1.00 0.40

2 Y1 25 6 6 LEVEL 23 ROOF 1 2500 2500 SP-IDCP(AS PER TRA-LTR-TCI-DEC-0884 - L22) 1.00 2.50

3 B1 16 2.5 2.5 BLOOM LIGHT 1 2000 2000 1.00 2.00


40A,4P,
100mA
4 R2 16 2.5 2.5 SKY POOL AREA 9, 5 19.2, 38.6 366 SP-L18, SP-L25 1.00 0.37

5 Y2 16 2.5 2.5 SKY POOL AREA 18 10 180 SP-D5 1.00 0.18

6 B2 16 2.5 2.5 SKY POOL AREA 2 5.8 12 SP-L4 1.00 0.01

7 R3 16 2.5 2.5 SKY POOL AREA 13 19.2 250 SP-L10 1.00 0.25

8 Y3 16 2.5 2.5 SKY POOL AREA 41 19.2 787 SP-L18, SP-L25 1.00 0.79

9 B3 16 2.5 2.5 SKY POOL AREA 24 8.4 202 SP-U9 1.00 0.20
40A,4P,
100mA
10 R4 16 2.5 2.5 FOH LIGHTING 6.4 5.8 37.12 SP-L4 1.00 0.04

11 Y4 16 2.5 2.5 HOT CLOSET ,SKY POOL AREA 5 14 70.0 SP-D3 1.00 0.07

12 B4 16 2.5 2.5 SKY POOL AREA 31 5.8 180 SP-L4 1.00 0.18

18185 - M2M3-CIP No. 2157 - EIP 0981 - Level 22 Point of Sale


13 R5 20 4 4 HOST STATION 2 200 400 0.8 0.32
(POS) Supplies
40A,4P,
14 Y5 20 4 4 HOST STATION 1 200 200 0.8 0.16
30mA

15 B5 20 4 4 HOST STATION 1 200 200 0.8 0.16

18185 - M2M3-CIP No. 2157 - EIP 0981 - Level 22 Point of Sale


16 R6 20 4 4 HOST STATION 1 2 200 ,400 1000 0.8 0.8
(POS) Supplies
40A,4P,
17 Y6 20 SPARE 200 0.8 0.16
30mA

18 B6 20 SPARE 200 0.8 0.16

19 R7 16 2.5 2.5 SKY POOL AREA 20.8 20 416 SP-L27 1 0.416

20 Y7 SPACE 1 0
40A,TP, ISOLATOR

21 B7 SPACE 1 0
40A,4P,
100mA
22 R8 16 2.5 2.5 LCP-H3-L2201-09 1 200 200 1 0.2

23 Y8 SPACE 1 0

24 B8 SPACE 1 0

18185 - M2M3-CIP No. 2157 - EIP 0981 - Level 22 Point of Sale


25 R9 20 4 4 HOST STATION 2 1 200 ,400 800 0.8 0.64
(POS) Supplies
40A,4P, 18185 - M2M3-CIP No. 2157 - EIP 0981 - Level 22 Point of Sale
26 Y9 20 4 4 HOST STATION 2 400 800 0.8 0.64
30mA (POS) Supplies

27 B9 20 SPARE 400 0.8 0.32

28 R10 20 SPARE 200 0.8 0.16

40A,4P,
29 Y10 25 6 6 LEVEL 23 ROOF 1 2500 2500 SP-IDCP(AS PER TRA-LTR-TCI-DEC-0884 - L22) 1 2.5
100mA

30 B10 20 SPARE 200 0.8 0.16

31 R11 SPACE 0.8 0

40A,4P,
32 Y11 SPACE 0.8 0
100mA

33 B11 SPACE 0.8 0

34 R12 SPACE 0.8 0

40A,4P,
35 Y12 SPACE 0.8 0
30mA

36 B12 SPACE 0.8 0

37 R13 SPACE 0.8 0

40A,4P,
38 Y13 SPACE 0.8 0
30mA

39 B13 SPACE 0.8 0

40 R14 SPACE 0.8 0

40A,4P,
41 Y14 SPACE 0.8 0
30mA

42 B14 SPACE 0.8 0

TOTAL LOAD PER PHASE 4069 7237 3393 0.94 13.78


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _
SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ USFU-Un-Switched Fused Connection Unit_SFU-Switched TOTAL CONNECTED LOAD (TCL): 14.70 KW
Fused Connection unit_ HD-Hand Dryer_ W A/C- Window Type AC _ S -A/C Split Type A/C_Jb- Junction Box_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 14.70
AMPS : 23.57 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 19


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-2201-08 JOB REF.:
INCOMING CABLE SIZE : 1X4C50mm2,Cu/XLPE/SWA/PVC + 1X1C25mm2, Cu/G/Y/PVC, ECC.
LOCATION : 22ND LEVEL SKY POOL BAR MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H3-2201

CONNECTED LOADS/POINTS LOAD PER CKT (W)

COMMANDO
USFU-SPUR
NEON LTG.

SFU-SPUR
LIGHTING

13A T.S/O
RATING OF RATING CKT MCB RTG CKT WIRE ECC WIRE SIZE DEMAND DEMAND

OUTLET

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
SCH

FCU
INCOMER OF ELCB NO. IN Amp. SIZE mm² mm² FACTOR LOAD(KW)

D/W
16A

ISO
HD
SB

JB
R Y B

1 R1 16 2.5 2.5 FOH LIGHT 17.7 12 212.4 1 0.2124

2 Y1 16 2.5 2.5 FOH LIGHT 37.65 12 451.8 1 0.4518

3 B1 16 2.5 2.5 SKY POOL AREA 1 150 150 SP-IDT 1 0.15


40A,4P,
100mA
4 R2 16 2.5 2.5 SKY POOL AREA 23 15 345 SP-F3 1 0.345

5 Y2 16 2.5 2.5 SKY POOL AREA 6 150 900 SP-IDW 1 0.9

6 B2 16 2.5 2.5 FOH LIGHT 7 6 42 1 0.042

7 R3 16 2.5 2.5 FOH LIGHT 6 120 720 1 0.72

8 Y3 16 2.5 2.5 SKY POOL AREA 7 8.4 58.8 SP-U9 1 0.0588

9 B3 16 2.5 2.5 SKY POOL AREA 18.5 5.8 107.3 SP-L4 1 0.1073
40A,4P,
100mA
10 R4 16 2.5 2.5 SKY POOL AREA 0.95 19.2 18.24 SP-L18 1 0.01824

11 Y4 16 2.5 2.5 SKY POOL AREA 7 16.2 113.4 SP-S1 1 0.1134

12 B4 16 2.5 2.5 SKY POOL AREA 63.5 19.2 1219.2 SP-L18 1 1.2192

13 R5 20 4 4 VVIP CABANA 2 200 400 0.8 0.32

40A,4P,
14 Y5 20 4 4 VVIP CABANA 1 300 300 0.8 0.24
30mA

15 B5 20 4 4 VVIP CABANA 1 300 300 0.8 0.24

16 R6 20 4 4 VVIP CABANA 1 300 300 0.8 0.24

40A,4P,
17 Y6 20 4 4 VVIP CABANA 2 200 400 0.8 0.32
30mA

18 B6 20 4 4 VVIP CABANA 1 200 200 0.8 0.16

19 R7 20 4 4 VVIP CABANA 1 1000 1000 0.8 0.8

40A,4P,
20 Y7 20 4 4 VVIP CABANA 2 400 800 GENERAL PURPOSE SOCKET (DEC-0736) 0.8 0.64
30mA
ELECTRIC PULL DOWN FAUCET (DEC-
21 B7 20 4 4 VVIP CABANA 1 200 200 0.8 0.16
0736)

22 R8 20 4 4 VVIP CABANA 1 1000 1000 0.8 0.8

40A,4P,
23 Y8 20 4 4 VVIP CABANA 1 500 500 0.8 0.4
30mA

24 B8 SPACE 0 0.8 0
63A,TP, ISOLATOR

25 R9 20 4 4 VVIP CABANA 1 37 37 EF-CB-22-12 0.8 0.0296

40A,4P,
26 Y9 20 SPARE 1 37 DELTEED EF-CB-22-13(DEC-0736) 0.8 0.0296
100mA

27 B9 0 0.8 0

28 R10 20 4 4 VVIP CABANA 1 200 200 FCU-CB-22-12 1 0.2

40A,4P,
29 Y10 20 4 4 VVIP CABANA 1 550 550 FCU-CB-22-13 0.8 0.44
100mA

30 B10 16 2.5 2.5 SKY POOL AREA 63.5 19.2 1219.2 SP-L18 1 1.2192

31 R11 20 4 4 VVIP CABANA 1 850 850 FOR WC WASHLET ( RFI-14169) 0.8 0.68

40A,4P,
32 Y11 20 SPARE 100 HB-CB-22-12 DELETED RFI 14784 0.8 0.08
30mA

33 B11 25 SPARE 2800 2800 HB-CB-22-13 DELETED RFI 14784 0.8 2.24

34 R12 16 2.5 2.5 SKY POOL AREA 5 1 5 SP-W9 1 0.005

35 Y12 16 2.5 2.5 SKY POOL AREA 4, 2 150 900 SP-IDW, IDF 1 0.9

36 B12 16 2.5 2.5 FOH LIGHT 22.3 12 267.6 1 0.2676


40A,4P,
100mA
37 R13 16 2.5 2.5 SKY POOL AREA 1.4, 2.4 9.6 15.84 SP-L9, SP-L15 1 0.01584

38 Y13 16 2.5 2.5 SKY POOL AREA 4 8.4 33.6 SP-U9 1 0.0336

39 B13 16 2.5 2.5 FOH LIGHT 2 12 24 1 0.024

40 R14 16 2.5 2.5 SKY POOL AREA 8.5 12 102 SP-L23 1 0.102

41 Y14 16 2.5 2.5 SKY POOL AREA 1 500 500 SP-IDP 1 0.5

42 B14 16 2.5 2.5 SKY POOL AREA 3 500 1500 SP-IDP 1 1.5

40A,4P,
43 R15 16 2.5 2.5 SKY POOL AREA 10 14 140 SP-D3 1 0.14
100mA

44 Y15 16 2.5 2.5 SKY POOL AREA 3 1 3 SP-TL1 1 0.003

45 B15 16 2.5 2.5 SKY POOL AREA 26.2 19.2 503.04 SP-L10 1 0.50304

46 R16 16 2.5 2.5 SKY POOL AREA 0.95 19.2 18.24 SP-L18 1 0.01824

40A,4P,
47 Y16 16 2.5 2.5 FOH LIGHT 6 20 120 1 0.12
100mA

48 B16 16 2.5 2.5 LCP-H3-L2201-08 1 200 200 1 0.2

49 R17 20 4 4 VVIP CABANA 1 1500 1500 FOR HAIRDRYER (DEC-0736) 0.8 1.2

40A,4P,
50 Y17 20 4 4 VVIP CABANA 2 200 400 GENERAL PURPOSE SOCKET (DEC-0736) 1 0.4
30mA

51 B17 20 4 4 VVIP CABANA 1 200 200 GENERAL PURPOSE SOCKET (DEC-0736) 1 0.2

TOTAL LOAD PER PHASE 6864 6168 8932 0.90 19.71


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _
SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ USFU-Un-Switched Fused Connection Unit_SFU-Switched TOTAL CONNECTED LOAD (TCL): 21.96 KW
Fused Connection unit_ HD-Hand Dryer_ W A/C- Window Type AC _ S -A/C Split Type A/C_Jb- Junction Box_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 21.96
AMPS : 35.23 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 20


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF :DB-H3-2201-10 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2,Cu/XLPE/SWA/PVC + 1X1C16mm2, Cu/G/Y/PVC, ECC.
LOCATION : 22ND LEVEL SKY POOL BAR MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H3-2201

CONNECTED LOADS/POINTS LOAD PER CKT (W)

SPUR OUTLET
COMMANDO
USFU-SPUR
NEON LTG.

SFU-SPUR
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE SIZE DEMAND DEMAND

OUTLET

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

S A/C

MISC
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² mm² FACTOR LOAD(KW)

D/W
16A

ISO
HD
SB

JB
R Y B

1 R1 16 2.5 2.5 L-22 CORE-3 4 58 232 1 0.232

2 Y1 16 2.5 2.5 ELEVATOR LOBBY 20.3 5 101.5 SP-D2 1 0.1015

3 B1 16 2.5 2.5 ELEVATOR LOBBY 10 15 150 SP-D8 1 0.15


40A,4P,
100mA
4 R2 16 2.5 2.5 ELEVATOR LOBBY 6 15 90 SP-D8 1 0.09

5 Y2 16 2.5 2.5 ELEVATOR LOBBY 6 7.5 45 SP-D2 1 0.045

6 B2 16 2.5 2.5 ELEVATOR LOBBY(22300) 21 19.2 403.2 SP-L10 1 0.4032

7 R3 20 4 4 SERVICE LOBBY (22300) 1 1 200, 400 600 0.5 0.3

8 Y3 20 4 4 ELEVATOR LOBBY(22300) 2 1 200, 400 800 0.5 0.4

9 B3 20 4 4 ELEVATOR LOBBY(22300) 1 400 400 0.5 0.2


40A,4P,
30mA
10 R4 20 4 4 FEMALE (22305) 1 1500 1500 HAND DRYER 0.5 0.75

11 Y4 20 4 4 MALE( 22308) 1 1500 1500 HAND DRYER 0.5 0.75

12 B4 20 4 4 FEMALE (22305) 2 200 400 HAIR DRYER 0.5 0.2

FCU-23-23304,CONDENSATE PUMP REVISED AS PER


13 R5 20 4 4 ELEVATOR LOBBY (22300) 1 1 253, 100 353 TRA-SPE-TEC-AC-GEN-00219 & SDIR 0007 (RFI 0.9 0.27
11413 & 11398)
40A,4P,
100mA FCU-SD-22-01 REVISED AS PER TRA-SPE-TEC-AC-GEN-
14 Y5 20 4 4 TOILET(22309) 1 213 213 0.9 0.27
00219
FCU-SD-22-03 REVISED AS PER TRA-SPE-TEC-AC-GEN-
15 B5 20 4 4 MALE( 22308) 1 157 157 0.9 0.27
00219

16 R6 16 2.5 2.5 ELEVATOR LOBBY 1 500 500 SP-IDP 1 0.5

17 Y6 16 2.5 2.5 ELEVATOR LOBBY 3 500 1500 SP-IDP 1 1.5

18 B6 16 2.5 2.5 ELEVATOR LOBBY/ FEMALE WR 1, 4 500, 56 724 SP-IDP , SP -D3 1 0.724
40A,4P,
100mA
19 R7 16 2.5 2.5 ELEVATOR LOBBY 21 15 315 SP-S8 1 0.315
40A,TP, ISOLATOR

20 Y7 16 2.5 2.5 LCP-H3-L2201-10 1 200 200 1 0.2

21 B7 16 2.5 2.5 ELEVATOR LOBBY 3 9.6 28.8 SP-L15 1 0.0288

SP-D12 DELETED AS PER RFI 18704


22 R8 16 2.5 2.5 ELEVATOR LOBBY, BALCONY 16 19 304 1 0.304
XL-22 ADDED IN THE SAME CKT
SP-D13 DELETED AS PER RFI 18704
23 Y8 16 2.5 2.5 CHANGING ROOM, BALCONY 12 19 228 1 0.228
XL-22 ADDED IN THE SAME CKT

24 B8 16 2.5 2.5 CHANGING ROOM 10 14 140 SP-D3 1 0.14


40A,4P,
100mA
25 R9 16 2.5 2.5 CHANGING ROOM 2, 21.6 10, 9.6 227.36 SP,D4 SP-L23 1 0.22736

26 Y9 16 2.5 2.5 CHANGING ROOM 3, 1, 17.7 14, 10, 9.6 215.2 SP-D3, SP-D10, SP-L23 1 0.2152

27 B9 16 2.5 2.5 MALE WR , TOILET 5 14 70 SP-D3 1 0.07

28 R10 20 4 4 MALE (22308) 2 200 400 HAIR DRYER 0.5 0.2

29 Y10 20 4 4 LOBBY CHANGING ROOM 3 200 600 0.5 0.3

30 B10 20 4 4 FEMALE (22305) 4 100 400 SENSOR 0.5 0.2


40A,4P,
30mA
31 R11 20 4 4 MALE (22308) &TOILET 22309) 6 100 600 SENSOR(FCN 00478) 0.5 0.2

32 Y11 20 4 4 FEMALE (22305) 4 100 400 SENSOR(FCN 00478) 0.5 0.15

33 B11 20 4 4 LOBBY CHANGING ROOM 200 0.5 0.1

34 R12 16 2.5 2.5 CHANGING ROOM 2 10 20 SP-D4 1 0.02

40A,4P,
35 Y12 20 4 4 SERVICE LOBBY (22300) 2 100 200 CAV-H-22-4 0.9 0.09
100mA
FCU-SD-22-02 REVISED AS PER TRA-SPE-TEC-AC-GEN-
36 B12 20 4 4 TOILET(22309) 1 213 213 0.9 0.27
00219

37 R13 20 4 4 FEMALE LOCKER (22312) & MALE LOCKER (22313) 3 200 600 FOR CLEANER'S SOCKET (RFI 14303) 1 0.6

38 Y13 0 0.9 0.09

39 B13 20 4 4 FEMALE LOCKER (22312) & MALE LOCKER (22313) 2 200 400 (RFI 14303) 0.9 0.27
40A,4P,
30mA
40 R14

41 Y14

42 B14 20 4 4 MALE LOCKER (22313) 1 200 200 (RFI 14303) 0.9 0.27

TOTAL LOAD PER PHASE 5969 5775 3886 0.74 11.64


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _
SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ USFU-Un-Switched Fused Connection Unit_SFU-Switched TOTAL CONNECTED LOAD (TCL): 15.63 KW
Fused Connection unit_ HD-Hand Dryer_ W A/C- Window Type AC _ S -A/C Split Type A/C_Jb- Junction Box_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 15.63
AMPS : 25.07 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 21


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-2301
LOCATION : ELECTRICAL ROOM (23304)
CONSULTANT: DEC/WSP
LEVEL 23RD CORE 3
SMDB CONNECTED TO: BB-H3-02
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (3) (3)
N/A KW KW

INCOMER TP 250 XLPE/LSF/SWA/LSF/CU 4C 150 1C 95 8

OUT GOING:
LP-LMR-H3-2303-02-P3-02 TP 100 35 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 20 13.02 13.02 13.02 39.05 39.05 WITH 500mA ELCB,

DB-H3-2301-01 TP 63A SET AT 44 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 6.29 4.51 4.14 14.94 10.28

HP-SP1 (DUTY) TP 160 35 XLPE/LSF/SWA/LSF/CU 4C 70 4C 35 35 18.27 18.27 18.27 54.80 43.84 WITH 100mA ELCB (RFI 12097)

TOTAL CONNECTED LOAD PER PHASE 37.57 35.79 35.42 108.79 93.17

MAXIMUM DEMAND [3PH] @ D.F 0.86 = 93.17kW TOTAL CONNECTED LOAD [3 PH] 108.79 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 22


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-2301-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (23304) LEVEL 23RD CORE 3 MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H3-2301

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD
R Y B

1 R1 20 4 4 LCP-H3-2301 1 250 250 1.00 0.25

2 Y1 16 SPARE 360 1.00 0.36


ELECTRICAL ROOM-23304,ELEVATOR MACH. RM-
40A, 4P, 3 B1 16 2.5 2.5 5 72 360 1.00 0.36
23302, IT ROOM-23303
100mA
4 R2 16 2.5 2.5 ELEVATOR MACH. RM-24302,GRID-B,C & 23,24 1,2 37,52 141 LIGHT TYPE-C,B1 1.00 0.14

5 Y2 16 SPARE 558 1.00 0.56

6 B2 16 SPARE 648 1.00 0.65


FCU-H-23-EL-3 / CONDENSATE PUMP
7 R3 20 4 4 23RD FLR FCU 1 1 713, 100 813 (REVISED AS PER TRA-SPE-TEC-AC-GEN- 0.90 0.73
40A, 4P, 00031-01) & (SDIR-0007)
100mA 8 Y3 20 4 4 ELEVATOR MACHINE ROOM (23301) 2 251 502 FCU-H-24-ELM-3f, FCU-H-24-ELM-3g 0.90 0.45

9 B3 16 SPARE 648 1.00 0.65

10 R4 20 4 4 23RD FLR CAV 1 100 100 CAV (REVISED AS PER SDIR-0007) 0.90 0.09
40A, 4P,
11 Y4 20 4 4 ELEVATOR MACHINE ROOM (23301) 2 251 502 FCU-H-24-ELM-3E,FCU-H-24-ELM-3d 0.90 0.45
100mA
12 B4 20 4 4 ELEVATOR MACHINE ROOM (23301) 1 185 185 FCU-H-24-ELM-3c 0.90 0.17
63A,TP, ISOLATOR

13 R5 32 2X4 2X4 LOUNGE,VESTIBULE-23300 4 1 200,400 1200 RING 0.50 0.60


VESTIBULE-23300,ELEVATOR MACH. RM-23302, IT
14 Y5 20 4 4 4 200 800 0.50 0.40
ROOM-23303
15 B5 20 SPARE 800 0.50 0.40

40A, 4P,
30mA 16 R6 32 SPARE 3000 As per TRA-OST-SDG-CL-GEN-00016 0.50 1.50

17 Y6 20 4 4 IT ROOM-23303 1 200 200 ACS LIFT PANELS FOR P3-SH01 (RFI 18813) 0.50 0.10

18 B6 20 4 4 IT ROOM-23303 1 200 200 ACS LIFT PANELS FOR P3-SH02 (RFI 18813) 0.50 0.10

19 R7 16 SPARE 286 1.00 0.29

20 Y7 16 SPARE 189 1.00 0.19

40A, 4P, 21 B7 16 SPARE 94 1.00 0.09


100mA
22 R8 20 4 4 ELEVATOR MACHINE ROOM (23302) 2 250 500 FCU-H-24-ELM-3a ,FCU-H-24-ELM-3b 0.90 0.45

23 Y8 16 SPARE ELEVATOR MACH. RM 400 0.50 0.20

24 B8 16 SPARE ELEVATOR MACH. RM 200 0.50 0.10

25 R9 SPACE
40A, 4P,
26 Y9 20 SPARE ELEVATOR MACH. RM 1000 0.50 0.50
30mA
27 B9 20 SPARE 1000 0.50 0.50

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
TOTAL LOAD PER PHASE 6290 4511 4135 0.69 10.28
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
TOTAL CONNECTED LOAD (TCL): 14.94 KW
MISC- Miscellaneous TOTAL LOAD (KW) 14.94
AMPS : 23.95 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 23


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF:BB-H1-05
CONSULTANT: DEC/WSP LOCATION : HOTEL CORE-1 ELEC. CLOSET
SMDB CONNECTED TO: MDB-H-2
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 1600 3200A BUSBAR 320

OUT GOING:

SMDB-H1-3501 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8 19.17 13.47 17.31 49.95 36.56

SMDB-H1-3601 TP 160 25 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8 23.24 26.33 22.59 72.16 49.05

SMDB-H1-3701 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8 16.04 17.16 19.46 52.66 35.43

SMDB-H1-3801 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8 21.36 19.55 22.15 63.06 46.31

SMDB-H1-3901 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8 18.45 20.09 20.18 58.72 40.19

SMDB-H1-4001 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8 15.96 17.66 17.52 51.15 35.60

REVISED AS PER UPPER SUITES


SMDB-H1-4101 TP 160 25 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8 26.93 21.79 27.12 75.84 59.70
IFCs-L40 TO L46

SMDB-H1-4201 TP 125 25 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8 13.04 18.88 13.32 45.24 33.60

REVISED AS PER UPPER SUITES


SMDB-H1-4301 TP 160 25 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8 27.32 25.28 25.70 78.29 66.08
IFCs-L40 TO L46

TOTAL CONNECTED LOAD PER PHASE 181.51 180.21 185.35 547.07 402.52

MAXIMUM DEMAND [3PH] @ D.F 0.74 = 402.52kW TOTAL CONNECTED LOAD [3 PH] 547.07 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 24


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-3501
LOCATION : ELECTRICAL ROOM (35107)
CONSULTANT: DEC/WSP
LEVEL 35TH 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 125 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8

OUT GOING:

DB-H1-3501-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 30 3.69 3.69 2.60 A2.1 (H3501)

DB-H1-3501-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 36 3.92 3.92 2.73 A18.1.1 (H3502)

DB-H1-3501-RM03 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 50 1C 25 37 7.28 7.28 4.71 B13.1.1 (H3503)

DB-H1-3501-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 24 5.56 5.56 3.68 B17.2 (H3504)

DB-H1-3501-RM05 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 26 4.96 4.77 5.02 14.75 11.43 B14.1 (H3505)

DB-H1-3501-RM06 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 26 4.96 4.77 5.02 14.75 11.43 B12.1 (H3506)

TOTAL CONNECTED LOAD PER PHASE 19.17 13.47 17.31 49.95 36.56

MAXIMUM DEMAND [3PH] @ D.F 0.73 = 36.56kW TOTAL CONNECTED LOAD [3 PH] 49.95 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 25


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-3601
LOCATION : ELECTRICAL ROOM (36109)
CONSULTANT: DEC/WSP
LEVEL 36TH 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
DB NO. MCCB kA SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 160 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8

OUT GOING:

DB-H1-3601-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 34 3.92 3.92 2.73 A6.2(H3601)

DB-H1-3601-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 37 3.69 3.69 2.60 A5.2.1(H3602)

DB-H1-3601-RM03 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 42 4.13 4.13 2.64 A4.2.1(H3603)

DB-H1-3601-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 48 4.28 4.28 3.30 A3.2(H3604)

DB-H1-3601-RM05 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 70 1C 35 48 7.91 7.91 3.68 B3.2(H3605)

DB-H1-3601-RM06 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 35 3.69 3.69 2.60 A10.2(H3606)

DB-H1-3601-RM07 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 33 3.92 3.92 2.73 A11.2(H3607)

DB-H1-3601-RM08 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 27 5.56 5.56 3.68 B17.2(H3608)

DB-H1-3601-RM09 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 26 7.95 7.95 5.08 B18.2(H3609)

DB-H1-3601-RM10 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 28 3.92 3.92 2.73 A1.2 (R)(H3610)

DB-H1-3601-RM11 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 23 3.69 3.69 2.60 A2.2 (R)(H3611)

DB-H1-3601-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 7.20 5.48 6.82 19.50 14.69

TOTAL CONNECTED LOAD PER PHASE 23.24 26.33 22.59 72.16 49.05

MAXIMUM DEMAND [3PH] @ D.F 0.68 = 49.05kW TOTAL CONNECTED LOAD [3 PH] 72.16 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 26


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-3601-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (39109) CORE "1" MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H1-3601

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

FCU/CAV
OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

S A/C
SPUR

MISC
CCU
SCH
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD

SB
R Y B

1 R1 16 2.5 2.5 36TH FLR LIGHTING CR37-01,13,21,32,33,35 1,2,4,11,1 20,14,10,9.5 202 LIGHT TYPE-DP, R06, DS, R06.1, R05 1.00 0.20

2 Y1 16 2.5 2.5 CORE 1 STAIR S01 24 14 336 LIGHT TYPE-B.W1 1.00 0.34

3 B1 16 2.5 2.5 36TH FLR LIGHTING CR37-12,31 32,11 6 258 LIGHT TYPE-C04, C04.1 1.00 0.26
40A, 4P, 4 R2 16 2.5 2.5 CORE 1 STAIR S01 24 14 336 LIGHT TYPE-B.W1 1.00 0.34
100mA
5 Y2 16 2.5 2.5 36TH FLR LIGHTING CR37-11,34 4,6,11,4 2.5,9.5,14,10 261 LIGHT TYPE-R09, R05, R06, R08 1.00 0.26

SERVICE LOBBY-36102,STORAGE ROOM-


LIGHT TYPE-B.FL5, B-D2a,B-D3a &
6 B2 16 2.5 2.5 36105,36104 ELECT RM-36109,IT ROOM-36103,IT 2,3,5 1 31, 26, 32, 100 400 1.00 0.40
SF-HT1-L05-01 (AS PER RFI 18803)
ROOM-36103,VENT-36106, STORAGE (36104)

FCU-H-36-EL-1A,CAV-H-36-2,CAV-H-36-1 /
7 R3 20 4 4 SERVICE LOBBY-36102,CORRIDOR-36101 1 3 253, 100 553 CONDENSATE PUMP (REVISED AS PER TRA- 0.90 0.50
SPE-TEC-AC-GEN-00031-01) & (SDIR-0007)
40A, 4P,
100mA 8 Y3 20 4 4 SERVICE LOBBY-37102 2 100 200 CAV-H-37-2,CAV-H-37-1 0.90 0.18
FCU-H-37-EL-1 / CONDENSATE PUMP (REVISED
9 B3 20 4 4 ELEVATOR LOBBY-37100 1 1 253, 100 353 AS PER TRA-SPE-TEC-AC-GEN-00031-01) & 0.90 0.32
(SDIR-0007)
SERVICE LOBBY-37102,STORAGE ROOM-
10 R4 16 2.5 2.5 37105,37104 ELECT RM-37109,IT ROOM-37103,IT 2,3,5 31, 26, 32 300 LIGHT TYPE-B.FL5, B-D2a,B-D3a 1.00 0.30
40A, 4P, ROOM-37103,VENT-37106
100mA 11 Y4 16 2.5 2.5 CORE 1 STAIR S01 15 14 210 LIGHT TYPE-B.W1 1.00 0.21

12 B4 16 2.5 2.5 CORE 1 STAIR S01 15 14 210 LIGHT TYPE-B.W1 1.00 0.21
40A,TP, ISOLATOR

13 R5 20 4 4 CORRIDOR-36101,SERVICE LOBBY-36102 5 200 1000 0.50 0.50


CORRIDOR-36101,STORAGE ROOM-36105,ELECT
14 Y5 32 2X4 2X4 6 200 1200 RING 0.50 0.60
RM-36109,IT ROOM-36103
CORRIDOR-37101,ICE STORE-37107, SERVICE
15 B5 32 2X4 2X4 6 200 1200 RING 0.50 0.60
LOBBY-37102
40A, 4P,
CORRIDOR-37101,VENT RM-370106,STORAGE-
30mA
16 R6 32 2X4 2X4 37105,ELECT RM-37104,IT ROOM-37103,ELEVATOR 8 200 1600 RING 0.50 0.80
LOBBY-37100
17 Y6 SPACE 0 0.50 0.00

18 B6 20 4 4 ICE MAKER-37107 1 770 770 0.90 0.69

19 R7 20 SPARE 1 270 270 0.50 0.14


40A, 4P,
30mA 20 Y7 20 SPARE 1 270 270 0.50 0.14

21 B7 20 4 4 ICE STORE -36107 500 500 0.50 0.25

22 R8 16 2.5 2.5 37TH FLR LIGHTING CR37-01,13,21,32,33,35 1,2,4,11,1 20,14,10,9.5 202 LIGHT TYPE-DP, R06, DS, R06.1, R05 1.00 0.20

23 Y8 16 2.5 2.5 37TH FLR LIGHTING CR37-11,34 4,6,11,4 2.5,9.5,14,10 261 LIGHT TYPE-R09, R05, R06, R08 1.00 0.26

40A, 4P, 24 B8 16 2.5 2.5 37TH FLR LIGHTING CR37-12,31 32,11 6 258 LIGHT TYPE-C04, C04.1 1.00 0.26
100mA
25 R9 16 2.5 2.5 LEVEL 36 BALCONY 2 36.7 73 XL22 (4Nos) 1.00 0.07

26 Y9 16 2.5 2.5 LEVEL 37 BALCONY 2 36.7 73 XL22 (4Nos) 1.00 0.07

27 B9 16 SPARE 200 1.00 0.20

28 R10 2667 0.80 2.13


40A, 4P,
29 Y10 32A TP 6 6 LEVEL 36 CORE 1 1 8000 2667 AV-C1-L36-01 0.80 2.13
30mA
30 B10 2667 0.80 2.13

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB- TOTAL LOAD PER PHASE 7203 5478 6816 0.75 14.69
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 19.50 KW
TOTAL LOAD (KW) 19.50
AMPS : 31.27 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 27


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-3701
LOCATION : ELECTRICAL ROOM (37109)
CONSULTANT: DEC/WSP
LEVEL 37TH 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 125 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8

OUT GOING:

DB-H1-3701-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 34 3.92 3.92 2.73 A6.2 (H3701)

DB-H1-3701-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 35 3.69 3.69 2.60 A5.2.1 (H3702)

DB-H1-3701-RM03 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 42 4.13 4.13 2.64 A4.2.1 (H3703)

DB-H1-3701-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 48 4.28 4.28 3.20 A3.2 (H3704)

DB-H1-3701-RM05 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 70 1C 35 48 7.91 7.91 4.85 B3.2 (H3705)

DB-H1-3701-RM06 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 35 3.69 3.69 2.60 A10.2 (H3706)

DB-H1-3701-RM07 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 33 3.92 3.92 2.73 A11.2 (H3707)

DB-H1-3701-RM08 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 24 5.56 5.56 3.68 B17.2 (H3708)

DB-H1-3701-RM09 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 20 7.95 7.95 5.08 B18.2 (H3709)

DB-H1-3701-RM10 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 28 3.92 3.92 2.73 A1.2 (R) (H3710)

DB-H1-3701-RM11 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 23 3.69 3.69 2.60 A2.2 (R) (H3711)

TOTAL CONNECTED LOAD PER PHASE 16.04 17.16 19.46 52.66 35.43

MAXIMUM DEMAND [3PH] @ D.F 0.67 = 35.43kW TOTAL CONNECTED LOAD [3 PH] 52.66 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 28


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-3801
LOCATION : ELECTRICAL ROOM (38107)
CONSULTANT: DEC/WSP
LEVEL 38TH 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 125 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8

OUT GOING:

DB-H1-3801-RM01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 35 4.96 4.77 5.02 14.75 11.43 B4.1.1 (H3801)

DB-H1-3801-RM02 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 35 4.96 4.77 5.02 14.75 11.43 B6.1.1 (H3802)

DB-H1-3801-RM03 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 23 5.56 5.56 3.67 B17.2 (H3803)

DB-H1-3801-RM04 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 25 7.28 7.28 4.70 B7.1 (H3804)

DB-H1-3801-RM05 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 26 3.92 3.92 2.73 A1.1(R) (H3805)

DB-H1-3801-RM06 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 21 3.62 3.62 2.60 A2.1 (R) (H3806)

DB-H1-3801-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 4.16 4.44 4.57 13.18 9.76

TOTAL CONNECTED LOAD PER PHASE 21.36 19.55 22.15 63.06 46.31

MAXIMUM DEMAND [3PH] @ D.F 0.73 = 46.31kW TOTAL CONNECTED LOAD [3 PH] 63.06 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 29


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-3801-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (38107) LEVEL 38TH 'CORE 1' MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H1-3801

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

W/H

D/W
HD

SB
R Y B

1 R1 20 4 4 LCP-H1-4001 1 250 250 1.00 0.25

2 Y1 16 2.5 2.5 FACADE LIGHTING 38th LEVEL 9 72 648 XU20 1.00 0.65

3 B1 SPACE 1.00 0.00


40A, 4P,
100mA 4 R2 16 2.5 2.5 BALCONY LIGHT 38th LEVEL 4 3 12 XU23 1.00 0.01
SERVICE LOBBY-38102,STORAGE ROOM-
5 Y2 16 2.5 2.5 38105,38104 ELECT RM-38109,IT ROOM-38103, 2,4,7 31, 26, 32 392 LIGHT TYPE-B.FL5, B-D2a,B-D3a 1.00 0.39
VENT-38106, MOP SINK-38108
FACADE LIGHTING ENDWALL HOTEL 10 LEVEL
6 B2 16 2.5 2.5 31 15 465 XL20 1.00 0.47
39TH & 40TH
FACADE LIGHTING ENDWALL HOTEL 10 LEVEL
7 R3 16 2.5 2.5 23 36.7 844 XL21 1.00 0.84
39TH & 40TH
FCU-H-38-EL-1 / CONDENSATE PUMP
40A, 4P,
8 Y3 20 4 4 ELEVATOR LOBBY-38100 1 1 713, 100 813 (REVISED AS PER TRA-SPE-TEC-AC-GEN- 1.00 0.81
100mA
00031-01) & (SDIR-0007)
FACADE LIGHTING ENDWALL HOTEL 09 LEVEL
9 B3 16 2.5 2.5 31 15 465 XL20 1.00 0.47
39TH & 40TH
FACADE LIGHTING ENDWALL HOTEL 09 LEVEL
10 R4 16 2.5 2.5 23 36.7 844 XL21 1.00 0.84
39TH & 40TH
40A, 4P,
100mA 11 Y4 20 4 4 SERVICE LOBBY-38102 1 100 100 CAV-H-38-1(REVISED AS PER SDIR-0007) 0.90 0.09

12 B4 20 4 4 38TH FLR SKYCOURT PROJECTOR 1 240 240 0.50 0.12


40A,TP, ISOLATOR

13 R5 20 SPARE 200 0.50 0.10

14 Y5 20 4 4 ICE STORAGE-38105 1 770 770 ICE MACHINE 0.50 0.39

15 B5 20 4 4 SERVICE LOBBY-38102,IT ROOM-38103 1 1 100,400 500 0.50 0.25


40A, 4P,
30mA ICE STORAGE-38105, ELEVATOR LOBBY-38100,
16 R6 20 4 4 3 200 600 0.50 0.30
ELECTRICAL RM-38107
17 Y6 20 SPARE 200 0.50 0.10

18 B6 20 SPARE 1500 1500 0.90 1.35

19 R7 500 0.50 0.25


40A, 4P,
20 Y7 20A TP 4 4 FAÇADE MAINT. OUTL. @ 38TH FL 1 1500 500 0.50 0.25
30mA
21 B7 500 0.50 0.25

22 R8 16 2.5 2.5 38TH FLR LIGHTING CR38-13,21,33 11,2,1 6,10,20 106 LIGHT TYPE-C04, DS,DP 1.00 0.11
40A, 4P,
23 Y8 16 2.5 2.5 38TH FLR LIGHTING CR38-11,34 8,7,3,4 9.5,14,10,2.5 214 LIGHT TYPE-R09, R05, R06, R08 1.00 0.21
100mA
24 B8 16 2.5 2.5 38TH FLR LIGHTING CR38-12,31 5,8 9.5,6 96 LIGHT TYPE-R06.1,C04, C04.1 1.00 0.10

25 R9 307 0.90 0.14


40A, 4P, REVISED AS PER TRA-SPE-SDG-WS-DIA-
26 Y9 20A TP SPARE 1 920 307 0.90 0.14
30mA 40035
27 B9 307 0.90 0.14

28 R10 500 0.50 0.25


40A, 4P,
29 Y10 20A TP 4 4 FAÇADE MAINT. OUTL. @ 38TH FL 1 1500 500 0.50 0.25
30mA
30 B10 500 0.50 0.25
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
TOTAL LOAD PER PHASE 4163 4444 4572 0.74 9.76
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 13.18 KW
TOTAL LOAD (KW) 13.18
AMPS : 21.14 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 30


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-3901
LOCATION : ELECTRICAL ROOM (39107)
CONSULTANT: DEC/WSP
LEVEL 39TH 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 125 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 8

OUT GOING:

DB-H1-3901-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 30 3.69 3.69 2.70 A2.1 (H3901)

DB-H1-3901-RM03 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 50 1C 25 37 7.95 7.95 5.08 B10.1.1(H3903)

DB-H1-3901-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 35 3.92 3.92 2.73 A18.1.1 (H3902)

DB-H1-3901-RM04 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 24 6.58 6.58 4.30 B19.1 (H3904)

DB-H1-3901-RM05 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 21 3.92 3.92 2.73 A11.1 (R)(H3905)

DB-H1-3901-RM06 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 50 1C 25 30 8.12 8.12 5.21 B20.1 (H3906)

DB-H1-3901-RM07 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 31 3.96 3.96 2.56 A29.1 (H3907)

DB-H1-3901-RM08 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 23 3.69 3.69 2.60 A5.1 (R) (H3908)

DB-H1-3901-RM09 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 21 3.92 3.92 2.73 A6.1 (R) (H3909)

DB-H1-3901-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 4.22 4.53 4.22 12.97 9.56

TOTAL CONNECTED LOAD PER PHASE 18.45 20.09 20.18 58.72 40.19

MAXIMUM DEMAND [3PH] @ D.F 0.68 = 40.19kW TOTAL CONNECTED LOAD [3 PH] 58.72 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 31


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-3901-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (39107) CORE "1" MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H1-3901

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD

SB
R Y B

1 R1 20 4 4 LCP-H1-3901 1 250 250 1.00 0.25

FAÇADE LIGHTING ENDWALL HOTEL 09 & 10


2 Y1 16 2.5 2.5 12 20 240 XP22 (20 & 20 Nos) 1.00 0.24
LEVEL 39-40
SERVICE LOBBY-39102, ICE STORAGE-
3 B1 16 2.5 2.5 39105,STORAGE-39104, VENT-39106, ELECT ROOM- 2,4,8 31, 26, 32 641 LIGHT TYPE- B.FL5, B-D2a,B-D3a 1.00 0.64
40A, 4P, 39107,IT ROOM-39103,MOB SINK-39018
100mA FAÇADE LIGHTING ENDWALL HOTEL 09 & 10
4 R2 16 2.5 2.5 4.5 2.2 10 XU21 (15Nos &15Nos) 1.00 0.01
LEVEL 39-40
SERVICE LOBBY-40102, ICE STORAGE-
5 Y2 16 2.5 2.5 40105,STORAGE-40104, VENT-40106, ELECT ROOM- 2,4,8 31, 26, 32 641 LIGHT TYPE-B.FL5, B-D2a,B-D3a 1.00 0.64
40107,IT ROOM-40103,MOB SINK-40018
FAÇADE LIGHTING ENDWALL HOTEL 09 LEVEL 39-
6 B2 16 2.5 2.5 31.5 15 473 XL20 1.00 0.47
40
FCU-H-39-EL-1 / CONDENSATE PUMP
7 R3 20 4 4 ELEVATOR LOBBY-39100 1 1 713, 100 813 (REVISED AS PER TRA-SPE-TEC-AC-GEN- 0.90 0.73
00031-01) & (SDIR-0007)
40A, 4P, FCU-H-40-EL-1 / CONDENSATE
100mA 8 Y3 20 4 4 ELEVATOR LOBBY-40100 1 1 713, 100 813 PUMP(REVISED AS PER TRA-SPE-TEC- 0.90 0.73
AC-GEN-00031-01) & (SDIR-0007)

9 B3 16 2.5 2.5 BALCONY LIGHTING LEVEL 39-40 4 36.7 147 XL22 (4Nos & 4Nos) 1.00 0.15

10 R4 20 4 4 SERVICE LOBBY-39102, 1 100 100 CAV-H-39-1 1.00 0.10


40A,TP, ISOLATOR

40A, 4P, 11 Y4 20 4 4 SERVICE LOBBY-40102, 1 100 100 CAV-H-40-1 1.00 0.10


100mA
FAÇADE LIGHTING ENDWALL HOTEL 10 LEVEL 39-
12 B4 16 2.5 2.5 31.5 15 473 XL20 0.90 0.43
40
SERVICE LOBBY-39102, ICE STORAGE-
13 R5 32 2X4 2X4 6 200 1200 RING 0.50 0.60
39105,STORAGE-39104,CORRIDOR CORE '1'
CORRIDOR CORE '1', VENT-39106,SERVICE LOBBY-
14 Y5 32 2X4 2X4 39102, ELECTRICAL ROOM-39107, ELEVATOR 8 200 1600 RING 0.50 0.80
LOBBY-39100,IT ROOM-39103
ELEVATOR LOBBY-40100,CORRIDOR CORE '1',
40A, 4P, 15 B5 32 2X4 2X4 SERVICE LOBBY-40102, ICE STORAGE-40105,PLAN 8 200 1600 RING 0.50 0.80
30mA ROOM-40109,
ELECTRICAL ROOM -40107,CORRIDOR CORE '1',
16 R6 32 2X4 2X4 6 200 1200 RING 0.50 0.60
VENT-39106,IT ROOM-40103
17 Y6 20 4 4 ICE MAKER-39106 1 500 500 0.90 0.45

18 B6 20 4 4 ICE MAKER-40106 1 500 500 0.90 0.45


19 R7 16 2.5 2.5 39TH FL LIGHTING CR42-11,34 9,7,3,4 9.5,14,10,2.5 224 LIGHT TYPE-R06.1,R06,R08,R09 1.00 0.22
20 Y7 16 2.5 2.5 39TH FL LIGHTING CR42-13,21,31 2,23 10,6 218 LIGHT TYPE--DS,C04,C04.1 1.00 0.22

21 B7 16 2.5 2.5 39TH FL LIGHTING CR42-02,12,32,33 1,8 20,9.5 96 LIGHT TYPE-DP,R06.1 1.00 0.10
40A, 4P,
100mA 22 R8 16 2.5 2.5 40TH FL LIGHTING CR42-11,34 9,7,3,4 9.5,14,10,2.5 224 R06.1,R06,R08,R09 1.00 0.22

23 Y8 16 2.5 2.5 40TH FL LIGHTING CR42-13,21,31 2,23 10,6 218 LIGHT TYPE-DS,C04,C04.1 1.00 0.22

24 B8 16 2.5 2.5 40TH FL LIGHTING CR42-02,12,32,33 1,8 20,9.5 96 LIGHT TYPE-DP,R06.1 1.00 0.10

25 R9 20 SPARE 200 0.50 0.10


40A, 4P,
26 Y9 20 SPARE 200 0.50 0.10
30mA
27 B9 20 SPARE 200 0.50 0.10
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ TOTAL LOAD PER PHASE 4220 4530 4225 0.74 9.56
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 12.97 KW
TOTAL LOAD (KW) 12.97
AMPS : 20.81 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 32


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-4001
LOCATION : ELECTRICAL ROOM (40107)
CONSULTANT: DEC/WSP
LEVEL 40TH 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 125 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8

OUT GOING:

DB-H1-4001-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 30 3.69 3.69 2.60 A2.1 (H4001)

DB-H1-4001-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 33 3.92 3.92 2.73 A18.1.1 (H4002)

DB-H1-4001-RM03 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 50 1C 25 34 7.95 7.95 5.07 B10.1.1(H4003)

DB-H1-4001-RM04 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 24 6.58 6.58 4.30 B19.1 (H4004)

DB-H1-4001-RM06 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 50 1C 25 30 8.12 8.12 5.21 B20.1 (H4006)

DB-H1-4001-RM05 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 21 3.92 3.92 2.83 A11.1 (R)(H4005)

DB-H1-4001-RM07 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 31 3.96 3.96 2.66 A29.1 (H4007)

DB-H1-4001-RM08 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 26 3.89 3.89 2.70 A5.1 (R) (H4008)

DB-H1-4001-RM09 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 16 1C 16 20 3.92 3.92 2.83 A6.1 (R) (H4009)

FOR POOL CONTROL PANEL TP 20 25 XLPE/LSF/SWA/LSF/CU 4C 4 1C 4 25 1.73 1.73 1.73 5.20 4.68 PLANT ROOM-40109

TOTAL CONNECTED LOAD PER PHASE 15.96 17.66 17.52 51.15 35.60

MAXIMUM DEMAND [3PH] @ D.F 0.70 = 35.60kW TOTAL CONNECTED LOAD [3 PH] 51.15 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 33


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-4101
LOCATION : ELECTRICAL ROOM (41104)
CONSULTANT: DEC/WSP
LEVEL 41ST 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 160 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8

OUT GOING:

REVISED AS PER UPPER


SUITES IFCs-L40 TO L46
DB-H1-4101-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 30 3.69 3.69 2.60 A1.2.1(H4101)

DB-H1-4101-RM02 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 33 3.92 3.92 2.73 A18.1.2 (H4102)

DB-H1-4101-RM03 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 50 1C 25 37 7.28 7.28 4.71 B13.1.2(H4103)

DB-H1-4101-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 28 5.56 5.56 3.68 B17.2.1 (H4104)

DB-H1-4101-01 TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 8.90 8.74 8.66 26.29 19.43 AS PER RFI 13583

40
DB-H1-4101-01-PRE. SUITE TP SET 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 1.41 1.51 1.60 4.52 4.45 REVISED AS PER UPPER
AT 32 SUITES IFCs-L40 TO L46
DB-H1-4101-02-PRE. SUITE TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 10 7.37 7.62 9.58 24.57 22.11

TOTAL CONNECTED LOAD PER PHASE 26.93 21.79 27.12 75.84 59.70 0

MAXIMUM DEMAND [3PH] @ D.F 0.79 = 59.70kW TOTAL CONNECTED LOAD [3 PH] 75.84 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 34


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-4101-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (41104) LEVEL 41ST 'CORE 1' MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H1-4101

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING CKT. MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. ROOM / AREA UNIT WATTS REMARKS

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB NO. IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD

SB
R Y B

LIGHT TYPE -
1 R1 16 2.5 2.5 ELEVATOR LOBBY-41100,CORRIDOR CORE "1" 6,7,2,4,43 9.5,14,10,2.5,6 443 1.00 0.44
R05,R06.1,R06,R08,R09,C04,C04.1
2 Y1 16 2.5 2.5 ELECTRICAL ROOM-41104,SERVICE LOBBY-41102 1,3 31,26 109 LIGHT TYPE -B.FL5,B.D2a 1.00 0.11

3 B1 16 2.5 2.5 IT ROOM-41103,SERVICE LOBBY-41102 1,4 31,26 135 LIGHT TYPE -B.FL5,B.D2a 1.00 0.14
40A, 4P, LIGHT TYPE -
ELEVATOR LOBBY-42100,CORRIDOR CORE "1", ICE 9.5,14,10,2.5,6,20,
100mA 4 R2 16 2.5 2.5 12,10,2,4,33,1 1 602 R05,R06.1,R06,R08,R09,C04,C04.1,DP & 1.00 0.60
STOR. (42107) 100
SF-HT1-L05-01 (AS PER RFI 18803)
ELECTRICAL ROOM-42104,SERVICE LOBBY-
5 Y2 16 2.5 2.5 42102,VEST.-42106,STORAGE-42105,ICE STOR.- 3,7 31,26 275 LIGHT TYPE -B.FL5,B.D2a 1.00 0.28
42107,IT ROOM-42103
6 B2 16 2.5 2.5 MECH ROOM-H4206 15 52 780 LIGHT TYPE -b1 1.00 0.78

7 R3 20 4 4 SERVICE LOBBY-41102 3 100 300 CAV-H-41-01,02,03 0.90 0.27


FCU-H-42-EL-1, FCU-H-42-SL-1 /
40A, 4P,
8 Y3 20 4 4 SERVICE LOBBY-42102,ELEVATOR LOBBY-42100 1 2 100, 142 384 CONDENSATE PUMP (REVISED AS PER TRA- 0.90 0.35
100mA
SPE-TEC-AC-GEN-00031-02) & (SDIR-0007)
9 B3 20 SPARE 2 100 200 0.90 0.18

10 R4 20 SPARE 100 0.90 0.09

40A, 4P, FCU-H-41-SL-1, FCU-H-41-EL-1 /


100mA 11 Y4 20 4 4 SERVICE LOBBY-41102,ELEVATOR LOBBY-41100 1 2 100, 157 414 CONDENSATE PUMP (REVISED AS PER TRA- 0.90 0.37
SPE-TEC-AC-GEN-00031-01) & (SDIR-0007)

12 B4 20 4 4 SERVICE LOBBY-42102 3 100 300 CAV-H-42-01,02,03 0.90 0.27


ELECTRICAL ROOM-41104,,ELEVATOR LOBBY-
13 R5 20 4 4 4 200 800 0.50 0.40
42100,CORRIDOR CORE'1'
14 Y5 20 4 4 SERVICE LOBBY-41102, IT ROOM-41103 2 1 200,400 800 0.50 0.40
IT ROOM-42103,SERVICE LOBBY-43102,CORRIDOR
40A, 4P, 15 B5 20 4 4 3 1 200,400 1000 0.50 0.50
CORE'1'
30mA ELECTRICAL ROOM-42104,STORAGE-
16 R6 20 4 4 4 200 800 0.50 0.40
42105,CORRIDOR CORE'1'
17 Y6 20 4 4 ICE STORE-42105 1 770 770 0.90 0.69

18 B6 20 SPARE 200 0.90 0.18


63A,TP, ISOLATOR

19 R7 500 0.50 0.25


40A, 4P,
20 Y7 20A TP 4 4 FAÇADE MAINT. OUTL. @ L41 1 1500 500 0.50 0.25
30mA
21 B7 500 0.50 0.25

22 R8 500 0.50 0.25


40A, 4P,
23 Y8 20A TP 4 4 FAÇADE MAINT. OUTL. @ L41 1 1500 500 0.50 0.25
30mA
24 B8 500 0.50 0.25

25 R9 2667 0.80 2.13


40A, 4P,
26 Y9 32A TP 6 6 LEVEL 41 CORE 1 1 8000 2667 AV-C1-L41-01 0.80 2.13
30mA
27 B9 2667 0.80 2.13

28 R10 16 2.5 2.5 FAÇADE LIGHTING LIGHTING-L41 9 72 648 XU20 1.00 0.65

FACADE LIGHTING ENDWALL HOTEL 12 LEVEL 42-


29 Y10 16 2.5 2.5 22 36.7 807 XL21 1.00 0.81
43
FACADE LIGHTING ENDWALL HOTEL 12 LEVEL 42-
30 B10 16 2.5 2.5 33 15 495 XL20 1.00 0.50
40A, 4P, 43
100mA
31 R11 16 2.5 2.5 BALCONY LIGHTING-L42 1 36.7 36.7 XL22 (2Nos x .5) 1.00 0.04

32 Y11 16 2.5 2.5 BALCONY LIGHTING-L41 4 3 12 XU23 1.00 0.01

FACADE LIGHTING ENDWALL HOTEL 11 LEVEL 42-


33 B11 16 2.5 2.5 25.4 15 381 XL20 1.00 0.38
43
34 R12 20 4 4 MECH ROOM-H4206 1 500 500 FCU-H4206-01 (RFI 13583) 0.90 0.45

35 Y12 20 4 4 MECH ROOM-H4206 1 500 500 FCU-H4206-02 (RFI 13583) 0.90 0.45

40A, 4P, 36 B12 20 4 4 MECH ROOM-H4206 1 500 500 FCU-H4206-03 (RFI 13583) 0.90 0.45
100mA
37 R13 20 SPARE 500.0 0.90 0.45

38 Y13 20 SPARE 500 0.90 0.45

39 B13 20 SPARE 500 0.90 0.45

40 R14 500.0 0.90 0.45


40A, 4P, PRESSURISATION UNITS FOR HEAT PUMP
41 Y14 20A TP 4 4 MECH ROOM (H4206) 1500 500 0.90 0.45
100mA (FCN 05384)

42 B14 500 0.90 0.45

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ TOTAL LOAD PER PHASE 8896 8738 8658 0.74 19.4
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 26.29 KW
TOTAL LOAD (KW) 26.29
AMPS : 42.17 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 35


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-4101-01-PRE. SUITE JOB REF.:
INCOMING CABLE SIZE : 1X4C 10mm2 CU / XLPE/SWA/LSF+ 1X1C 10mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (41104) LEVEL 41ST 'CORE 1' MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H1-4101

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING CKT. MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O
SR. NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB NO. IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD
R Y B

BEDROOM,CLOCK ROOM,GUEST WC,


1 R1 16 2.5 2.5 28.2 M 10 282 C01, C01.1, C01.2 1.00 0.28
DRESSING,BATHROOM
2 Y1 16 2.5 2.5 BEDSIDE 2,2 1.7 , 10 23.4 NL03 , DP 1.00 0.02
40A, 4P, 3 B1 16 2.5 2.5 PANTRY 4.7 M 10.8 51 C05 1.00 0.05
100mA
4 R2 16 SPARE 20 1.00 0.02
5 Y2 16 2.5 2.5 GUEST WC 2.4 M 16 38.4 C10 1.00 0.04
6 B2 16 SPARE 1200 1.00 1.20

7 R3 16 2.5 2.5 TERRACE 15.05 6 90.3 XL23 1.00 0.09

8 Y3 16 2.5 2.5 TERRACE 2 40 80 XIDL 1.00 0.08

40A, 4P, 9 B3 16 2.5 2.5 TERRACE 3 7 21 XD21 1.00 0.02


100mA
10 R4 SPACE 0 1.00 0.00

11 Y4 16 2.5 2.5 TERRACE 4 3 12 XU23 1.00 0.01

12 B4 SPACE 0 1.00 0.00


13 R5 16 2.5 2.5 TERRACE 4 3 12 XU23 1.00 0.01
14 Y5 16 2.5 2.5 TERRACE 4 10 40 XIDL 1.00 0.04

40A, 4P, 15 B5 SPACE 0 1.00 0.00


100mA 16 R6 16 2.5 2.5 LIVING 2 50 100 DP 1.00 0.10
17 Y6 16 2.5 2.5 DINNING 1 50 50 DP 1.00 0.05

18 B6 SPACE 0 1.00 0.00

19 R7 16 2.5 2.5 BEDROOM,BATHROOM&GUEST WC 2,14.4 M 6 98 R01.5, C02.2 1.00 0.10

20 Y7 SPACE 0

40A, 4P, 21 B7 SPACE 0


100mA
22 R8 16 2.5 2.5 SHOWER AREA 1 14 14 R06 1.00 0.01

23 Y8 SPACE 76
40A,TP, ISOLATOR

24 B8 16 2.5 2.5 DININING ART WORK 4 9.5 38 R03.2 1.00 0.04

25 R9 16 2.5 2.5 BAR & TV AREA 6.1 M 8 49 C03 1.00 0.05

26 Y9 16 2.5 2.5 BAR AREA 5.6 M 16.1 90.2 C06 1.00 0.09

40A, 4P, 27 B9 16 2.5 2.5 LIVING, DINING , BATHROOM 6,10,20 1.7 61.2 X12, R05, R05.1 1.00 0.06
100mA
28 R10 16 2.5 2.5 LIVING 1 10 10 DL 1.00 0.01

29 Y10 16 2.5 2.5 FOR RCU 1 200 200 1.00 0.20

30 B10 16 2.5 2.5 LIVING 2 10 20 DL 1.00 0.02

31 R11 16 2.5 2.5 LIVING 3 10 30 DL 1.00 0.03

32 Y11 16 2.5 2.5 LIVING 2 10 20 DL 1.00 0.02

40A, 4P, 33 B11 16 2.5 2.5 BEDROOM 1 10 10 DL 1.00 0.01


100mA
34 R12 16 2.5 2.5 BATHROOM 2 10 20 DL 1.00 0.02

35 Y12 16 2.5 2.5 BAR AREA 5 6 30 R01.5 1.00 0.03

36 B12 16 2.5 2.5 BATHROOM 1 1 1 NL01 1.00 0.00

37 R13 16 2.5 2.5 LIVING 52.4 M 10 524 C02.5 1.00 0.52

38 Y13 16 2.5 2.5 DINING,BEDROOM,BATROOM 41.5 M 10 415 C02 1.00 0.42

40A, 4P, 39 B13 16 2.5 2.5 BATHROOM, ENTRANCE 1,2, 12.5 9.5, 10,10 154.5 R03.3, R04, C02.1 1.00 0.15
100mA
40 R14 16 2.5 2.5 CLOCK ROOM, LIVING , DINING 16 9.5 152 R03.4, R03.2, R07 1.00 0.15

41 Y14 16 2.5 2.5 BEDROOM,BATHROOM,PANTRY,BAR 28 9.5 266 R03, R03.2, R03.4, R07 1.00 0.27

42 B14 16 2.5 2.5 LIVING & DINING 10 2.5 25 R01.4 1.00 0.03

43 R15 16 2.5 2.5 GUEST WC 1 10 10 DP 1.00 0.01

44 Y15 16 2.5 2.5 ENTRANCE AREA 18 9.5 171 DP 1.00 0.17

40A, 4P, 45 B15 16 2.5 2.5 LIVING 1 10 10 DP 1.00 0.01


100mA
46 R16 SPACE 0 1.00 0.00

47 Y16 SPACE 0 1.00 0.00

48 B16 16 2.5 2.5 LIVING 1 10 10 DL 1.00 0.01


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
TOTAL LOAD PER PHASE 1412 1511 1601 0.98 4.4
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 4.52 KW
TOTAL LOAD (KW) 4.52
AMPS : 7.26 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 36


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-4101-02-PRE. SUITE JOB REF.:
INCOMING CABLE SIZE : 1X4C 25mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (41104) LEVEL 41ST 'CORE 1' MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H1-4101

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.

DEMISTER
LIGHTING

13A T.S/O
RATING OF RATING CKT. MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O
SR. NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB NO. IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

W/H
HD
R Y B

1 R1 20 4 4 LIVING CURTAIN AREA 2 325 650 MOTORIZEED CURTAIN & BLINDS 0.90 0.59
2 Y1 20 4 4 LIVING CURTAIN AREA 2 325 650 MOTORIZEED CURTAIN & BLINDS 0.90 0.59

3 B1 20 4 4 LIVING CURTAIN AREA 2 325 650 MOTORIZEED CURTAIN & BLINDS 0.90 0.59
40A, 4P,
30mA 4 R2 20 4 4 BEDROOM CURTAIN AREA 2 325 650 MOTORIZEED CURTAIN & BLINDS 0.90 0.59
5 Y2 SPACE 0 0.90 0.00

6 B2 32 2X4 2X4 DINING CURTAIN AREA 4 325 1300 MOTORIZEED CURTAIN & BLINDS(RING) 0.90 1.17

7 R3 20 4 4 GALLERY & SUITE ENTRY AREA 3 200 600 CLEANERS SOCKETS 0.90 0.54

8 Y3 20 4 4 TV & BAR AREA 2 1 200, 400 800 FOR TV AND SAI 0.90 0.72

9 B3 32 2X4 2X4 TV & BAR AREA 3 400 1200 RING, FOR DJ EQUIPMENT 0.90 1.08
40A, 4P,
30mA 10 R4 20 4 4 DRESSING & BEDROOM AREA 3 1 200, 400 1000 MEDIA HUB & GROOMING 0.90 0.90
CLEANERS SOCKETS (TRA-LTR-TCI-
11 Y4 20 4 4 LIVING & DINNING 3 200 600 0.90 0.54
DEC-0815)
12 B4 20 4 4 BEDROOM TV AREA 2 1 200, 400 800 TV 0.90 0.72

13 R5 32 2X4 2X4 BEDSIDE 6 200 1200 USB OUTLETS(TRA-LTR-TCI-DEC-0815) 0.90 1.08

14 Y5 20 4 4 BEDROOM 1 200 200 FRIDGE 0.90 0.18


40A, 4P, 15 B5 20 4 4 BEDROOM 1 400 400 0.90 0.36
30mA 16 R6 20 4 4 BATHROOM 1 200 200 SHAVER SOCKET 0.90 0.18
17 Y6 20 4 4 LIVING 1 400 400 0.90 0.36

18 B6 20 4 4 BATHROOM 1 1500 1500 HAIR DRYER 0.90 1.35

19 R7 20 4 4 BEDROOM 2 325 650 MOTORIZEED CURTAIN & BLINDS 0.90 0.59

20 Y7 32 2X4 2X4 BATHROOM 4 325 1300 MOTORIZEED BLINDS 0.90 1.17


63A,TP, ISOLATOR

WC SENSOR,DEMISTOR&ILLUMINATED
40A, 4P, 21 B7 20 4 4 WC ROOM 3 3 100,200,134 802 0.90 0.72
MIRROR
30mA

22 R8 20 4 4 BEDROOM 1 200 200 SAFE 0.90 0.18

23 Y8 20 4 4 BAR AREA 2 400 800 GENERAL SOCKET 0.90 0.72

24 B8 20 4 4 LIVING 1 400 400 MEDIA HUB 0.90 0.36

25 R9 20 4 4 BATHROOM 1 209 209 FCU-H-41-8 0.90 0.19


40A, 4P,
26 Y9 20 4 4 BATHROOM 1 157 157 FCU-H-41-9 0.90 0.14
100mA
27 B9 20 4 4 BAR AREA 1 213 213 FCU-H-41-5 0.90 0.19

28 R10 20 4 4 BAR AREA 1 213 213 FCU-H-41-4 0.90 0.19


40A, 4P,
29 Y10 20 4 4 TV AREA 1 213 213 FCU-H-41-6 0.90 0.19
100mA
30 B10 20 4 4 TV AREA 1 213 213 FCU-H-41-7 0.90 0.19

31 R11 20 4 4 PRE. SUITE BAR 1 200 200 REFRIGERATION &FREEZER 0.90 0.18

32 Y11 20 SPARE 400 400 0.90 0.36

33 B11 20 SPARE 400 400 0.90 0.36


40A, 4P,
30mA 34 R12 20 4 4 PRE. SUITE BAR 1 200 200 WINE FREEZER UNIT 0.90 0.18

MEDIA PANEL, AMPLIFIER& GRMS


35 Y12 20 4 4 RCU CABINET 3 200 600 0.90 0.54
PANEL

36 B12 20 4 4 PANTRY 1 1000 1000 MICROWAVE 0.90 0.90

37 R13 20 4 4 PANTRY 1 1000 1000 DISH WASHER 0.90 0.90

38 Y13 20 4 4 PANTRY 1 1000 1000 FRIDGE FRRZER 0.90 0.90

40A, 4P, 39 B13 20 4 4 PANTRY 1 500 500 COFFEE MAKER 0.90 0.45
30mA
40 R14 20 4 4 PANTRY 2 200 400 0.90 0.36

41 Y14 20 4 4 PANTRY 1 500 500 WINE COOLER 0.90 0.45

42 B14 20 SPARE 200 200 0.90 0.18


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
TOTAL LOAD PER PHASE 7372 7620 9578 0.90 22.1
MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 24.57 KW
TOTAL LOAD (KW) 24.57
AMPS : 39.41 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 37


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-4201
LOCATION : ELECTRICAL ROOM (42104)
CONSULTANT: DEC/WSP
LEVEL 42ND 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCO+B15:T40MER TP 125 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 8

OUT GOING:

DB-H1-4201-RM01 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 34 3.92 3.92 2.73 A6.2.1(H4201)

DB-H1-4201-RM02 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 70 1C 35 47 8.12 8.12 5.21 B20.2 (H4202)

DB-H1-4201-RM03 SP 63 25 XLPE/LSF/SWA/LSF/CU 2C 70 1C 35 47 8.12 8.12 5.21 B20.1(H4203)

DB-H1-4201-RM04 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 25 1C 16 34 3.92 3.92 2.73 A11.2.1 (H4204)

DB-H1-4201-RM05 SP 40 25 XLPE/LSF/SWA/LSF/CU 2C 35 1C 16 32 5.56 5.56 3.68 B17.2.1 (H4205)

FOR POOL CONTROL PANEL TP 20 25 XLPE/LSF/SWA/LSF/CU 4C 4 1C 4 24 1.73 1.73 1.73 5.20 4.68
POOL PLANT ROOM
FOR POOL CONTROL PANEL TP 20 25 XLPE/LSF/SWA/LSF/CU 4C 4 1C 4 22 1.73 1.73 1.73 5.20 4.68
(H4207)
FOR POOL CONTROL PANEL TP 20 25 XLPE/LSF/SWA/LSF/CU 4C 4 1C 4 22 1.73 1.73 1.73 5.20 4.68

TOTAL CONNECTED LOAD PER PHASE 13.04 18.88 13.32 45.24 33.60

MAXIMUM DEMAND [3PH] @ D.F 0.74 = 33.60kW TOTAL CONNECTED LOAD [3 PH] 45.24 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]

CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)

MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 38


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Palm Jumeirah Crescent, Dubai U.A.E.


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H1-4301
LOCATION : ELECTRICAL ROOM (43104)
CONSULTANT: DEC/WSP
LEVEL 43RD 'CORE 1'
SMDB CONNECTED TO: BB-H1-05
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
2 2 2
DB NO. MCCB kA SWA/LSF mm mm mm (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW

INCOMER TP 160 XLPE/LSF/SWA/LSF/CU 4C 95 1C 50 8

OUT GOING:

REVISED AS PER UPPER


SUITES IFCs-L40 TO L46

DB-H1-4301-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 10 5.70 4.70 4.92 15.33 10.16

LEVEL 43 CORE 1
AV-C1-L43-01 TP 40 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 25 5.33 5.33 5.33 16.00 12.80 IT ROOM (43103) 30mA
ELCB for AV rack (RFI 13556)
40
DB-H1-4301-01-ROYAL SUITE TP SET 25 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 10 2.60 2.95 3.03 8.58 8.58
AT 32
DB-H1-4301-02-ROYAL SUITE TP 63 25 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 11 11.68 10.30 10.42 32.39 29.15

CP-HSE-02 20 25 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 25 2.00 2.00 2.00 6.00 5.40 300mA ELCB (RFI 13577)

TOTAL CONNECTED LOAD PER PHASE 27.32 25.28 25.70 78.29 66.08 1

MAXIMUM DEMAND [3PH] @ D.F 0.84 = 66.08kW TOTAL CONNECTED LOAD [3 PH] 78.29 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A

[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 39


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-4301-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (43104) LEVEL 43RD 'CORE 1' MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H1-4301

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

OUTLET
EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

S A/C
SPUR

MISC
CCU
SCH

FCU
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm² FACTOR LOAD(KW)

D/W
W/H
HD

SB
R Y B

1 R1 16 2.5 2.5 FACADE LIGHTING ENDWALL HOTEL 11 LEVEL 42-43 33 15 495 XL20 1.00 0.50

2 Y1 16 2.5 2.5 FACADE LIGHTING ENDWALL HOTEL 12 LEVEL 42-43 33 15 495 XL20 1.00 0.50

40A, 4P, ELECTR RM-43104,VEST.-43102,IT ROOM-


3 B1 16 2.5 2.5 3,5 31,26 223 LIGHT TYPE -B.FL5,B.D2a 1.00 0.22
100mA 43101,SERVICE LOBBY(43106),VENT.43105
4 R2 16 SPARE 100 1.00 0.10

5 Y2 16 SPARE FOR ELEVATOR MECH. ROOM 200 1.00 0.20

6 B2 16 SPARE FOR ELEVATOR MECH. ROOM 200 1.00 0.20


FCU-H-43-5 / CONDENSATE PUMP
7 R3 20 4 4 F-1 (H4301) 1 1 713, 100 813 (REVISED AS PER TRA-SPE-TEC-AC- 0.90 0.73
40A, 4P, GEN-00031-01) & (SDIR-0007)
100mA 8 Y3 20 4 4 F-1 (H4301), SERVICE LOBBY (43106) 2 100 200 CAV-H1-43-02 & 03 0.90 0.18

9 B3 20 4 4 VEST & STORAGE(45102) 1 900 900 FCU-H-45-ELM-1E 0.90 0.81

10 R4 16 2.5 2.5 FACADE LIGHTING ENDWALL HOTEL 12 LEVEL 42-43 4.8 20 96 XP22(16 X .3) 1.00 0.10

40A, 4P,
100mA 11 Y4 16 2.5 2.5 FACADE LIGHTING ENDWALL HOTEL 12 LEVEL 42-43 2.55 2.2 6 XU21 (17X 0.15 1.00 0.01

12 B4 16 SPARE 1 800 800 0.90 0.72


40A,TP, ISOLATOR

ELECTR RM-43104,VEST.-43102,IT ROOM-


13 R5 20 4 4 3 1 200,400 1000 0.50 0.50
43101,SERVICE LOBBY(43106)
14 Y5 20 SPARE 4 200 800 0.50 0.40

15 B5 20 4 4 ELEVATOR MECH ROOM (45101) 2 200 400 0.50 0.20


40A, 4P,
30mA 16 R6 20 SPARE 2 200 400 0.50 0.20

17 Y6 20 4 4 ELECTR RM-43104 1 200 200 FOR LCP 1.00 0.20

18 B6 20 4 4 ELEVATOR MECH ROOM (45103) 2 200 400 0.50 0.20

19 R7 500 0.50 0.25


40A, 4P,
20 Y7 20A TP 4 4 FAÇADE MAINT. OUTL. @ L43 1 1500 500 0.50 0.25
30mA
21 B7 500 0.50 0.25

22 R8 500 0.50 0.25


40A, 4P,
23 Y8 20A TP 4 4 FAÇADE MAINT. OUTL. @ L43 1 1500 500 0.50 0.25
30mA
24 B8 500 0.50 0.25

25 R9 20 4 4 ELEVATOR MECH ROOM (45103) 1 900 900 FCU-H-45-ELM-1A 0.90 0.45


40A, 4P,
26 Y9 20 4 4 ELEVATOR MECH ROOM (45103) 1 900 900 FCU-H-45-ELM-1B 0.90 0.45
100mA
27 B9 20 4 4 ELEVATOR MECH ROOM (45103) 1 100 100 CAU-H-45-01 0.90 0.45

28 R10 20 4 4 ELEVATOR MECH ROOM (45101) 1 900 900 FCU-H-45-ELM-1C 0.90 0.45
40A, 4P,
29 Y10 20 4 4 ELEVATOR MECH ROOM (45101) 1 900 900 FCU-H-45-ELM-1D 0.90 0.45
100mA
30 B10 20 SPARE 1 900 900 0.90 0.45

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _ SB-
TOTAL LOAD PER PHASE 5704 4701 4923 0.66 10.16
Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_
MISC- Miscellaneous TOTAL CONNECTED LOAD (TCL): 15.33 KW
TOTAL LOAD (KW) 15.33
AMPS : 24.58 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 40


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-4301-01-ROYAL SUITE JOB REF.:
INCOMING CABLE SIZE : 1X4C 10mm2 CU / XLPE/SWA/LSF+ 1X1C 10mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (43104) LEVEL 43RD 'CORE 1' MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : SMDB-H1-4301

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING
CKT WIRE ECC WIRE

13A T.S/O
RATING OF RATING MCB RTG DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH
SIZE mm² SIZE mm²

FCU
INCOMER OF ELCB IN Amp. FACTOR LOAD(KW)

D/W
W/H
HD
R Y B

1 R1 16 2.5 2.5 LIVING ROOM 4 25 100 DL 1.00 0.10

2 Y1 16 2.5 2.5 LIVING ROOM 3 100 300 DL 1.00 0.30

40A, 4P, 3 B1 16 2.5 2.5 DINING AREA 2 25 50 DL 1.00 0.05


100mA 4 R2 16 2.5 2.5 BEDROOM 3 10 30 DL,DP 1.00 0.03

5 Y2 16 2.5 2.5 BEDROOM 2 25 50 DL 1.00 0.05

6 B2 16 2.5 2.5 STUDY 3 100 300 DL 1.00 0.30

7 R3 16 2.5 2.5 MASTER BEDROOM 2 10 20 DP 1.00 0.02

8 Y3 16 2.5 2.5 MASTER BEDROOM 2 25 50 DL 1.00 0.05

9 B3 16 2.5 2.5 MASTER BEDROOM 1 100 100 DL 1.00 0.10


40A, 4P,
100mA 10 R4 16 2.5 2.5 SAFE ROOM 1 10 10 DP 1.00 0.01

11 Y4 16 2.5 2.5 GUEST WC 2 10 20 DL 1.00 0.02

HIS, HERS,MASTER
12 B4 16 2.5 2.5 19.2,24.4,2 6,6,6 195.6 CO1,C01.1,R01.5 1.00 0.20
BEDROOM,LIVING,DINING,BEDROOM

13 R5 16 2.5 2.5 STUDY ,GUEST WC 37.1 6 222.6 C01.1,C01 1.00 0.22

14 Y5 16 2.5 2.5 BATHROOM , DRESSING 38.4 6 230 C01.1,C01 1.00 0.23

40A, 4P, 15 B5 16 2.5 2.5 DRESSING 41.1 6 247 C01.1 1.00 0.25
100mA
16 R6 16 2.5 2.5 SAFE ROOM,DREESING , WC 2.3,26.2,4 6 195 C01,C01.1,R01.5 1.00 0.20

17 Y6 16 2.5 2.5 HIS,HERS,WC,DRESSING,BATHROOM 12.1 10 121 C01.2 1.00 0.12

18 B6 16 2.5 2.5 HIS, HERS,BATHROOM 5 0.8 4 NL01,NL02 1.00 0.00

19 R7 16 2.5 2.5 BAR AREA,ENTRY LOBBY 24 2.5, 2.4 60 R08.3,X09 1.00 0.06

20 Y7 16 2.5 2.5 WC,HIS,MASTER BEDROOM 17.2 16 275 C10 1.00 0.28

40A, 4P, 21 B7 16 2.5 2.5 KITCHEN,LIVING 14.3 10.8 154.4 C05 1.00 0.15
100mA
22 R8 16 2.5 2.5 MASTER BEDROOM 2 1.7 3.4 NL03 1.00 0.00

23 Y8 16 2.5 2.5 BAR AREA 7.2,4.8 8, 4 77 C03,C06 1.00 0.08

24 B8 16 2.5 2.5 LIVING,DINING,STUDY CURTAIN AREA 32.9 6 187 C02.2 1.00 0.19

25 R9 16 2.5 2.5 HIS,HERS,MASTERBEDROOM CURTAIN AREA 34.6 6 208 C02.2,R01.5 1.00 0.21
40A,TP, ISOLATOR

26 Y9 16 2.5 2.5 BATHROOM , DINING,LIVING 73.4 10 734 C02,C02.1,R04,S01.2 1.00 0.73

R03.4,C02,C02.1,C01.
40A, 4P, 27 B9 16 2.5 2.5 DRESSING,WC,ENTRANCE LOBBY,LIVING 4,38.7,1.8,1.8 9.5,10,10,6 756.2 1.00 0.76
1
100mA
28 R10 16 2.5 2.5 HERS,HIS,GUEST WC 28.6,4,4,4 10,10,9.5,10 439 C02,C02.1,R03,R04, 1.00 0.44

29 Y10 16 2.5 2.5 KITCHEN , LIFT LOBBY 10.6,4 10, 9.5 196 C02,R03.2 1.00 0.20

30 B10 16 2.5 2.5 LIVING, ENTRY LOBBY 14 9.5 133 R03 1.00 0.13

BEDROOM,DRESSING,BAR
31 R11 16 2.5 2.5 18 9.5 171 R03,R03.2,R04,R07 1.00 0.17
AREA,DINING,BATHROOM

32 Y11 16 2.5 2.5 DRESSING ,STUDY,LOBBY AREA,GUEST WC 2,5,8,17.1 9.5 312 R03,R03.2,R07,C02.3 1.00 0.31
40A, 4P, 33 B11 16 2.5 2.5 MASTER BEDROOM,STUDY AREA,HERS 2,28.16.2 2,9.5.10 490 R03,R03.2,R01,C02 1.00 0.49
100mA
34 R12 16 2.5 2.5 DINING AREA 4.1 36 148 C02.3 1.00 0.15
R01,R02,R08.1,R08.2,
35 Y12 16 2.5 2.5 LIVING ROOM,BEDROOM,BATHROOM 2,1,32,16,20 2.4,2.2 170 1.00 0.17
R10
36 B12 16 2.5 2.5 HIS,HERS,LIFT LOBBY 6,4 2.2,2.5 23 R02,R09 1.00 0.02

37 R13 16 2.5 2.5 ENTRANCE LOBBY,DRESSING AREA 2,1 200,100 500 DP 1.00 0.50

38 Y13 16 SPARE 15 1.00 0.01

40A, 4P, 39 B13 16 2.5 2.5 MASTER BED ROOM 1.2 15 18 C02.4 1.00 0.02
100mA
40 R14 16 2.5 2.5 DINING 2 60,300 360 DP 1.00 0.36

41 Y14 16 2.5 2.5 LIFT LOBBY 1 200 200 DP 1.00 0.20

42 B14 16 2.5 2.5 L-43 SKY COURT 13.33 6 80 XL23 1.00 0.08

43 R15 16 2.5 2.5 L-43 SKY COURT 8 10 80 XIDL 1.00 0.08

44 Y15 16 2.5 2.5 L-43 SKY COURT 2 40 80 XIDW 1.00 0.08

40A, 4P, 2.4 B15 16 2.5 2.5 L-43 SKY COURT 2.4 36.7 88 XL22 1.00 0.09
100mA
46 R16 16 2.5 2.5 L-43 SKY COURT 1.6 36.7 59 XL22 1.00 0.06

47 Y16 16 2.5 2.5 L-43 SKY COURT 3.2 36.7 117 XL22 1.00 0.12

48 B16 16 2.5 2.5 FOR LCP 1 200 200 1.00 0.20

49 R17 0 1.00 0.00

50 Y17 0 1.00 0.00

40A, 4P, 51 B17 0 1.00 0.00


100mA
52 R18 0 1.00 0.00

53 Y18 0 1.00 0.00

54 B18 0 1.00 0.00


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _
TOTAL LOAD PER PHASE 2605 2947 3026 1.00 8.58
SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO-
Isolator_ MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 8.58 KW
TOTAL LOAD (KW) 8.58
AMPS : 13.76 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 41


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H1-4301-02-ROYAL SUITE JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X1C 16mm2, CU/G/Y/LSF ECC
LOCATION : ELECTRICAL ROOM (43104) LEVEL 43RD 'CORE 1' MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H1-4301

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING
CKT WIRE ECC WIRE

13A T.S/O
RATING OF RATING MCB RTG DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C
SPUR

MISC
CCU
SCH
SIZE mm² SIZE mm²

FCU
INCOMER OF ELCB IN Amp. FACTOR LOAD(KW)

D/W
W/H
HD
R Y B

1 R1 20 4 4 HIS & HERS BATHROOM 2 2 200 ,134 668 SHAVER SOCKET 0.90 0.60

FRIDGE,MIRROR LIGHT,MIRROR
2 Y1 20 4 4 MASTER BEDROOM 1 1 2 200 ,100,134 568 0.90 0.51
DEMISTER
40A, 4P,
3 B1 32 6 6 MASTER BEDROOM 5 1 200, 400 1400 RING 0.90 1.26
30mA
4 R2 32 6 6 MASTER BED ROOM 8 200 1600 RING (TRA-LTR-TCI-DEC-0815) 0.90 1.44

5 Y2 20 4 4 STUDY AREA 4 200 800 TV,MEDIA HUB 0.90 0.72

6 B2 20 4 4 BAR AREA 3 1 200, 400 1000 SAI,FRIDGE ,CL 0.90 0.90

7 R3 32 2x4 2x4 BEDROOM 8 200 1600 RING (TRA-LTR-TCI-DEC-0815) 0.90 1.44

8 Y3 20 4 4 DINING&LIVING 5 200 1000 TV,CL 0.90 0.90

40A, 4P, 9 B3 20 4 4 DINING AREA 3 1 200, 400 1000 0.90 0.90


30mA
10 R4 20 4 4 DRESSING 1 2000 2000 IRONING 0.90 1.80

11 Y4 20 4 4 BEDROOM 2 1 200, 400 800 0.90 0.72

12 B4 20 SPARE 200 0.90 0.18

13 R5 32 2x4 2x4 HIS & HERS BATHROOM CURTAIN AREA 6 200 1200 RING 0.90 1.08

14 Y5 32 2x4 2x4 MASTER BED ROOM CURTAIN AREA 4 200 800 RING 0.90 0.72

40A, 4P, 15 B5 32 2x4 2x4 STUDY & LIVING CURTAIN AREA 4 200 800 RING 0.90 0.72
30mA
16 R6 32 2x4 2x4 LIVING CURTAIN AREA 4 200 800 RING 0.90 0.72

17 Y6 20 4 4 DINING CURTAIN AREA 2 200 400 0.90 0.36

18 B6 32 2x4 2x4 BEDROOM & BATHROOM CURTAIN AREA 6 200 1200 RING 0.90 1.08

19 R7 20 4 4 HIS&HERS BATHROOM 3 100 300 SENSOR 0.90 0.27

20 Y7 20 4 4 DRESSING ,LOBBY AREA 4 200 800 CLEANERS 0.90 0.72

40A, 4P, 21 B7 20 4 4 BEDROOM 4 200 800 TV,HAIR DRYER 0.90 0.72


30mA
22 R8 20 4 4 GUEST WC 2 100 200 SENSOR 0.90 0.18

23 Y8 20 4 4 SAFE ROOM 1 200 200 SAFE 0.90 0.18

24 B8 20 4 4 MASTER BEDROOM 2 200 400 HAIR DRYER 0.90 0.36

25 R9 20 4 4 BATHROOM 1 100 100 SENSOR 0.90 0.09


63A,TP, ISOLATOR

SHAVER SOCKET , MIRROR


26 Y9 20 4 4 BATHROOM 2 3 200,100,134 702 0.90 0.63
LIGHT,DEMISTER
40A, 4P, 27 B9 20 4 4 KITCHEN 1 1000 1000 FRIDGE FREEZER 0.90 0.90
30mA
28 R10 20 4 4 KITCHEN 2 500 1000 COFFEE MAKER,MICROWAVE 0.90 0.90

29 Y10 20 4 4 KITCHN 1 500 500 DISH WASHER 0.90 0.45

30 B10 20 4 4 KITCHEN 1 500 500 WINE COOLER 0.90 0.45

31 R11 20 4 4 DRESSING AREA 1 989 989 FCU-H-43-9 0.90 0.89


40A, 4P,
32 Y11 20 4 4 STUDY ROOM AREA 1 713 713 FCU-H-43-7 0.90 0.64
100mA
33 B11 20 4 4 LIVING ROOM AREA 1 213 213 FCU-H-43-2 0.90 0.19
34 R12 20 4 4 DRESSING AREA 1 251 253 FCU-H-43-11 0.90 0.23
40A, 4P, 35 Y12 20 4 4 DINING AREA 1 713 713 FCU-H-43-3 0.90 0.64
100mA
36 B12 20 4 4 ENTRY AREA 1 713 713 FCU-43-5 0.90 0.64

37 R13 20 4 4 DRESSING 1 713 713 FCU-H-43-4 0.90 0.64


40A, 4P, 38 Y13 20 4 4 STUDY AREA 1 989 989 FCU-H-43-1 0.90 0.89
100mA
39 B13 20 4 4 STUDY AREA 1 989 989 FCU-H-43-8 0.90 0.89

40 R14 20 4 4 DRESSING AREA 1 253 253 FCU-H-43-10 0.90 0.23


40A, 4P,
41 Y14 20 4 4 ENTRY AREA 1 713 713 FCU-43-6 0.90 0.64
100mA
42 B14 SPACE

43 R15 SPACE

44 Y15 20 4 4 KITCHEN 2 200 400 0.90 0.36

40A, 4P, 45 B15 20 4 4 BAR AREA 1 200 200 WINE REFRIGERATION UNIT 0.90 0.18
30mA
46 R16 SPACE

47 Y16 20 4 4 BAR AREA 1 200 200 REF.& FREEZER UNIT 0.90 0.18

48 B16 SPACE

49 R17 SPACE

50 Y17 SPACE

40A, 4P, 51 B17 SPACE


30mA
52 R18 SPACE

53 Y18 SPACE

54 B18 SPACE
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water Heater _
TOTAL LOAD PER PHASE 11676 10298 10415 0.90 29.15
SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO-
Isolator_ MISC- Miscellaneous
TOTAL CONNECTED LOAD (TCL): 32.39 KW
TOTAL LOAD (KW) 32.39
AMPS : 51.95 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 42


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND
AREA: Palm Jumeirah Crescent, Dubai U.A.E.
PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C
SMDB REF: SMDB-H3-LG01
CONSULTANT: DEC/WSP LOCATION : ELECTRICAL ROOM (L306)
SMDB CONNECTED TO: MDB-H-2
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROPOSED TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE 3 PHASE LV/HV CT REMARKS
DB NO. MCCB kA SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1) (2) (3)
N/A KW KW
INCOMER TP 400 XLPE/LSF/SWA/LSF/CU 4C 300 1C 150 70

OUTGOING

DB-H3-LG01-01 TP 160 35 XLPE/LSF/SWA/LSF/CU 4C 70 1C 35 18 21.11 23.67 21.04 65.81 43.93 MECHANICAL LOAD UPDATED

100A With Starter and 100mA ELCB


AHU-LG-06 TP 35 XLPE/LSF/SWA/LSF/CU 4C 35 1C 16 37 12.33 12.33 12.33 37.00 37.00
SET@80A PROVIDED IN CONTROL PANEL

WATER FEATURE FOR HOTEL CORE 3 GH-WF1 TP 32 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 50 4.67 4.67 4.67 14.00 14.00

RETAIL L1408 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 60 5.00 5.00 5.00 15.00 12.00 BMS METER (RFI 12097)

DB-H3-LG01-02 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 20 10.22 8.82 10.42 29.45 19.21


LOWER GROUND CORE 3
AV-C3-LGL-ESR (RACK 1) TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 10 1C 10 31 4.00 4.00 4.00 12.00 9.60 IT ROOM (L303) 30mA ELCB for AV
rack (RFI 13556)

TOTAL CONNECTED LOAD PER PHASE 57.33 58.48 57.46 173.27 135.74
MAXIMUM DEMAND [3PH] @ D.F 0.78 = 135.74kW TOTAL CONNECTED LOAD [3 PH] 173.27 kW

TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 43


PROJECT :THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-LG01-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 70mm2 CU / XLPE/SWA/LSF+ 1X 1C 35 mm2, CU/G/Y/LSF ECC
LOCATION : STORAGE (L308) MAIN INCOMER : 160A,TP, ISOLATOR FED FROM : SMDB-H3-LG01

CONNECTED LOADS/POINTS LOAD PER CKT (W)


CKT ECC

NEON LTG.
RATING RATING DEMAN DEMAND

LIGHTING

13A T.S/O
SR. CKT MCB RTG WIRE WIRE UNIT

OUTLET
EX. FAN

13A S/O
SH. S/O

5A S/O

S A/C
SPUR
OF OF ROOM / AREA REMARKS D LOAD(KW

MISC
CCU
SCH

FCU
D/W
NO. NO. IN Amp. SIZE SIZE WATTS

SB
INCOMER ELCB R Y B FACTOR )
mm² mm²

CORRIDOR (L300), IWSR (L309), HK STORE


52, 21, 19,
1 R1 16 2.5 2.5 (L304), SERVICE LOBBY (L302), IT ROOM 17 521 LTG. TYPE-b1,B-D1,B-D2,B-FL5 1.00 0.52
31
(L303)
2 Y1 16 2.5 2.5 LIGHTING 14 72 1008 1.00 1.01
40A,4P, 3 B1 16 SPARE 14 72 1008 1.00 1.01
100mA
4 R2 16 2.5 2.5 CORRIDOR (L-0913) 15 1 200 200 ARTWORK (RFI 11782) 1.00 0.20
LG FAN ROOM #3 (L-1008), ELEC.ROOM (L-
5 Y2 16 2.5 2.5 9 52 468 LTG. TYPE-b1 1.00 0.47
1004)
6 B2 16 SPARE 15 72 1080 1.00 1.08
VAV-LG-06-10 AS PER RFI TRA-SBJ-
7 R3 20 4 4 CORRIDOR (L0913) 1 100 100 1.00 0.10
RFI-EL-GEN-08443
VAV-LG-06-04,06,08,09 TRA-SBJ-RFI-
8 Y3 20 4 4 CIRCULATION (L-1433) 4 100 400 1.00 0.40
EL-GEN-08443
40A,4P,
100mA 9 B3 16 2.5 2.5 LUGGAGE ROOM (L-1005) 7 32 224 LTG. TYPE-B-F2 1.00 0.22
10 R4 16 2.5 2.5 LUGGAGE ROOM (L-1005) 20 21, 32 629 LTG. TYPE B-F2, B-D4 1.00 0.63
11 Y4 16 2.5 2.5 LUGGAGE ROOM (L-1005) 11 21, 32 341 LTG. TYPE B-F2, B-D4,B-FL5 1.00 0.34
12 B4 16 2.5 2.5 WOMEN'S WC (L-1006), MEN'S W.C. (L-1007) 14 15, 15 210 LTG. TYPE B-D10, B-D11 1.00 0.21
VAV-LG-06-05 TRA-SBJ-RFI-EL-GEN-
13 R5 20 4 4 CORRIDOR L-1440 1 100 100 1.00 0.10
08443
14 Y5 16 2.5 2.5 ENGINEERING STORE (L-1011) 8 32 256 LTG. TYPE-BD1a,BD1b 1.00 0.26
COORIDOR,VESTBULE (L-1429),LUGGAGE
15 B5 16 2.5 2.5 11, 7 21, 32 455 LTG.TYPE-BD1,BF2 1.00 0.46
40A,4P, STORE(L-1404)
100mA MANAGER (L-1406), PRINTER (L-1438),
16 R6 16 2.5 2.5 16 21, 11, 29 324 LTG. TYPE-BD1,BD5,BLP1 1.00 0.32
COORIDOR (L-1440)
17 Y6 16 SPARE 200 1.00 0.20

18 B6 20 4 4 TRANSIT LOUNGE (L-1405), RETAIL (L-1408) 4 100 400 JB FOR LIGHTING 1.00 0.40

ITEM -HUS-03 GLUE FLY KILLER


19 R7 20 4 4 FISH ROOM(L-0981) 1 1000 1000 (REVISED AS PER-TRA-ELE-SDG-EL- 0.50 0.50
L00-63002)
20 Y7 20 4 4 MALE CHANGE ROOM (L-1402) 2 3 200 1000 0.50 0.50
40A,4P, FOR KINETIC BAIT BALL (EI 1282)
21 B7 20 4 4 CIRCULATION (L-1433) 1 400 400 0.50 0.20
30mA (FCN 05092)
22 R8 20 4 4 MALE CHANGE ROOM (L-1402) 2 2 200 800 0.50 0.40
23 Y8 20 4 4 MALE CHANGE ROOM (L-1402) 1 400 400 0.50 0.20
CORRIDOR (L-1403), LUGGAGE STORE (L-
24 B8 20 4 4 3 200 600 0.50 0.30
1404)
25 R9 20 4 4 TRANSIT LOUNGE (L-1405) 2 400 800 0.50 0.40
STORE (L308), ELECT.ROOM (L306),
26 Y9 32 2x4 2x4 6 200 1200 RING 0.50 0.60
PLUMB.(L305 & L307), IWSR (L309)
27 B9 20 SPARE 800 172/PJCRC19-27/DM/SBJ/20/03078 0.50 0.40
40A,4P, IT ROOM (L303), SERVICE LOBBY (L302),
30mA 28 R10 20 4 4 STORAGE (L310), CORRIDOR (L-0913), 5 200 1000 0.50 0.50
ELEVATOR LOBBY (L301)
29 Y10 32 2x4 2x4 CORRIDOR (L-1305), HOTEL PARKING 6 200 1200 RING 0.50 0.60
LG FAN ROOM #3 (L-1008), ELEC.ROOM (L-
30 B10 20 4 4 4 200 800 0.50 0.40
1004), IT ROOM (L-1012)
31 R11 32 2x4 2x4 TRANSIT LOUNGE (L-1405) 5 2 200, 400 1800 RING 0.50 0.90
32 Y11 20 4 4 CIRCULATION (L-1433) 1 1500 1500 MOTORISED BLINDS 0.50 0.75
33 B11 20 4 4 TRANSIT LOUNGE (L-1405) 2 200 400 0.50 0.20
40A,4P,
30mA 34 R12 20 4 4 TRANSIT LOUNGE (L-1405) 1 200 200 0.50 0.10
35 Y12 20 4 4 TRANSIT LOUNGE (L-1405) 1 2 200, 400 1000 0.50 0.50
MANAGER (L-1406),
36 B12 20 4 4 2 200 400 RFI-07363 0.50 0.20
TRANSIT LOUNGE (L-1405)
37 R13 32 2x4 2x4 TRANSIT LOUNGE (L-1405) 7 200 1400 RING 0.50 0.70

38 Y13 32 2x4 2x4 TRANSIT LOUNGE (L-1405) 1 4 200, 400 1800 RING(AS PER RFI 11634) 0.50 0.90

RING (REVISED AS PER-TRA-SPE-


40A,4P, 39 B13 32 2x4 2x4 WORK ROOM (L-0912) 1 3 200, 400 1400 0.50 0.70
SDG-PS-L00-00009-06)
30mA
40 R14 20 4 4 LOUNGE (L-1405a) 5 200 1000 FLOOR BOX 0.50 0.50
160A,TP, ISOLATOR

INTERNAL AUDIT (L-1407), MANAGER (L-


41 Y14 32 2x4 2x4 2 2 200, 400 1200 RING 0.50 0.60
1406), LOUNGE (L-1405a)
MOTORIZED
42 B14 20 4 4 FEMALE PRAYER ROOM (L-1301) 1 1500 1500 0.50 0.75
BLINDS
43 R15 32 2x4 2x4 TRANSIT LOUNGE (L-1405) 2 4 200, 400 2000 RING (AS PER RFI 11634) 0.50 1.00
FOR TIME & ATTENDANCE CLOCK
44 Y15 20 4 4 CORRIDOR (L-1305) 2 200 400 0.50 0.20
(EI 1282) (FCN 05092)
40A,4P, MANAGER (L-1406 & L-0917), TRANSLATE
45 B15 32 2x4 2x4 2 2 200, 400 1000 RING 0.50 0.50
30mA LOUNGE (L-1405)
46 R16 20 4 4 CIRCULATION (L-1433) 4 200 800 0.50 0.40
47 Y16 20 4 4 CIRCULATION (L-1433) 1 1500 1500 MOTORIZED BLINDS 0.50 0.75
48 B16 20 4 4 CIRCULATION (L-1433) 1 1500 1500 MOTORIZED BLINDS 0.50 0.75
ENTRY AND SHOE STORAGE (L-0919 & L-
49 R17 32 2x4 2x4 1306), MALE PRAYER ROOM (L-1302), 6 200 1200 RING 0.50 0.60
40A,4P, FEMALE PRAYER ROOM (L-1301)
30mA 50 Y17 20 4 4 MALE PRAYER ROOM (L-1302) 1 1500 1500 MOTORIZED BLINDS 0.50 0.75
ITEM-HUS11-ICE CUBER(AS PER RFI
51 B17 20 4 4 FISH ROOM(L-0981) 1 1600 1600 0.50 0.80
15361)
MALE CHANGE ROOM (L-1402), FEMALE
52 R18 20 4 4 4 100 400 JB FOR LIGHTING 1.00 0.40
40A,4P, CHANGE ROOM (L-1401)
100mA 53 Y18 16 2.5 2.5 HOTEL PARKING 10 70 700 LTG. TYPE-F1 1.00 0.70
54 B18 16 2.5 2.5 HOTEL PARKING 10 70 700 LTG. TYPE-F1 1.00 0.70
55 R19 20 4 4 LUGGAGE ROOM (L-1005) 1 1100 1100 LUGGAGE SCANNER 0.50 0.55
40A,4P, FCU-LG-74 (REVISED AS PER TRA-
56 Y19 20 4 4 LOUNGE (L-1405a) 1 157 157 0.90 0.14
100mA SPE-TEC-AC-GEN-00030-00)
FCU-LG-72 (REVISED AS PER TRA-
57 B19 20 4 4 LUGGAGE STORE (L-1404) 1 92 92 0.50 0.05
SPE-TEC-AC-GEN-00030-01)
58 R20 16 2.5 2.5 CORRIDOR (L-1305) 13 21 273 LTG. TYPE-BD1 1.00 0.27
40A,4P,
59 Y20 16 2.5 2.5 CORRIDOR (L-1305) 12 21 252 LTG. TYPE-BD1 1.00 0.25
100mA
60 B20 16 2.5 2.5 HOTEL PARKING 8 34 272 LTG. TYPE-F2 1.00 0.27
61 R21 16 2.5 2.5 HOTEL PARKING 11 70 770 LTG. TYPE-F1 1.00 0.77
40A,4P,
62 Y21 16 2.5 2.5 HOTEL PARKING 11 70 770 LTG. TYPE-F1 1.00 0.77
100mA
63 B21 16 2.5 2.5 HOTEL PARKING 10 34 340 LTG. TYPE-F2 1.00 0.34
FCU-LG-70 (REVISED AS PER TRA-
64 R22 20 4 4 MALE CHANGE ROOM (L-1402) 1 157 157 0.90 0.14
SPE-TEC-AC-GEN-00030-00)

FCU-LG-71(REVISED AS PER TRA-SPE-


40A,4P, 65 Y22 20 4 4 FEMALE CHANGE ROOM (L-1401) 1 713 713 0.90 0.64
TEC-AC-GEN-00030-00)
100mA

FCU-LG-57 (REVISED AS PER TRA-


66 B22 20 4 4 CORRIDOR (L-1305) 1 713 713 0.90 0.64
SPE-TEC-AC-GEN-00030-00)

67 R23 20 4 4 FISH ROOM(L-0981) 1 300 300 ITEM -HUS-07 KNIFE STERILISER 0.50 0.15

40A,4P, 68 Y23 32 2X4 2X4 FEMALE CHANGE ROOM(L-1401) 3 2 200,400 1400 RING(FCN 0120) 0.50 0.70
30mA
69 B23 20 4 4 CORRIDOR (L300), CIRCULATION (L-1433) 3 200 600 0.90 0.54

70 R24 500 TRANSFORMER EXHAUST FAN(TEF) 0.90 0.45


40A,4P,
71 Y24 20A TP 4 4 TEF-LG-00 1500 500 ADDED AS PER LATEST MECHANICAL 0.90 0.45
100mA
EQUIPMENT SELECTION
72 B24 500 0.90 0.45

73 R25 20 4 4 FISH ROOM(L-0981) 1 45 45 ITEM HUS-04- PLASMA IONISATION 0.50 0.02

40A,4P, 74 Y25 20 SPARE 200 172/PJCRC19-27/DM/SBJ/20/03078 0.50 0.10


30mA
REVISED AS PER-TRA-SPE-SDG-PS-
75 B25 20 4 4 WORK ROOM(L-0912) 1 2 1000 1000 0.50 0.50
L00-00009-06

76 R26 16 2.5 2.5 PODIUM FACADE LIGHTING GROUND FLOOR 57 15 855 XL2 (TRA-SPE-SDG-LT-G00-00105) 0.90 0.77

40A,4P,
77 Y26 16 2.5 2.5 PODIUM FACADE LIGHTING GROUND FLOOR 21 37 768 XL8 (TRA-SPE-SDG-LT-G00-00105) 0.90 0.69
100mA
FCU-LG-60 (REVISED AS PER TRA-
78 B26 20 4.0 4.0 WORK ROOM (L-0912) 1 213 213 0.90 0.19
SPE-TEC-AC-GEN-00030-00)
79 R27 1167 0.80 0.93
40A,4P,
80 Y27 20A TP SPARE 1 3500 1167 0.80 0.93
30mA
81 B27 1167 0.80 0.93
82 R28 1667 0.80 1.33
40A,4P, AV-C3-LGL-01
83 Y28 20A TP 4.0 4.0 LOWER GROUND CORE 3 1 5000 1667 0.80 1.33
30mA (2 No's)
84 B28 1667 0.80 1.33
TOTAL LOAD PER PHASE 21107 23667 21040 0.67 43.93
NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket
Outlet _ W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control TOTAL CONNECTED LOAD (TCL): 65.81 KW
Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 65.81
AMPS : 105.55 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 44


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-LG01-02 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2 CU / XLPE/SWA/LSF+ 1X 1C 16 mm2, CU/G/Y/LSF ECC
LOCATION : STORAGE (L308) MAIN INCOMER : 63A,TP, ISOLATOR FED FROM : SMDB-H3-LG01

CONNECTED LOADS/POINTS LOAD PER CKT (W)

NEON LTG.
LIGHTING

13A T.S/O
RATING OF RATING MCB RTG CKT WIRE ECC WIRE DEMAND DEMAND

EX. FAN

13A S/O

20A S/O
SH. S/O
SR. NO. CKT NO. ROOM / AREA UNIT WATTS REMARKS

W A/C

S A/C

MISC
CCU
SCH
INCOMER OF ELCB IN Amp. SIZE mm² SIZE mm²

FCU
FACTOR LOAD(KW)

D/W
SB
R Y B

1 R1 333 0.90 0.30


COURTYARD WATER FEATURE (TRA-LTR-TCI-DEC-
40A,4P,
2 Y1 20A TP 4 4 PRAYER ROOM COURTYARD 1000 333 0533 - Prayer Room Courtyard MEP (EIP-0593) 0.90 0.30
100mA
Updated Drawings - IFC Submission)
3 B1 333 0.90 0.30

4 R2 667 0.90 0.60


20A ISOLATOR
40A,4P,
5 Y2 20A TP 4 4 MEN'S W.C (L-1007) 1 2000 667 FOR TEF-LG-05 0.90 0.60
100mA
6 B2 667 0.90 0.60

7 R3 20 SPARE 157 REMOVE FCU AS PER TRA-SBJ-RFI-AC-GEN-06775 0.90 0.14

40A,4P, FCU-LG-58, FCU-LG-65 (REVISED AS PER TRA-


100mA 8 Y3 20 4 4 LUGGAGE ROOM (L-1005), HOTEL PARKING 2 209, 213 422 0.90 0.38
SPE-TEC-AC-GEN-00030-00)

9 B3 20 SPARE 1000 1000 0.90 0.90


VAV-LG-06-01-VAV-LG-06-02 (REVISED AS PER
10 R4 20 4 4 ABLUTION L-1308, PRAYER ROOM L-0918 2 100 200 0.90 0.18
TRA-SBJ-RFI-EL-GEN-08443-00)
40A,4P,
100mA 11 Y4 20 SPARE 200

12 B4 20 SPARE 200

FCU-LG-59, FCU-LG-24 (REVISED AS PER TRA-


13 R5 20 4 4 LG FAN ROOM (L-1008), CORRIDOR ( L-1305), 2 157 314 0.90 0.28
SPE-TEC-AC-GEN-00030-00)
FCU-LG-67 (REVISED AS PER TRA-SPE-TEC-AC-
14 Y5 20 4 4 MALE W.C (L-0909), 1 157 157 0.90 0.14
GEN-00030-00)
FCU-LG-63 (REVISED AS PER TRA-SPE-TEC-AC-
15 B5 20 4 4 MEN'S W.C (L-1007) 1 157 157 0.90 0.14
40A,4P, GEN-00030-00)
100mA FCU-LG-69 (REVISED AS PER TRA-SPE-TEC-AC-
16 R6 20 4 4 ABLUTION ROOM (L-1308) 1 213 213 0.90 0.19
GEN-00030-00)
FCU-LG-127, FCU-LG-128 (REVISED AS PER TRA-
17 Y6 20 4 4 MALE CHANGE ROOM (L-1402) 2 157 314 0.90 0.28
SPE-TEC-AC-GEN-00030-00)
JUNCTION BOX FOR
18 B6 20 4 4 MEN'S W.C (L-1007), WOMEN'S W.C (L-10076) 2 200 400 0.50 0.20
HANDYCAP ALARM
19 R7 20 4 4 FEMALE CHANGE ROOM (L-1401) 1 1500 1500 FOR HAND DRAYER 0.50 0.75
FOR ELECTRONIC FAUCET, TOILET FLUSHER
20 Y7 20 4 4 ABLUTION ROOM (L-1308) 20 50 1000 1.00 1.00
AND URINAL

40A,4P, 21 B7 20 4 4 MALE CHANGE ROOM (L-1402) 1 1500 1500 FOR HAND DRAYER 0.50 0.75
30mA FOR ELECTRONIC FAUCET, TOILET FLUSHER
22 R8 20 4 4 San. Elec. Dev-Prayer Rms.ABLUTION RM(L-1303) 25 50 1250 1.00 1.25
AND URINAL
63A,TP, ISOLATOR

23 Y8 20 4 4 MEN'S WC (L-1007) 4 50 200 WC & FAUCET SENSOR 0.50 0.10

24 B8 32 4 4 CORE 3 ,CORRIDOR(L300) 2 2 200, 400 1200 RING 0.50 0.60

FCU-LG-136 (REVISED AS PER TRA-SPE-TEC-AC-


25 R9 20 4 4 LOST & FOUND STORAGE (L-1009) 1 253 253 0.90 0.23
GEN-00030-00)
40A,4P, FCU-LG-122 (REVISED AS PER TRA-SPE-TEC-AC-
26 Y9 20 4 4 ENGINEER WORKSHOP (L-1001) 1 989 989 0.90 0.89
100mA GEN-00030-00)
FCU-LG-09 (REVISED AS PER TRA-SPE-TEC-AC-
27 B9 20 4 4 ELEVATOR LOBBY (L301) 1 713 713 0.90 0.64
GEN-00030-00)

28 R10 SPACE

40A,4P, 29 Y10 20 4 4 PARKING X41-X42,Y1-Y2 1 300 300 TEF-LG-13 0.90 0.27


100mA
FCU-LG-10 (REVISED AS PER TRA-SPE-TEC-AC-
30 B10 20 4 4 ELEVATOR LOBBY (L301) 1 713 713 0.90 0.64
GEN-00030-00)
FOR ELECTRONIC FAUCET, TOILET FLUSHER
31 R11 20 4 4 FEMALE CHANGE ROOM (L-1401) 12 100 1200 0.50 0.60
AND URINAL
FOR ELECTRONIC FAUCET, TOILET FLUSHER
32 Y11 20 4 4 MALE CHANGE ROOM (L-1402) 10 100 1000 0.50 0.50
AND URINAL
HOTEL PARKING, LOST &
40A,4P, 33 B11 20 4 4 4 200 800 0.50 0.40
FOUND STORAGE (L-1009)
30mA RING (REVISED AS PER-TRA-SPE-SDG-PS-L00-
34 R12 32 2X4 2X4 WATER QUALITY OFFICE (L-0979) 3 400 1200 0.50 0.60
00009-06)
35 Y12 20 4 4 ENGINEER WORKSHOP (L-1001) 4 200 800 0.50 0.40

36 B12 20 4 4 FISH HUSBANDRY-L-0908 4 200 800 0.50 0.40

37 R13 32 2X4 2X4 WATER QUALITY OFFICE (L-0979) 3 400 1200 REVISED AS PER-TRA-SPE-SDG-PS-L00-00009-06 0.50 0.60

38 Y13 20 4 4 FEMALE CHANGE RM (L-1401) 2 200 400 0.50 0.20

40A,4P, 39 B13 20 4 4 FEMALE W.C (L-0909) 4 100 400 0.50 0.20


30mA
40 R14 20 4 4 FEMALE W.C (L-0910) 4 100 400 0.50 0.20

41 Y14 20 4 4 WOMEN'S WC (L-1006) 4 100 500 WC & FAUCET SENSOR (RFI 14364) 0.50 0.25

42 B14 20 4 4 HOTEL PARKING 5 200 1000 0.50 0.50

43 R15 333 0.50 0.17


COURTYARD WATER FEATURE (TRA-LTR-TCI-DEC-
40A,4P,
44 Y15 20A TP 4 4 PRAYER ROOM COURTYARD 1000 333 0533 - Prayer Room Courtyard MEP (EIP-0593) 0.50 0.17
100mA
Updated Drawings - IFC Submission)
45 B15 333 0.50 0.17

46 R16 20 4 4 WATER QUALITY OFFICE (L-0979) 1 2 200, 400 1000 REVISED AS PER-TRA-SPE-SDG-PS-L00-00009-06 0.50 0.50

40A,4P, CORRIDOR(L-0913),WATER QUALITY STORE(L- RING (REVISED AS PER-TRA-SPE-SDG-PS-L00-


47 Y16 32 2X4 2X4 6 200 1200 0.50 0.60
30mA 0980) 00009-06)

48 B16 20 SPARE 200 (AS PER ID) 0.50 0.10

TOTAL LOAD PER PHASE 10220 8815 10416 0.65 19.21


NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket Outlet _ W/H - Water
Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C TOTAL CONNECTED LOAD (TCL): 29.45 KW
Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 29.45
AMPS : 47.24 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 45


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES LOAD DISTRIBUTION SCHEDULE
DB REF : RETAIL L1408 JOB REF.:
INCOMING CABLE SIZE : 1X4C 16mm2,Cu/XLPE/SWA/LSF + 1X1C 16mm2, Cu/G/Y/LSF, ECC.
LOCATION : RETAIL L1408 MAIN INCOMER : 40A ISOLATOR FED FROM : SMDB-H3-LG01
CONNECTED LOADS/POINTS LOAD PER CKT (W)
CKT ECC

NEON LTG.
RATING RATING MCB

FCU / VAV
LIGHTING

13A T.S/O
SR. CKT WIRE WIRE UNIT DEMAND DEMAND

EX. FAN

13A S/O
SH. S/O

TP S/O

W A/C

S A/C
OF OF RTG IN ROOM / AREA REMARKS

MISC
SCH

W/H

D/W
NO. NO. SIZE SIZE WATTS FACTOR LOAD(KW)

SB
INCOMER ELCB Amp. R Y B
mm² mm²

1 R1 16 SPARE 250 250 1.00 0.25

2 Y1 16 SPARE 250 250 1.00 0.25

3 B1 16 SPARE 250 250 1.00 0.25


40A,4P,
100mA
4 R2 16 SPARE 250 250 1.00 0.25

5 Y2 16 SPARE 250 250 1.00 0.25

6 B2 16 SPARE 250 250 1.00 0.25

7 R3 16 SPARE 250 250 1.00 0.25

8 Y3 16 SPARE 250 250 1.00 0.25

9 B3 16 SPARE 250 250 1.00 0.25


40A,4P,
100mA
10 R4 16 SPARE 250 250 1.00 0.25

11 Y4 16 SPARE 250 250 1.00 0.25

12 B4 16 SPARE 250 250 1.00 0.25


40A,TP, ISOLATOR

13 R5 20 SPARE 500 500 0.90 0.45

40A,4P,
14 Y5 20 SPARE 500 500 0.90 0.45
100mA

15 B5 20 SPARE 500 500 0.90 0.45

16 R6 20 SPARE 1000 1000 0.90 0.90

17 Y6 20 SPARE 1000 1000 0.90 0.90

18 B6 20 SPARE 1000 1000 0.90 0.90


40A,4P,
30mA
19 R7 20 SPARE 1000 1000 0.90 0.90

20 Y7 20 SPARE 1000 1000 0.90 0.90

21 B7 20 SPARE 1000 1000 0.90 0.90

22 R11 20 SPARE 750 750 0.50 0.38

23 Y11 20 SPARE 750 750 0.50 0.38

24 B11 20 SPARE 750 750 0.50 0.38


40A,4P,
30mA
25 R12 20 SPARE 750 750 0.50 0.38

26 Y12 20 SPARE 750 750 0.50 0.38

27 B12 20 SPARE 750 750 0.50 0.38

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver TOTAL LOAD PER PHASE 5000 5000 5000 0.80 12.00
Socket Outlet _ W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker
Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ Misc- Miscllenaous _TP S/O_ TOTAL CONNECTED LOAD (TCL): 15.00 KW
TOTAL LOAD (KW) 15.00
Three Phase Socket AMPS : 24.06 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 46


DETAILS OF CONNECTED LOAD/MAXIMUM DEMAND

AREA: Dubai UAE


PROJECT : THE ROYAL ATLANTIS RESORT AND RESIDENCES CLIENT : KERZNER INTERNATIONAL
PLOT: PJCRC 19-27C

SMDB REF: SMDB-H3-2401-HK


CONSULTANT: DEC/WSP LOCATION : CORE 3 PLANTROOM L24
SMDB CONNECTED TO: SMDB-H3-2201
CIRCUIT/ SP/ RATING - AMPS FAULT PVC/ CABLE SIZE ECC LENGTH OF CONNECTED LOAD IN kW TOTAL MAX. PROBE TYPE & NO OF kWh METERS
FEEDER/ TP ACB MCCB ISO/ DUTY XLPE/ 2/4 x 1C 2/3/4C SIZE CABLE R-PHASE Y-PHASE B-PHASE CONNECTED DEMAND 1 PHASE LV/HV CT REMARKS
3 PHASE
DB NO. MCCB kA SWA/LSF mm2 mm2 mm2 (Mtrs) kW kW kW LOAD(TCL) LOAD (MDL) (1)
(2)
(3)
N/A KW KW
INCOMER TP 200 XLPE/LSF/SWA/LSF/CU 4C 300 1C 150 120
OUT GOING:

MAHU-HK-24-01 TP 40 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 40 5.17 5.17 5.17 15.50 13.95 ELCB PROVIDED IN CP

AHU-HK-24-01 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 50 1C 25 38 10.00 10.00 10.00 30.00 27.00 ELCB PROVIDED IN CP

FAHU-HK-24-01 TP 32 35 XLPE/LSF/SWA/LSF/CU 4C 16 1C 16 40 2.50 2.50 2.50 7.50 6.75 ELCB PROVIDED IN CP

EF-HK-24-01 TP 20 35 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 36 0.25 0.25 0.25 0.75 0.68 ELCB PROVIDED IN CP

EF-HK-24-02 TP 20 35 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 39 0.25 0.25 0.25 0.75 0.68 ELCB PROVIDED IN CP

EF-HK-24-03 TP 20 35 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 36 1.00 1.00 1.00 3.00 2.70 ELCB PROVIDED IN CP

DWEF-HK-24-01 TP 20 35 XLPE/LSF/SWA/LSF/CU 4C 6 1C 6 54 0.37 0.37 0.37 1.10 0.99 ELCB PROVIDED IN CP

DB-H3-2401-01 TP 63 35 XLPE/LSF/SWA/LSF/CU 4C 25 1C 16 10 9.51 8.85 7.91 26.27 10.34 AS PER RFI 12096

TOTAL CONNECTED LOAD PER PHASE 29.04 28.38 27.45 84.87 63.08
MAXIMUM DEMAND [3PH] @ D.F 0.74 = 63.08kW TOTAL CONNECTED LOAD [3 PH] 84.87 kW
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]

DATE: 15-Aug-22

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 47


PROJECT : THE ROYAL ATLANTIS RESORT AND LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-2401-01 JOB REF.:
INCOMING CABLE SIZE : 1X4C 25 mm2 CU / XLPE/SWA/LSF+ 1X 1C 16mm2, CU/G/Y/LSF ECC
LOCATION : L24 CORE3 PLANTROOM MAIN INCOMER : 80A,TP, ISOLATOR FED FROM : SMDB-H3-2401-HK
RATING CONNECTED LOADS/POINTS LOAD PER CKT (W) DEMAN DEMAN
RATING MCB CKT ECC

LIGHTIN

EX. FAN

13A S/O
SH. S/O
OF CKT UNIT D D

OUTLE

W A/C
NEON

S A/C
SPUR
T.S/O

MISC
WIRE WIRE

LTG.
OF SR. NO. RTG IN ROOM / AREA REMARKS

SCH

FCU
W/H

D/W
13A

SB
INCOM NO. WATTS FACTO LOAD(K

G
R Y B

T
ELCB Amp. SIZE mm² SIZE mm²
ER R W)
1 R1 800 0.45 0.36
40A,4P,
2 Y1 20A TP 4.0 4.0 L24 CORE PLANTROOM 2400 800 CCPH-1A (DUTY+STANDBY) 0.45 0.36
100mA
3 B1 800 0.45 0.36

4 R2 20 4.0 4.0 L24 CORE PLANTROOM 4 200 800 0.90 0.72


40A,4P,
5 Y2 20 4.0 4.0 ELEVATOR MECH. RM(23301), MEP ROOM(23303) 2 200 400 0.90 0.36
30mA

6 B2 SPACE 0.90 0.00

7 R3 16 2.5 2.5 L24 PLANTROOM 7 52 364 LIGHT TYPE B1 0.90 0.33

8 Y3 16 2.5 2.5 L24 PLANTROOM 5 52 260 LIGHT TYPE B1 0.90 0.23

9 B3 16 2.5 2.5 L24 CORE 3 AREA, ELEVATOR MECH. RM(23301,23302) 8 52 416 LIGHT TYPE B1 0.90 0.37
40A,4P,
100mA
10 R4 16 2.5 2.5 L24 PLANTROOM 8 52 416 LIGHT TYPE B1 0.90 0.37

11 Y4 16 2.5 2.5 L24 PLANTROOM 5 52 260 LIGHT TYPE B1 0.90 0.23

12 B4 16 2.5 2.5 L24 CORE 3 AREA, ELEVATOR MECH. RM(23301,23302) 8 52 416 LIGHT TYPE B1 0.90 0.37

13 R5 20 4.0 4.0 L24 PLANTROOM 1 713 713 FCU-H-24-PH03 0.90 0.64


40A,4P,
14 Y5 20 4.0 4.0 L24 PLANTROOM 1 713 713 FCU-H-24-PH01 0.90 0.64
100mA
80A,TP, ISOLATOR

15 B5 20 4.0 4.0 L24 PLANTROOM 1 713 713 FCU-H-24-PH02 0.90 0.64

16 R6 20 4.0 4.0 L24 PLANTROOM 1 713 713 FCU-H-24-PH04 0.90 0.64

40A,4P, 17 Y6 20 4.0 4.0 L24 PLANTROOM 7 50 350 MOTORISED DAMPERS 0.90 0.32
100mA
FCU-H-24-HKPR-01 (AS PER RFI
18 B6 20 4.0 4.0 L24 PLANTROOM ####### 1 300 300 0.90 0.27
14500)

19 R7 1000 0.9 0.45


40A,4P,
20 Y7 20A TP 4 4 L24 PLANTROOM 1.0 3000.0 1000 FOR HP-1A-ECP-01 0.9 0.45
100mA
21 B7 1000 0.9 0.45

22 R8 500 0.9 0.23


40A,4P,
23 Y8 20A TP 4 4 L24 PLANTROOM 1.0 1500.0 500 FOR HP-1B-ECP -01 0.9 0.23
100mA
24 B8 500 0.9 0.23

25 R9 20 SPARE 200 0.90 0.09


40A,4P,
26 Y9 20 SPARE 200 0.90 0.09
100mA
27 B9 20 SPARE 200 0.90 0.09

FCU-H-24-HKPR-01 (AS PER RFI


28 R10 20 4 4 L24 PLANTROOM 1 300 300 0.90 0.27
14500)

40A,4P, FCU-H-24-HKPR-02 (AS PER RFI


29 Y10 20 4 4 L24 PLANTROOM 1 300 300 0.90 0.27
100mA 14500)

FCU-H-24-HKPR-03 (AS PER RFI


30 B10 20 4 4 L24 PLANTROOM 1 300 300 0.90 0.27
14500)

31 R11 3700

32 Y11 32 10 10 DB-H3-2401-01A 4067

33 B11 3267

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - Shaver Socket TOTAL LOAD PER PHASE 9506 8850 7912 0.39 10.34
Outlet _ W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _ CCU - Cooker Control Unit _
TOTAL CONNECTED LOAD (TCL): 26.27 KW
W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- Miscellaneous TOTAL LOAD (KW) 26.27
AMPS : 42.13 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 48


PROJECT : THE ROYAL ATLANTIS RESORT AND LOAD DISTRIBUTION SCHEDULE
DB REF : DB-H3-2401-01A JOB REF.:
INCOMING CABLE SIZE : 1X4C 10 mm2 CU / XLPE/SWA/LSF+ 1X 1C 10mm2, CU/G/Y/LSF ECC
LOCATION : L24 CORE3 PLANTROOM MAIN INCOMER : 40A,TP, ISOLATOR FED FROM : DB-H3-2401-01
RATING CONNECTED LOADS/POINTS LOAD PER CKT (W) DEMAN DEMAN
RATING MCB ECC

EX. FAN

13A S/O
SH. S/O
OF CKT CKT WIRE UNIT D D

OUTLE
LIGHTI

W A/C

S A/C
NEON

SPUR
T.S/O

MISC
WIRE

LTG.
OF SR. NO. RTG IN ROOM / AREA REMARKS

SCH

FCU
W/H

D/W
13A
NG

SB
INCOM NO. SIZE mm² WATTS R Y B FACTO LOAD(K

T
ELCB Amp. SIZE mm²
ER R W)
1 R1

MASTER CONTROL PANEL (Heat Pump for


2 Y1 20 4 4 L24 PLANTROOM 1 200 200 0.90 0.18
Swimming Pool )

MASTER CONTROL PANEL (HEAT


3 B1 20 4 4 L24 PLANTROOM 1 200 200 0.90 0.18
40A,4P, PUMP1B)
30mA
4 R2 SPACE

5 Y2 SPACE

MASTER CONTROL PANEL (HEAT PUMP


6 B2 20 4.0 4.0 L24 PLANTROOM 200 0.90 0.18
1A )
7 R3

8 Y3 16 2.5 2.5 FAÇADE LIGHTING - BALCONY 20 18 367 XL-22 (RFI 18562) 0.90 0.33
40A,TP, ISOLATOR

40A,4P, 9 B3 16 2.5 2.5 FAÇADE LIGHTING - BALCONY 20 18 367 XL-22 (RFI 18562) 0.90 0.33
100mA
10 R4 20 SPARE 200

11 Y4

12 B4

13 R5 500 0.90 0.45


PRESSURIZATION UNIT(SWIMMING POOL
40A,4P,
14 Y5 20A TP SPARE 500 HEAT PUMP) RELOCATED AT L42 AS PER 0.90 0.45
100mA
FCN 05384 & 05464
15 B5 500 0.90 0.45
PRESSURIZATION UNIT(ZONE 1A)(1
16 R6 32 6 6 L24 PLANTROOM 3000 3000 0.90 2.70
DUTY+1 STAND BY)
PRESSURIZATION UNIT(ZONE 1B)(1
17 Y6 32 6 6 L24 PLANTROOM 3000 3000 0.90 2.70
DUTY+1 STAND BY)
40A,4P,
100mA 18 B6 20 SPARE 1000 0.90 0.90

19 R7 0.90 0.00

20 Y7 0.90 0.00

21 B7 20 SPARE 1000 0.90 0.90

NEON LTG -Neon Linghting _ EX.FAN - Exhaust Fan _SCH-Schadlier_ S/O - Socket Outlet _ SH. S/O - TOTAL LOAD PER PHASE 3700 4067 3267 0.88 9.75
Shaver Socket Outlet _ W/H - Water Heater _ SB- Sign Board _ D/W - Dish Washer _ FCU - Fan Coil Unit _
CCU - Cooker Control Unit _ W A/C- Window Type AC _ S -A/C Split Type A/C_ ISO- Isolator_ MISC- TOTAL CONNECTED LOAD (TCL): 11.03 KW
Miscellaneous TOTAL LOAD (KW) 11.03
AMPS : 17.70 A

TRA-SBJ-TEC-EL-GEN-00183 (MDB-H-2) Page 49