18.1 General
The draw bars for the main boom extension must be checked
at least once a year by a ”Sachkundiger” (specialist) (in ac-
cordance with the German accident prevention regulations
for load suspension devices in load handling operation
(VBG 9). If necessary, depending on the operating condi-
tions and the applications for which they are used, the draw
bars should be additionally inspected by a specialist be-
tween these prescribed checks.
The inspection intervals generally depend on the operating
conditions and the applications for which the equipment is
used. This means that if the equipment is used more often,
the inspection intervals should be shortened accordingly.
Ensure that the tubing on the lattice mast sections has not
been damaged. If damaged tubing is discovered during
visual inspections, further operation of the main boom ex-
tension is prohibited.
665--1180--038_en 1/93
18
7 17
Z 31 319
Z 31 364
2/93 665--1180--038_en
Main Boom Extension 18
18.2 Components
(Z 31 319, Z 31 364)
The lattice mast point (7) is also used in certain boom lengths for
the luffing and fixed fly jib. This is described in Sections 19 and
20 respectively.
665--1180--038_en 3/93
18
4
2
4
Z 31 820 Z 35 824
10
8
12 Z 32 806 Z 31 323
4/93 665--1180--038_en
Main Boom Extension 18
The following conditions must be met before the main boom ex-
tension can be fitted:
(Z 31 820)
The catch on the adapter must be folded in the horizontal posi-
tion.
(Z 35 824)
The pins of the 3 locking cylinders (2) and (4) on the adapter must
be retracted.
(Z 32 806)
Bring both three--way directional control valves (12) on the base
section of the main boom into the position shown. This position
is marked II. Especially pay attention that the marker notches at
the square are positioned correctly.
(Z 31 323)
Both draw bars (10) on the adapter must be in the position shown
(0°angle to the main boom, with pin ”8” fastened).
665--1180--038_en 5/93
18
Z 31 829
”A”
”B”
Z 32 807
6/93 665--1180--038_en
Main Boom Extension 18
18.3.2 Fitting
(Z 32 807)
1. Attach the lattice mast point to the fixing points (”A”) provided
on the auxiliary crane, raise the mast and set it down on the
ground.
2.1 Attach the adapter (weight approx. 400 kg) to the auxil-
iary crane and position it so that the holes of the
adapter draw bars line up with the upper holes on the
lattice mast point and the respective lower holes.
(Z 31 829)
2.2 Using four pins connect lattice mast point with adapter.
Guard the pins with the corresponding pin locks.
665--1180--038_en 7/93
18
Z 31 348
”A”
”B”
Z 32 807
8/93 665--1180--038_en
Main Boom Extension 18
(Z 32 807)
3. Attach the main boom extension to the designated fixing
points (”B”) on the auxiliary crane.
(Z 31 348)
5. Connect up the hydraulics and electrics.
665--1180--038_en 9/93
18
4 4 2
Z 29 181 Z 32 894
11
12
4
11
Z 31 356
10/93 665--1180--038_en
Main Boom Extension 18
(Z 29 181, Z 32 894)
8. When the pin locking holes on the main boom head and on
the adapter of the main boom extension are aligned and the
catch of the adapter on the main boom head has locked into
place, move selector switch (8) on the mobile control panel
to position ”4”. Press self--return rocker switch (9) upwards
until both locking cylinders (4) are fully extended.
(Z 31 356)
9. When both locking cylinders (4) are fully extended, they are
guarded automatically by spring--loaded catch (11) engag-
ing.
665--1180--038_en 11/93
18
Z 31 348
12/93 665--1180--038_en
Main Boom Extension 18
(Z 31 348)
12. Release the quick coupling for both hydraulic connections
(when depressurised) and the electrical connection on the
main boom head.
13. Disconnect the auxiliary crane from the main boom exten-
sion.
665--1180--038_en 13/93
18
4 4 2
Z 32 894
14/93 665--1180--038_en
Main Boom Extension 18
18.3.3 Removal
(Z 32 894)
If the main boom extension has been folded into transport posi-
tion and cannot -- for lack of space -- be folded into the operating
position, you can proceed as follows for this exceptional situa-
tion.
Swing the main boom extension out of the transport position so
far that swing cylinder (2) can be pinned to the head of the main
boom.
Proceed as described in Sect. 18.4.1 “Before folding”, page 21,
and Sect. 18.4.2 “Folding out of Transport Position into Operating
Position“ up to and including point 12., pages 23 -- 31..
The main boom extension is then hooked up to the auxiliary
crane and the swing cylinder (2) unpinned analogously to the re-
moval of the main boom extension from the operating position.
665--1180--038_en 15/93
18
”A”
”B”
Z 32 807
16/93 665--1180--038_en
Main Boom Extension 18
(Z 32 807)
Before unlocking the main boom extension on the main
boom head, it must be ensured that the auxiliary crane is
properly attached at the centre of gravity of the main boom
extension (”B”).
After unlocking the main boom extension, it must not swing
to and fro or swing away from the crane.
Before removing the main boom extension using the auxil-
iary crane:
-- Disengage the two hydraulic hoses and the electrical
connection on the main boom head.
-- disconnect the mobile control panel from the distribution
box.
665--1180--038_en 17/93
18
4 4 2
3
Z 32 894 Z 32 112
Z 36 725
18/93 665--1180--038_en
Main Boom Extension 18
(Z 32 894, Z 32 112)
For removing the main boom extension, swing cylinder (2) and
locking cylinder (3) must be retracted simultaneously. However,
for safety reasons, this is prevented from happening by electric
switchgear.
Therefore, when removing the main boom extension, the limit
switch for retracted locking cylinder (3) must be bridged, so that
the remaining swing cylinder (2) can also be retracted.
(Z 36 725)
This limit switch can then be bridged by pulling cable (2) of pull
switch (1). This pull switch (1) is located on the left--hand side of
the base section on the corresponding distribution box.
665--1180--038_en 19/93
18
10
8
12 Z 32 806 Z 31 323
Z 31 827
20/93 665--1180--038_en
Main Boom Extension 18
(Z 32 806)
∗ Both three--way directional control valves (12) on the base
section of the main boom in the position II shown.
(Z 31 323)
∗ Both draw bars (10) on the adapter must be in the position
shown (0° angle to the main boom, fastened using pin ”8”).
(Z 31 827)
∗ If the 5.8 t counterweight base plate is set down on the crane
chassis, the draw bar must be folded down in the transport
position.
665--1180--038_en 21/93
18
Z 31 348
22/93 665--1180--038_en
Main Boom Extension 18
(Z 31 348)
1. Connect the hydraulic and electric lines.
3. Start the engine for the superstructure and set the engine
speed to approx. 1000 to 1200 rpm.
665--1180--038_en 23/93
18
12 11
Z 31 826 Z 29 178
12
12
Z 31 824 Z 31 825
24/93 665--1180--038_en
Main Boom Extension 18
(Z 31 826, Z 29 178)
4. Extend cylinder (1) completely.
To do this move selector switch (8) on the mobile control
panel to position ”1”. Press self--return rocker switch ”9” up-
wards until the cylinder is fully extended.
(Z 31 824, Z 31 825)
5. Release the rail from the transport position (withdraw spring--
loaded pin ”12”), fold it out and guard it in the operating posi-
tion using pin (12).
665--1180--038_en 25/93
18
2 ”C”
12 11
”B”
13 1
Z 31 826
Z 31 330 Z 31 329
26/93 665--1180--038_en
Main Boom Extension 18
6. Check that all three locking cylinders (2) and (4) on the
adapter are completely retracted.
Before releasing the main boom extension from the rail, al-
ways ensure that at pivotal point ”B”, the main boom and
main boom extension are correctly pin locked together and
guarded.
(Z 31 826)
7. Release the main boom extension from cylinder (1).
To do this release clip pin (11), then move lever (12) first up-
wards and then to the right.
The locking mechanism is then in position unlocked. Re--
mount the clip pin to the same place as it had been before.
(Z 31 329, Z 31 330)
9. Fold the main boom extension at pivotal point ”B” by pulling
on the rope, until the stop (Z 31 329) is lying flat against the
main boom head and the pins of swing cylinder (2) are flush
with the outer holes on the brackets on the main boom head
(”C”).
665--1180--038_en 27/93
18
Z 31 331
Z 31 332 Z 31 820
28/93 665--1180--038_en
Main Boom Extension 18
(Z 31 331, Z 31 332)
10. Pin lock main boom extension to main boom head.
To do this, move selector switch (8) on the mobile control
panel to position ”2”. Press self--return rocker switch ”9” up-
wards until locking cylinder ”2” is fully extended.
A limit switch on the upper pin locking point monitors the
completion of the pin locking procedure.
The main boom extension may only be disconnected from
the base section of the main boom (via locking cylinder ”3”)
when this limit switch has been tripped.
(Z 31 820)
11. Move the catch on the adapter to horizontal position.
665--1180--038_en 29/93
18
2 ”C”
”B”
3
3
1
Z 31 355
Z 31 330 Z 31 348
30/93 665--1180--038_en
Main Boom Extension 18
(Z 31 330)
13. On the rope (provided by the customer), which was fastened
earlier, slew the main boom extension from locking cylinder
(2) at point ””C”” into the operating position, until the catch on
the main boom head locks into place.
665--1180--038_en 31/93
18
4 4 2
Z 32 894
Z 29 181 Z 31 348
32/93 665--1180--038_en
Main Boom Extension 18
(Z 32 894, Z 29 181)
14. Pin lock the main boom extension on the main boom head
in the operating position.
To do this move selector switch (8) on the mobile control
panel to position ”4” and press self--return rocker switch (9)
upwards until both pins of the locking cylinders (4) are ex-
tended to the limit.
(Z 31 348)
15. Attach the rope to its bracket again. It must not be hanging
down loose.
665--1180--038_en 33/93
18
11
12
4
11
Z 31 356
34/93 665--1180--038_en
Main Boom Extension 18
(Z 31 356)
16. When both locking cylinders (4) are completely extended,
they are guarded automatically by flicking the spring--loaded
catch (11).
665--1180--038_en 35/93
18
12
Z 31 348 Z 31 824
19
21
19 20
21 20
Z 34 312 Z 34 313
36/93 665--1180--038_en
Main Boom Extension 18
(Z 31 348)
18. Release the quick coupling for both hydraulic connections
(when depressurised) and the electrical connection on the
main boom head.
(Z 31 824)
19. Disguard rail, fold it in the transport position and guard.
(Z 34 312, Z 34 313)
20. Release the deflection roller (19) on the base of the main
boom extension from the transport position (Z 34 313).
To do this, disguard and withdraw pin (20), lift up the deflec-
tion roller around pin (21) -- use handle --, pin and guard it
again in the operating position (Z 34 312) using pin (20).
665--1180--038_en 37/93
18
19
Z 31 823 Z 31 336
Z 33 473
38/93 665--1180--038_en
Main Boom Extension 18
(Z 31 823)
21. Release the shift weight for the hoist limit switch on the head
of the main boom extension from the transport position.
(Z 33 473)
22. Pin and guard the rotor of the anemometer to pipe (4) in the
head of the main boom extension.
(Z 31 336)
23. Feed the hoist rope via deflection roller (19) to the head of
the main boom extension and reeve the hook block or hook
suspension gear.
665--1180--038_en 39/93
18
Z 31 338
Z 29 165 Z 29 166
40/93 665--1180--038_en
Main Boom Extension 18
(Z 31 338)
∗ Pull the rope of the hoist limit switch down, then bend it back
parallel to the boom and hold in position¡.
∗ Slide the retainer from the left side with its slot over the rope
between the crimped stop and the switch ©. Then push it up-
wards against the guide of hoist limit switch¢.
∗ Pull the rope down again, inserting it into the slot of the re-
tainer, turn the flag of the retainer so that it can be seen easily
by the crane operator ¤ and then release £.
If the main boom is also equipped with a hoist rope when operat-
ing the crane with additional equipment such as the main boom
extension, the shift weight of the hoist limit switch must hang
freely on the main boom and the hoist limit switch may not be
bridged (see Sect. 10.4).
665--1180--038_en 41/93
18
Z 31 338
42/93 665--1180--038_en
Main Boom Extension 18
(Z 31 338)
24.2 Insert plug ”Q 5C” from cable ”M” of the distribution box
”X 570” in the head of the main boom extension, into
socket ”Q 5” of the distribution box ”X 550” on the main
boom head.
The shift weight of the hoist limit switch ”S2D” must hang free.
25. Set the load limit device in accordance with the actual config-
uration of the crane (see corresponding load tables).
A crane with main boom extension is depicted on the ECIS
display.
The crane is now ready for ”operation with main boom extension”.
665--1180--038_en 43/93
18
Z 31 320 Z 31 348
12
Z 31 850
44/93 665--1180--038_en
Main Boom Extension 18
(Z 31 320)
3. Lift up the catch on the adapter.
(Z 31 850)
4. Push lever (12) of the locking device downwards. This en-
sures that the locking device can later click into position on
the cylinder automatically.
(Z 31 348)
5. Connect up the hydraulic and electric lines.
7. Check now that the pin for locking cylinder (3) on the main
boom base section is completely retracted.
665--1180--038_en 45/93
18
11
12 4
11
Z 31 356 Z 31 348
4 4 2
Z 29 181 Z 32 894
46/93 665--1180--038_en
Main Boom Extension 18
(Z 31 356, Z 31 348)
9. Release rope (12) from the bracket (Z 31 348) and by pulling
this rope, draw back safety catch (11) for the locking cylin-
ders (4). The locking cylinders are now disguarded. The
safety catches (11) must be held in this position until the lock-
ing cylinders (4) -- see next point -- are retracted.
(Z 29 181)
10. Unlock the main boom extension from the operating position
on the main boom.
To do this move selector switch (8) on the mobile control
panel to position ”4” and press self--return rocker switch (9)
downwards, until both locking cylinders (4) are retracted.
665--1180--038_en 47/93
18
2 ”C”
”B”
Z 31 329
Z 31 330
48/93 665--1180--038_en
Main Boom Extension 18
(Z 31 330, Z 31 329)
11. Slew the main boom extension on the rope (provided by the
customer) around locking cylinder (2) at point ”C” to the
adapter stop on the main boom head. The main boom exten-
sion runs against the rail.
665--1180--038_en 49/93
18
2 ”C”
”B”
Z 31 330 Z 31 355
50/93 665--1180--038_en
Main Boom Extension 18
(Z 31 330, Z 31 355)
12. Pin lock the main boom extension at point ”B” on the base
section of the main boom by extending cylinder (3).
To do this move selector switch (8) on the mobile control
panel to position ”3”. Press self--return rocker switch (9) up-
wards, until cylinder (3) is fully extended.
A limit switch on the upper pin locking point monitors the comple-
tion of the pin locking procedure. Locking cylinder (2) may only
be retracted when this limit switch has tripped.
665--1180--038_en 51/93
18
2 ”C”
”B”
Z 31 332
12 11
13 1
Z 31 330 Z 31 826
52/93 665--1180--038_en
Main Boom Extension 18
(Z 31 330, Z 31 332)
14. Retract locking cylinder (2) at point ”C”.
To do this move selector switch (8) on the mobile control
panel to position ”2”. Press self--return rocker switch (9)
downwards, until locking cylinder (2) is fully retracted.
(Z 31 826)
15. Pull the main boom extension using the rope (provided by
the customer) on to the rail until the locking device slots auto-
matically into the groove of the fully extended cylinder (1).
Then guard lever (12) on the locking device in the transport
position, using clip pin (11).
665--1180--038_en 53/93
18
12
Z 31 824
54/93 665--1180--038_en
Main Boom Extension 18
(Z 31 824)
16. Disguard the rail, fold it into transport position and guard it
again.
When operating the main boom with the main boom exten-
sion folded alongside, the main boom extension must NOT
remain in this transport position.
See Sect. 18.4.4 ”Operating the Main Boom with the Main
Boom Extension Folded Alongside
665--1180--038_en 55/93
18
7 7
8 8
”B”
Z 33 411 Z 33 412
56/93 665--1180--038_en
Main Boom Extension 18
18.4.4 Operating the Main Boom with the Main Boom Exten-
sion Folded Alongside
(Z 33 411, Z 33 412)
The main boom can also be operated when the main boom ex-
tension is folded alongside.
In this case the loads stipulated in the load capacity tables are
smaller.
Proceed as follows:
665--1180--038_en 57/93
18
Z 31 348 12 Z 32 806
58/93 665--1180--038_en
Main Boom Extension 18
(Z 31 348)
∗ Leave the two hydraulic lines and the electric cable con-
nected to the main boom head.
(Z 32 806)
∗ Leave the 3--way directional control valves on the main
boom base section in the position II shown.
665--1180--038_en 59/93
18
Z 33 474
Z 31 342
60/93 665--1180--038_en
Main Boom Extension 18
Both the fitting of the main boom extension using the auxiliary
crane and folding the main boom extension may only be carried
out in 0° position.
This fixing point ”C” must only be used for adjusting the
angle.
The fixing point for when operating the crane is located be-
hind the top piece of the main boom extension.
665--1180--038_en 61/93
18
5 0° 9 0°
8
7
6
5 10 9
”A”
Z 31 344 Z 31 345
20° 20°
5 9
10
6 7 8
5 10 9
”A”
Z 31 346 Z 31 347
62/93 665--1180--038_en
Main Boom Extension 18
(Z 31 344, Z 31 345)
The draw bars (10) between lattice mast point (5) and adapter (9)
are at 0° position. They are fixed at 0° position to the lattice mast
point (5) with pin (6) and to the adapter (9) with pin (8). Pins (7)
are simply inserted but do not perform any function.
(Z 31 346, Z 31 347)
4. Carefully unwind the winch of hoist 1. The main boom exten-
sion tilts until draw bars (10) come to rest on pin (7).
5. Insert and guard pins (8) in the same place again. They now
have no function.
6. Relieve the hoist rope, release it from the fixing point and
reeve the hook block again.
665--1180--038_en 63/93
18
20° 20°
5 9
10
6 7 8
5 10 9
”A”
Z 31 346 Z 31 347
5 0° 9 0°
8
7
6
5 10 9
”A”
Z 31 344 Z 31 345
64/93 665--1180--038_en
Main Boom Extension 18
(Z 31 346, Z 31 347)
The draw bars (10) between lattice mast point (5) and adapter (9)
are at 20° position. They are fixed in this position with pin (6) to
the lattice mast point (5) and pin (7) to the adapter (9). Pins (8)
are simply inserted but have no function.
(Z 31 344, Z 31 345)
3. Reel in the winch of hoist 1 carefully. The main boom exten-
sion is raised until it can be locked in the 0° position using pin
(8).
4. Relieve the hoist rope, release it from the fixing point and
reeve the hook block again.
665--1180--038_en 65/93
18
66/93 665--1180--038_en
Main Boom Extension 18
18.6 Telescoping the Main Boom with the Main Boom Ex-
tension Attached
After fitting or folding the main boom extension into the operating
condition, the desired operating position can be reached as fol-
lows:
1. Bring the main boom into high position (82°) by extending the
luffing cylinder.
665--1180--038_en 67/93
18
68/93 665--1180--038_en
Main Boom Extension 18
The maximum main boom length with the maximum possible ex-
tension sequence 0%/0%/100%/100% must not exceed approx.
36 m. In this instance:
∗ telescopic section 4 is 100 % telescoped out and pin
locked.
∗ telescopic section 3 is 100 % telescoped out and pin
locked.
∗ telescopic section 2 must be fully telescoped in and pin
locked.
∗ telescopic section 1 must be fully telescoped in and pin
locked.
The reeved hook block must be set down on the ground before
the main boom is lowered.
665--1180--038_en 69/93
18
”B”
3
12
Z 31 824
Z 31 327 Z 31 823
70/93 665--1180--038_en
Main Boom Extension 18
For operating the Superlift with the main boom extension refer to
Sect. 30.7.4.1 ”Operating the Superlift with the Main Boom Ex-
tension”.
When driving the crane with the main boom extension folded into
the transport position (Z 31 327) the following applies:
-- Observe the permissible axle loads.
-- The main boom must not be telescoped when the main boom
extension is in this position.
-- Cylinder (1) must be guarded on the main boom extension
and fully extended.
-- Locking cylinder (3) at point ”B” must be completely ex-
tended.
(Z 31 824)
− The rail (12) must be folded into the transport position and
guarded.
(Z 31 823)
− The shift weight of the hoist limit switch must be locked in the
top piece of the main boom extension.
665--1180--038_en 71/93
18
19
21
19 20
21 20
Z 34 312 Z 34 313
Z 31 348
72/93 665--1180--038_en
Main Boom Extension 18
(Z 34 312, Z 34 313)
− The deflection roller (19) must be folded into transport posi-
tion, locked and guarded (Z 34 313).
(Z 31 348)
− The hydraulic connection via the quick disconnect couplings
and the electric connection between distribution box ”X564”
on the adapter and ”X510” on the base section, of the main
boom do not need to be disconnected.
665--1180--038_en 73/93
18
7 6 17
Z 32 168
74/93 665--1180--038_en
Main Boom Extension 18
18.9.1 General
18.9.2 Components
(Z 32 168)
665--1180--038_en 75/93
18
4
2
4
Z 35 824 Z 31 348
76/93 665--1180--038_en
Main Boom Extension 18
18.9.3.2 Fitting
(Z 35 824)
1. Attach the adapter (weight approx. 400 kg) to the auxiliary
crane, raise and position it so that the mountings above and
below pin locking cylinders (2) and (4) align with the mount-
ings on the main boom head.
(Z 31 348)
2. Connect up the hydraulics and electrics.
665--1180--038_en 77/93
18
4 4 2
Z 29 181 Z 32 894
11
12
4
11
Z 31 356
78/93 665--1180--038_en
Main Boom Extension 18
(Z 29 181)
4. Connect the mobile control panel at distribution box ”X 564”
(on the adapter), socket ”Q 560A”.
(Z 29 181, Z 32 894)
5. When the pin locking holes on the main boom head and on
the adapter of the main boom extension line up and the catch
of the adapter on the main boom head locks into place, move
selector switch (8) on the mobile control panel to position ”4”.
Press self--return rocker switch (9) upwards until both locking
cylinders (4) are fully extended.
(Z 31 356)
6. When both locking cylinders (4) are fully extended, they are
guarded automatically by spring--loaded catch (11) engag-
ing.
665--1180--038_en 79/93
18
Z 31 348 Z 32 171
Z 32 172
80/93 665--1180--038_en
Main Boom Extension 18
(Z 31 348)
9. Release the quick coupling for both hydraulic connections
(when depressurised) and the electric connection on the
main boom head.
(Z 32 171)
11. Attach guide sheave (3) to the support provided, lock using
2 pins and guard.
(Z 32 172)
12. Attach intermediate section 1207--5--11 (weight approx.
920 kg) at the fixing points provided on the auxiliary crane,
raise and fit it to the adapter.
To do this, position the intermediate section on the adapter
so that the bores of the adapter draw bars align with the up-
per bores on the intermediate section and the lower bores of
the fork ends. Then lock them with 4 double conical pins and
guard using 2 pin locks on each.
665--1180--038_en 81/93
18
Z 32 173
”A”
Z 32 823
82/93 665--1180--038_en
Main Boom Extension 18
(Z 32 823, Z 32 173)
14. Attach the lattice mast point (weight approx. 1350 kg) at the
fixing points (”A”) provided on the auxiliary crane, raise it and
pin it to the intermediate section using 4 pins. Guard the pins
using pin locks.
665--1180--038_en 83/93
18
19
7 6 17
Z 32 176
19
21
19 20
21 20
Z 34 313 Z 34 312
84/93 665--1180--038_en
Main Boom Extension 18
665--1180--038_en 85/93
18
Z 31 823
Z 33 473
86/93 665--1180--038_en
Main Boom Extension 18
(Z 31 823)
16. Release the shift weight of the hoist limit switch on the head
of the main boom extension out of transport position.
(Z 33 473)
17. Lock the rotor of the air speed indicator to pipe (4) in the head
of the main boom extension using pins, and guard the pins.
18. Reeve the hoist rope. Observe here the following specifica-
tions.
665--1180--038_en 87/93
18
0°
20 °
7 7
3 3
Z 32 170
88/93 665--1180--038_en
Main Boom Extension 18
(Z 32 170)
The hoist rope is fed from the hoist drum to the head of the main
boom extension as follows:
∗ Main boom extension at 0°position, operation without Su-
perlift -- rope is fed (broken line) from hoist (1) over deflection
roller (3) and deflection roller (7) to the head of the main boom
extension.
∗ Main boom extension at 0°position, operation with Superlift
-- rope is fed (dot--dash line) from hoist (1) over deflection
roller (5) on the superlift bracing support and deflection roller
(7) to the head of the main boom extension. Deflection roller
(3) must not be reeved.
∗ Main boom extension at 20°position, operation without Su-
perlift -- rope is fed (broken line) from hoist (1) over deflection
roller (3) and deflection roller (7) to the head of the main boom
extension.
∗ Main boom extension at 20°position, operation with Super-
lift -- rope is fed (dot--dash line) from hoist (1) over deflection
roller (5) on the Superlift bracing support, deflection roller (3)
and deflection roller (7) to the head of the main boom exten-
sion.
665--1180--038_en 89/93
18
4 4 2
3
Z 32 894 Z 32 112
Z 36 725
90/93 665--1180--038_en
Main Boom Extension 18
18.9.3.3 Removal
(Z 32 894, Z 32 112)
For removing the main boom extension, swing cylinder (2) and
locking cylinder (3) must be retracted simultaneously. However,
for safety reasons, this is prevented from happening by electric
switchgear.
Therefore, when removing the main boom extension, the limit
switch for the retracted locking cylinder (3) must be bridged, so
that swing cylinder (2), which remains extended, can also be re-
tracted.
(Z 36 725)
This limit switch can then be bridged by pulling cable (2) of pull
switch (1). This pull switch (1) is located on the left--hand side of
the base section on the corresponding distribution box.
665--1180--038_en 91/93
18
92/93 665--1180--038_en
Main Boom Extension 18
18.9.6 Telescoping the Main Boom with the Main Boom Ex-
tension Fitted
665--1180--038_en 93/93