You are on page 1of 1

US5/GMT/CAD/REC/15 PPR Washing Check List

9:12 AM
O.C. # 2120170552/1 ART# 35569-0299 Wash: DUBIOUS SHORT Date : 27-May-17 PPR QTY

Before forwarding the PPR to FID for BULK Decision tick the following:

1. Before Wash Balloon Air Pressure / Time apply for Scrapping Air Pressure: _____________ Time: _____________ minutes

2. Complete Wash Process on PPR Done Yes No Remarks: _________________________

3. PPR Wash on this temperature and time Temperature: _____________ centigrade Time: _____________ minutes

4. PPR Dry on this temperature and time Temperature: _____________ centigrade Time: _____________ minutes

6. Confirmation of Stonning against the receipe of this Wash Req. Not Req. Remarks: _________________________

7. Check Tone / Wash of the PPR with Approved Sample. Ok Not Ok Remarks: _________________________

8. Check Hand Feel of PPR with Approved Sample. Ok Not Ok Remarks: _________________________

9. Can these PPR proceeded for Bulk Cutting Decision Yes No, Re-trial Req. Remarks: _________________________

10. Pressing on Garment Required / Not Required. Required Not Required

11. Wrinkle on Seat Area Required / Not Required. Required Not Required

12. Wrinkle on Knee Area Required / Not Required. Required Not Required

13. Method of Wrinkle on PPS. Heat Gun Oven 3D Machine Press

14. Method of Wrinkle in Bulk. Heat Gun Oven 3D Machine Press

If wrinkles made with Oven:


15. PPR Dry and Cure on this temperature and time Temperature: _____________ centigrade Time: _____________ minutes

16. Scrapping / Mustaches/Destroy done as per Washing Recipe. Ok Not Ok

17. After Wash Balloon Air Pressure / Time apply for Spray Air Pressure: _____________ Time: _____________ minutes

Check By:- Verified By:-


(Assistant / Manager Production Washing) (Assistant / Manager Quality Washing)

You might also like