650--1080--027 1/13
8
15
”S68”
”S61.1”
Z 44 025 Z 44 026
61 ! 62
ROOF ROOF
”S45”
Z 42 771 Z 40 401
2/13 650--1080--027
Slewing the Superstructure 8
650--1080--027 3/13
8
> 100t
9,02 x 8,45 m
Z 40 402
10
117 118
Z 46 728 Z 40 404
4/13 650--1080--027
Slewing the Superstructure 8
650--1080--027 5/13
8
115
R1 R1
117 118
Z 46 729
6/13 650--1080--027
Slewing the Superstructure 8
When the indicator light in the luminous switch (115) lights up,
control lever (1) is used to control the auxiliary reeving winch.
650--1080--027 7/13
8
D 1
C
1
4.1
Z 40 406
Z 40 407
8/13 650--1080--027
Slewing the Superstructure 8
650--1080--027 9/13
8
”O”
117
Z 46 730
28
Z 40 409
10/13 650--1080--027
Slewing the Superstructure 8
Handle the slew gear and slew brake with care! Select
low slewing speeds! Brake carefully!
This especially applies for operation of the crane with the
main boom extension / fly jib or special local site condi-
tions.
By pressing knob (28) the pilot control behaviour of the slew gear
can be precisely adjusted.
650--1080--027 11/13
8
”S44.2”
”S92.1”
Z 40 410 Z 40 412
113
R1 R1
Z 46 731 Z 46 721
12/13 650--1080--027
Slewing the Superstructure 8
When a boom angle of 15° has been reached when lowering the
main boom, the sensor “S92.1” shuts down the crane movements
“lower luffing gear” and “rotate superstructure” (Z 40 410). By
pressing the button (113) the slew gear brake can be bridged. Re-
lease is confirmed by the lamp in the button lighting up (Z 46 731).
650--1080--027 13/13