RL Transfer 1
RL Transfer 1
Institute Of Engineering
Central Campus, Pulchowk
Department of Civil Engineering
Survey Instruction Committee
RL Transfer from TBM-4 to Minor Station, m 3
Correction
St. BS Stadia FS Stadia Stadia Cum. Corrected
Mean Mean Rise / Elevation Hz. Dist.
Interval, Interval, Interval Dist. RL Remarks
BS FS Fall (m) (m)
Top Mid Bot S₁ = T-B Top Mid Bot S₂ = T-B S=S₁+S₂ (m) (m)
Error, e = 0.002 m
−(Cummulative Distance)/(Total Distance) ∗error
Correction =
Sample Calculations:
Correction for TP-1 = −49.6/172.1∗0.002 =
-0.0006 m
Correction for m3 = −84.8/172.1∗0.002 =
-0.001 m
Error = 0.017 m
□(64&−
Correction(Setup
= No.)/(Total No. of Setup))∗error
Sample Calculations :
□(64&−
Correction for 1st Setup = 1/23)∗0.017=−0.0007391
□(64&−
Correction for 2nd Setup = 2/23)∗0.017=−0.001478261