Professional Documents
Culture Documents
204
287
712
REFERENCE AND STANDARDS
910
133
1393
287
152
416
706
530
C 207 207 C
NOTES:
1. DIMENSION, COORDINATES AND ELEVATIONS IN
MILLIMETERS, UNLESS OTHERWISE INDICATED.
2. THE AMOUNTS LISTED DO NOT INCLUDE MATERIAL LOSSES
PER CUT OR OVERMETAL FOR ADJUSTMENTS.
3. THE FIELD WELDING, ADJUSTMENTS AND PAINTING
REPAIRS ARE RESPONSIBILITY OF THE STEEL
FRONT VIEW SIDE VIEW STRUCTURE ERECTION COMPANY.
4. PIPING SUPPORT CONCRETE BASES MUST HAVE IT
LOCATION CONFIRMED BEFORE IT BE CONCRETED.
5. ALL SECONDARY PIPING SUPPORTS SHOULD BE IDENTIFIED
BY STAMP MARKING.
D 6. INFORMED PROFILES CUTTING ANGLES ARE GUIDELINES
D
AND MUST BE ADJUSTED DURING
THE SITE ERECTION.
2
6 6
6 6 2 6 6
6 6 6 6
6 6
1726
E E
569 566 591 CERTIFIED
6 3
6
REF. POINT
7 7
1
6 6 4 1 FIRST ISSUE JMR SBP MGB
REV. M/D/Y DESCRIPTION DRA CHD
6 6 5 5
CERTIFIED FOR CONSTRUCTION
F 6 6 F
1 1 Marcelo Subriabre Jaime Aranguiz
1
EMBEDDED_PLATE
Enrique Mancini Gonzalo Pezoa
PROJECT MANAGER DISCIPLINE LEADER
ELABORADO DATA
JMR 31/10/19
1 2 3 4 5 6 7 8 9 10 11 12
1:20
unset