Challenges of Using handling technologies is maximum
Electrical becoming common. achievable pump
size and rate. Submersible Pump The methods used, the 3. ESPs can handle (ESP) In High Free results and learning from free gas up to Gas Applications the application of ESPs approximately with various gas handling SUMMARY 20% volume technologies in real field fraction without Limitations of achieving data showed below. gas separation or full potential in pumped Present natural flow gas handling wells is the presence of conditions were equipment. excessive free gas at simulated-determine the pump intake. operating envelope for FIELD each well. APPLICATIONS Presence of free gas at pump intake affects : The operating envelopes Ratawi field, Kuwait for each selected well - Shrouds and XGC The pump were established over its gas handler- used to performance life cycle with various control gas negatively. free gas volumes and production. Several Reducing the water cuts. cases of “Gas Lock” liquid rates. were faced where the INTRODUCTION The pressure annulus (casing & added by the Artificial lift can tubing or tubing & pump. potentially improve the pump) were full of production performance gases. At this stage This performance the pump will be in the short to medium- reduction may sometimes operated without term by compensating for be quite severe: producing any fluid- the low reservoir energy In unstable pump levels, adding significant lead to over heat the operation. reserves in the long term motor as well as Significant by combating the pump. production losses. negative lift impact of The types of failures: Lower reliability. increasing water cuts. Increased I. Burnt cable/motor Electric Submersible operating costs- II. Stuck pumps. Pump (ESP): due to premature In this application, the equipment failure. 1. The size (pump shroud “Jacket” is outer diameter) of Some operators need to covering pump intake, the pump- the produce wells under seal section & motor. The maximum challenging operational production liquid is capacity of the conditions with very high directed from the ESP at a given free gas ratios. ESP in perforations downwards rotational speed. wells with a high free gas along the OD of the 2. The production liquid ratio that requires shroud and is further casing size the use of special gas routed to the pump intake determines the through the annular space between motor OD and shroud ID. The gas is accumulated in the annulus above the perforations, which should be vented through the casing valve. The result of this modification the mean time to failure of the pump on that Ratawi well was raised from 24 days to 371 days. The main purpose in the use of XGC gas handlers : To pressurize the gas back into solution. Produce it in the oil through the pump. In this application, this device was limited with GLR, that it was used adequately with a range of GOR from 500 to 1000 scf/bbl. As a result of this modification the mean time to failure of the pump on that well was raised from 65 days to 292 days (Mubarak et al. 2003).