You are on page 1of 3

TRAFFIC CENSUS

GOVERNMENT OF INDIA TRAFFIC CENSUS


TRANSPORT AND HIGHWAYS DEPARTMENT WEEKLY TRAFFIC SUMMARY
Survey Date NAME OF ROAD:- BHADEWAL BRIDGE TO MALOUD (ODR-06)
8/5/2019
Date Car, Jeep, Motor Cycle, Light Buses Two Axle Truck Multi Axle Agriculture Cycle, Rickshaw Bullock Cart, Total
Van, Three Scooter, Moped vehicles Tanker Truck Tractor Human Powered Horse Drawn
Wheelers Mini Truck Trolly Animal Powered

05.08.2019 to 06.08.2019 1181 1183 475 45 690 460 326 390 122 4871.058335

06.08.2019 to 07.08.2019 925 994 291 29 666 355 169 273 52 3752.872227

07.08.2019 to 08.08.2019 677 800 304 34 604 355 167 202 70 3213.317731

08.08.2019 to 09.08.2019 894 1294 434 38 389 189 209 231 92 3769.388051

09.08.2019 to 10.08.2019 1474 1482 411 23 483 229 264 380 103 4851.160431

10.08.2019 to 11.08.2019 1281 1365 338 25 460 227 253 328 108 4385.145037

11.08.2019 to 12.08.2019 987 1123 358 32 586 303 235 272 98 3993.415621

Total for week 7419.913605 8240.15608 2610.103 225.26062 3877.642795 2118.9084 1622.78188 2076.77327 644.818213 28836.357433

Av. Daily Traffic. 1060 1177 373 32 554 303 232 297 92 4119
PCU Factor 1.00 0.50 1.50 3.00 3.00 3.00 3.00 1.50 8.00
Av. Daily Traffic. PCU 1060 589 559 97 1662 908 695 445 737 6752
Average CVPD, A 1494
Design Life (yrs), N 5.00
Annual rate of increase of traffic, R 7.5%
Lateral Distribution Factor, F 75%
Vehicle Damage Factor, V
1.7 CVPD (0-150)
3.90
3.9 CVPD (150-1500)
5.0 CVPD (>1500)

MSA
13.37
=(365*1494*3.9*0.6289*0.75)/0.5

Sub Divisional Engineer, Executive Engineer,


Construction Division No.3,
PWD (B&R) Branch, Ludhiana.
TRAFFIC CENSUS
GOVERNMENT OF INDIA TRAFFIC CENSUS
TRANSPORT AND HIGHWAYS DEPARTMENT WEEKLY TRAFFIC SUMMARY
Survey Date
NAME OF ROAD:-PAYAL DHAMOT UPTO BHADEWAL BRIDGE (ODR-27)
Date Car, Jeep, Motor Cycle, Light Buses Two Axle Truck Multi Axle Agriculture Cycle, Rickshaw Bullock Cart, Total
Van, Three Scooter, Moped vehicles Tanker Truck Tractor Human Powered Horse Drawn
Wheelers Mini Truck Trolly Animal Powered

00.01.1900 to 01.01.1900 620 1233 252 130 223 36 193 612 80 3380

01.01.1900 to 02.01.1900 1078 1423 274 101 173 34 204 711 105 4103

02.01.1900 to 03.01.1900 653 1176 207 66 144 34 140 484 107 3011

03.01.1900 to 04.01.1900 634 1077 139 65 122 20 113 469 81 2719

04.01.1900 to 05.01.1900 1140 1604 146 59 96 16 119 494 74 3748

05.01.1900 to 06.01.1900 1078 1419 213 74 64 20 130 677 93 3766

06.01.1900 to 07.01.1900 900 1512 340 110 195 32 223 709 134 4155

Total for week 6103.66482 9444.292 1570.283 602.80792 1016.53882 192.27494 1121.2707 4157.073536 673.09264 24881

Av. Daily Traffic. 872 1349 224 86 145 27 160 594 96 3554
PCU Factor 1.00 0.50 1.50 3.00 3.00 3.00 3.00 1.50 8.00
Av. Daily Traffic. PCU 872 675 336 258 436 82 481 891 769 4800
Average CVPD, A 643
Design Life (yrs), N 5.00
Annual rate of increase of traffic, R 7.0%
Lateral Distribution Factor, F 75%
Vehicle Damage Factor, V
1.7 CVPD (0-150)
3.90
3.9 CVPD (150-1500)
5.0 CVPD (>1500)

MSA =(365*644*3.9*0.6289*0.75)/0.5 8.63


Sub Divisional Engineer, Executive Engineer,
Construction Division No.3,
PWD (B&R) Branch, Ludhiana.

You might also like