Professional Documents
Culture Documents
New documents
Withdrawn documents
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Civil in force TO-HQ-02-041-00 Philosophy for Structures and Foundations-Onshore E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/3/2005
Civil in force TO-HQ-02-042-00 Philosophy for Civil Works-Onshore E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/3/2005
Civil in force TO-HQ-02-043-00 Philosophy for Drainage Works-Onshore E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/3/2005
Civil in force EP CS 01 PH Philosophy for Access and Egress, Roads E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
7/2/2007
Civil in force RO-EP-FE-CS-STD-001-01-E Company standard regarding design, construction, E
maintenance and repair of oil field roads at crude oil and gas http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
production branches of S.C. OMV Petrom S.A. 6/1/2010
Civil in force RO-EP-FE-CS-STD-001-01-R Standard de companie pentru drumuri 6/1/2010 R
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/1/2012
Civil withdrawn PEP-O-PR-STD-001-01-E Well Area Design Standard E
6/1/2012
Electrical withdrawn EP FA EL 01 PH Philosophy for General Electrical Design
Replaced by Engineering
0001 (GTM Standard 009)
3/13/2013 E already in use
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Civil in force Engineering 0003 Annex Civil Structural Design Criteria on shore
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
3/12/2013 E Link electronically approved
Civil in force Engineering 0003- Civil Structural Design Criteria on shore
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
3/12/2013 E Link electronically approved
Civil in force PE-D-CS-REC-001-00-E Guidelines for elaboration of geotechnical documentations
is replacing EP-FA-CS-01-
SW-EN Scope of work -
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Geotechnical survey -
which was not applicable
10/14/2013 E Link to Contractors
Civil in force PE-D-CS-REC-001-00-R Ghid de intocmire a documentatiilor geotehnice
inlocuieste EP-FA-CS-01-
SW-RO - Caiet de Sarcini -
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Studiu geotehnic - care nu
10/14/2013 R Link se adresa contractorilor
Electrical in force EP FA EL 01 PR R Procedura de furnizare energie electrica din retelele PETROM
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
4/7/2009 R
Electrical in force EP FA EL 01 PR E Procedure for electric Power supply from PETROM network
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
4/7/2009 E
Electrical in force EP FA EL 02 PH Philosophy for Earthing and Bonding Protection
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
12/14/2009 E
Electrical in force EP FA EL 02 ST E PETROM Standard for Voltage Levels
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
7/1/2009 E
Electrical in force EP FA EL 02 ST R Standard PETROM pentru nivele de tensiune
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
7/1/2009 R
Electrical in force EP FA EL 03 PH Medium Voltage Electrical Philosophy
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
12/18/2009 E
Electrical in force EP FA EL 03 PR E Procedure for metering the electricity consumed by users from
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
OMV PETROM’s networks 2/1/2010 E
Electrical in force EP FA EL 03 PR R Procedura de masurare a energiei electrice consumate de
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
utilizatorii retelelor OMV Petrom 2/1/2010 R
Electrical in force EP FA EL 03 ST E Earth electrodes. Maximum values and intervals for checking
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
2/16/2010 E
Electrical in force EP FA EL 03 ST R Prize de pamant. Valori admise si intervale de inspectie
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
2/16/2010 R
Electrical in force EP FA EL 04 PH Philosophy for LV Switchgear
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
11/12/2009 E
Electrical in force EP FA EL 06 PH Philosophy for Lighting 11/12/2009 E http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Electrical in force RO-EP-FE-EL-PHL-001-01-E Philosophy for AC motors 4/1/2011 E https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Electrical in force RO-EP-FE-GE-PHL-001-02-E Philosophy for Selecting Heat and Power Equipment
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/1/2011 E
Electrical in force EP-MNT-RO-06-MSI-001-01-E Connecting of electrical cables in Petrom EP facilities
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
9/24/2009 E
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Electrical in force EP-MNT-RO-06-MSI-001-01-R Conectarea cablurilor electrice in instalatiile de productie
Petrom EP http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
9/24/2009 R
Electrical in force EP-MNT-RO-06-MSI-002-01-E Adoption of SR EN 60446 for colour coding of conductors
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
11/10/2009 E
Electrical in force EP-MNT-RO-06-MSI-002-01-R Adoptarea SREN 60446 codul culorilor conductoare 11/10/2009 R https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Electrical in force TO-HQ-02-012-00 Philosophy for Main Generators and Switchboard-Onshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/3/2005 E
Electrical in force TO-HQ-02-013-00 Philosophy for Emergency Generator and Switchboard-
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Onshore 6/3/2005 E
Electrical in force TO-HQ-02-014-00 Philosophy for Electrical Cabling Design-Onshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/3/2005 E
Electrical in force TO-HQ-02-015-00 Philosophy for Uninterruptible Power Supplies-Onshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/3/2005 E
Electrical in force TO-HQ-02-016-00 Philosophy for Earthing, Bonding and Lightning Protection-
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Onshore 6/3/2005 E
Electrical in force TO-HQ-02-017-00 Philosophy for Motors, Drives and Transformers-Onshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/3/2005 E
Electrical in force TO-HQ-02-018-00 Philosophy for Lighting and Trace Heating-Onshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/3/2005 E
Electrical in force RO-EP-EL-SPC-004-01-B Technical specification for high efficiency induction motors
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
(IE2,IE3) 12/20/2011 E,R
Electrical in force PE-M-SS-STD-018-01-E Electrical Cables Standardization
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
1/15/2012 E
Electrical in force PE-M-SS-STD-018-01-R Standardizarea Cablurilor Electrice
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
1/15/2012 R
Electrical withdrawn TO-HQ-02-011-00 Philosophy for Electrical Design-Onshore 10/2/2012 E
Electrical in force Engineering 0001 Standard for General Electrical Design Onshore 10.09.2012 E It was renamed on REAL*
platform the standard GT-
M 009 Standard for
General Electrical Design
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Onshore (already in use)
starting with 01.02.2013
General in force GT-M-001 OMV Capital Project Management Directive 4/8/2011 E http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
General in force DIR FIN 006 E Capital Project Management
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
2/1/2013 E
General in force DIR FIN 006 R Managementul Proiectelor de Capital
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
2/1/2013 R
General in force E-A.6-001 Opportunity Maturation and Project Delivery Process November 2011 E https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
General in force GT-M Standard 001 Independent gate review and execution progress review for
capital projecys http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
10/1/2011 E
General in force E-C.2.1-001 Hydrocarbon Development Planning
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
12/12/2011 E
General in force E-C.2.1-002 Guideline Field (Re-)Development Plan
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
12/9/2011 E
General in force EPP-HQ-05-GL-005-07 Project Management Guideline
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
4/16/2009 E
General in force EPP-HQ-02-GL-001 Design Quality Assurance in Projects
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
7/17/2009 E
General withdrawn EC-E001 Economics Guideline replaced by E.2.7-HQ-
8/1/2013 E STD-001-00
General in force E.2.7-HQ-STD-001-00 E&P Economics Standard
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
8/1/2013 E
General in force PE-M-GE-STD-002-00 Management of Audit Activities Standard
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
7/1/2013 E
General in force EP-HQ-010 Deviation from the Requirements of Technical Standards
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
2/15/2010 E
General in force EPP-HQ-04-GL-001-00 Condition Assessment Guideline
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
2/3/2011 E
General in force EPP-HQ-05-MAN-001-00 Quality Management Manual for Projects
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
9/14/2009 E
General in force EP FA AD 02 GL Guideline for the use of standards
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
3/1/2010 E
General in force EP FA AD 03 PR Design Review Procedure
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
5/30/2010 E
General in force RO-EP-EN-GDL-001-01-E Energetic component of greenhouse gases emissions
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
May 2010 E
General in force RO-EP-GE-GDL-001-01-E Guideline for CE marking
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
10/1/2010 E
General in force RO-EP-GE-GDL-001-01-R Ghid pentru marcarea CE
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
10/1/2010 R
General withdrawn RO-EP-FE-AD-PRO-003-02-E CTE Procedure
New version is not
E applicable to Contractors
General withdrawn RO-EP-FE-AD-PRO-003-02-R Procedura CTE
New version is not
R applicable to Contractors
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
General in force RO-EP-GE-STD-001-01-E Software design list
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
11/1/2011 E
General withdrawn EP-MNT-RO-06-PRO-010-02.01-E Equipment numbering procedure
replaced by PE-O-MT-
5/1/2013 E PRO-007-02-E
General withdrawn EP-MNT-RO-06-PRO-010-02.01-R Procedura pentru numerotarea echipamentelor
replaced by PE-O-MT-
5/1/2013 R PRO-007-02-R
General in force PE-O-MT-PRO-007-02-E Equipment numbering procedure
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
5/1/2013 E
General in force PE-O-MT-PRO-007-02-R Procedura pentru numerotarea echipamentelor
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
5/1/2013 R
General in force RO-EP-CP-GDL-001-01-E Contract close-out guideline
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
5/11/2011 E
General in force RO-EP-CP-GDL-002-01-E Contract management plan guideline
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
5/11/2011 E
General in force RO-EP-CP-PRO-003-01-E Change request procedure
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
5/11/2011 E
General in force TO-HQ-02-001-01 Engineering Guidelines and Design Philosophies
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/6/2005 E
General in force RO-EP-EL-OTH-001-01-E PID Legends and Symbols_Annex_ Typical Motor
Arrangements - Legend Link
12/19/2011 E
General in force RO-EP-IN-OTH-002-01-E PID Legends and Symbols Annex Instrumentation-Legend
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
12/19/2011 E
General withdrawn RO-EP-IN-OTH-003-01-E PID Legends and SymbolsAnnex Typical Instrument
Arangements - Valves-Legend replaced by RO-EP-IN-
9/30/2013 E OTH-003-02-E
General in force RO-EP-IN-OTH-003-02-E PID Legends and SymbolsAnnex Typical Instrument
Arangements - Valves-Legend
9/30/2013 E
General in force RO-EP-ME-OTH-002-01-E PID Legends and SymbolsAnnex Piping-Legend
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
12/19/2011 E
General in force RO-EP-PS-OTH-002-01-E PID Legends and Symbols Annex Equipment-Legend
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
12/19/2011 E
General withdrawn RO-EP-FE-AD-PRO-004-01-E Technical Change Control Panel
replaced by PE-D-AD-
PRO-001-01-B
6/1/2012 E
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
General in force PE-D-AD-PRO-001-01-B Technical Change Control Panel
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/1/2012 E,R
General in force GT-M Standard 006 Capital Project Planning and Scheduling Standard
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/4/2012 E
General withdrawn EP-MNT-RO-06-POL-009-02.00-E Condition monitoring guidelines E
General in force RO-EP-EN-GDL-001-01-R Eficienţa energetică şi emisiile de gaze cu efect de seră 27.07.2012 R RO version is New, EN
version posted already
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
General in force GT-M Standard 007 Capital Project Controls Standard 13.06.2012 E electronically approved
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
General in force GT-M 005/ Annex 1 Capital Project Cost Estimating Guideline 06.06.2012 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
General in force GT-M Standard 005 Capital Project Cost Estimating Standard 06.06.2012 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
General withdrawn PEP-M-CC-001-00 Management of claims adressed to Contractors 11/12/2012 E Replaced by GTM
008_Claims Management
Standard in Capital
Projects
General withdrawn RO-EP-CP-PRO-004-02 Claims Management Procedure 11/12/2012 E Replaced by GTM
008_Claims Management
Standard in Capital
Projects
General in force GT-M Standard 008 Claims Management Standard in Capital Projects 11/13/2012 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Replaced by PE-D-[000]-
General withdrawn PE-D-[000]-GE-LST-001-01-E List of standards applicable in projects 12/8/2013 E GE-LST-001-02-B
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
General in force PE-D-[000]-GE-LST-001-02-B List of standards applicable in projects 12/9/2013 B Link
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
General in force PE-D-PM-STD-002-00 Capital Project Cost Estimating 11/29/2013 B Link
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
General in force PE-D-PM-STD-001-00 Capital Projects Planning and Scheduling 11/29/2013 B Link
HSSE in force TO-HQ-02-075-00 Philosophy for Escape, Evacuation and Rescue-Onshore 03.06.2005 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force HSEQ-RO-01-02-00 Stopping work – individual responsibility and accountability 26.08.2009 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force HSEQ-RO-06-16-00 Material safety datasheets in Petrom EP and EPS 5/11/2009 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force HSEQ-RO-06-21-00 Storage, handling and transport of hazardous substances and 9/1/2009 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
goods
HSSE in force HSEQ-RO-06-21-00 Depozitarea, manipularea si transportul 9/1/2009 R
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
substantelor/preparatelor periculoase
HSSE in force HSEQ-RO-06-16-00 Fise cu date de securitate in Petrom EP si EPS 11.05.2009 R
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force HSEQ-RO-09-02-01 Nonconformity, corrective action and preventive action 18.01.2010 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force HSSE-P-001 Monitoring of Contract Performance during contract execution 01.12.2011 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force HSEQ-RO-07-02-00 Procedura de cerinte HSE pentru Contractorii OMV Petrom 6/21/2010 R
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
EP+EPS
HSSE in force HSEQ-RO-07-02-00 Procedure for HSE Requirements for OMV Petrom EP + EPS 6/21/2010 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Contractors
HSSE in force HSSE-R-010 Environmental Practices in Projects 4/20/2012 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force P HSSE 003 E Monitoring of Contract Performance during Contract Execution 12/1/2011 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force P HSSE 003 R Monitorizarea performanței în perioada execuției contractuale 12/1/2011 R
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
HSSE in force REC HSSE 002 E HSSE Pre-qualification of Contractors 6/21/2010 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force REC HSSE 003 E Contractor Meetings and Reports 12/1/2011 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE in force REC HSSE 003 R Ședințe cu contractorii și raportările aferente 12/1/2011 R
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
HSSE withdrawn EP-HQ-03-GL-008-00 Guideline for Identifying Safety Critical Elements 4/27/2012 E
HSSE in force EP-HQ-GDL-008-00 Safety Critical Elements – Integrity Management Guideline 7/27/2012 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Instrumentation and in force PE-D-IN-PRO-001-01-E Procedure for Numbering Intruments and Loops 16.07.2012 E
Control http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
7/1/2011
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Offshore in force TO-HQ-02-111-00 Philosophy for Electrical Design-Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-112-00 Philosophy for Main Generators and Switchboard - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-113-00 Philosophy for Emergency Generators and Switchboard -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-114-00 Philosophy for Electrical Cabling Design - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-115-00 Philosophy for Uninterruptible Power Supplies - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-116-00 Philosophy for Earthing, Bonding and Lightning Protection -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-117-00 Philosophy for Motors, Drives and Transformers - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-118-00 Philosophy for Lighting and Trace Heating - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-119-00 Philosophy for Hazardous Area Classification and HVAC -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-120-00 Philosophy for Marine Navigational Aids- Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-121-00 Philosophy for Process Control Systems- Offshore 8/15/2005 E https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore in force TO-HQ-02-122-00 Philosophy for Wellhead Control Systems - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-123-00 Philosophy for Safety Integrity Levels - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-124-00 Philosophy for Emergency and Process Shutdown Systems -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-125-00 Philosophy for Fire and Gas Systems - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-126-00 Philosophy for Communications and Security Systems -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-127-00 Philosophy for Flow Metering Systems - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-128-00 Philosophy for Subsea Control Systems- Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-131-00 Philosophy for Process Systems-General Design Guideline -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-132-00 Philosophy for Utility Systems - General Design Guideline -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-134-00 Philosophy for Isolation of Process Systems - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-135-00 Philosophy for Overpressure Protection and Safeguarding -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-136-00 Philosophy for Flare Relief Blowdown - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-137-00 Philosophy for Piping Design - Offshore 8/15/2005 E https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Offshore in force TO-HQ-02-138-00 Philosophy for Pipe Stress and Flexibility Analysis - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-139-00 Philosophy for Rotating and Reciprocating Equipment -
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-140-00 Philosophy for Pressure Vessels and Storage Tanks - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-141-00 Philosophy for Offshore Jacket and Foundations Strunctural
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Design-Offshore 8/15/2005 E
Offshore in force TO-HQ-02-142-00 Philosophy for Topsides and Helideck Structural Design-
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
Offshore 8/15/2005 E
Offshore in force TO-HQ-02-143-00 Philosophy for Floating Installations Structural Design- Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-151 Philosophy for Pipeline Material Selection- Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-152-00 Philosophy for Pipeline Mechanical Design- Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-153-00 Philosophy for Pipeline Construction Design- Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-154-00 Philosophy for Pipeline Operation and Maintenance - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-161-00 Philosophy for Operations - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-162-00 Philosophy for Spares - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-163-00 Philosophy for Maintenance - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-171-00 Philosophy for HSEQ Management - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-172-00 Philosophy for Active Fire Protection Systems- Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-173-00 Philosophy for Passive Fire Protection Systems - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-174 Philosophy for Safety Equipment - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force TO-HQ-02-175-00 Philosophy for Escape, Evacuation and Rescue - Offshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
8/15/2005 E
Offshore in force HSEQ-RO-06-12-01 Offshore helicopter transportation procedure
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
E
Operation in force PEP-O-GE-PRO-004-02-E Project interface procedure
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
7/1/2011 E
Operation in force PEP-O-GE-PRO-004-02-R Procedura pentru interfata de asigurare a noilor proiecte
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
7/1/2011 R
Operation withdrawn PE-O-GE-PRO-002-03-E Engineering Change Control Procedure - Operations &
Maintenance New version is not
4/1/2013 E applicable to Contractors
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Operation withdrawn PE-O-GE-PRO-002-03-R Procedura Controlul modificarilor tehnice Operatiuni &
Mentenanta New version is not
4/1/2013 R applicable to Contractors
Operation in force TO-HQ-02-061-00 Philosophy for Operations -Onshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/3/2005 E
Operation in force TO-HQ-02-062-00 Philosophy for Spare-Onshore
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/3/2005 E
Operation in force TO-HQ-02-063-00 Philosophy for Maintenance-Onshore E
Link
6/3/2005
Operation in force EPP-HQ-03-GL-002-00-E Operations Readiness Assurance Guideline E
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
10/5/2009
Operation in force PEP-O-GE-GDL-004-03-E Maintenance Guideline - Condition Monitoring 01.07.2011 E
https://epconnect.petrom.com/projectsandengineering/qaqcandinteg
Link
6/20/2012 E
Piping and Pipelines in force PE-O-SS-SPC-001-02-E Tech. Spec. Multilayer Thermoplastic Smooth Bore Flexible 7/2/2012 E
Pipe http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Piping and Pipelines in force RO-EP-FE-EL-STD-001-03-E Standard for Cathodic Protection 6/20/2012 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Piping and Pipelines in force C.1.6_RFQ Specification for handling and storage of pipe materials E posted at request
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Piping and Pipelines in force C.1.8_RFQ Specifications for destructive testing (DT) E posted at request
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Piping and Pipelines in force C.1.9_RFQ Specification for final documentation for construction of buried posted at request
pipelines http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
E
Piping and Pipelines in force PE-M-SS-STD-014-02-R Standard de conducte din otel carbon pentru sistemul onshore
de transport gase si titei http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
9/1/2013 R
Piping and Pipelines in force PE-M-SS-STD-014-02-E Carbon steel pipelines for onshore transport system of oil and
gas Petrom Standard http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
9/1/2013 E
Piping and Pipelines in force PE-D-ME-SPC-001-01-E OMV Petrom E&P Specification for Procurement of Carbon
Steel Line Pipe for Onshore Buried Pipelines Link
10/9/2013 E http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Piping and Pipelines in force E-C.2.4-HQ-STD-001-00 Carbon Steel Line-pipe Specification for Butt-welded Onshore
Pipeline http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
10/4/2012 E
Piping and Pipelines in force Local Amendment to E-C.2.4-HQ-STD-001-00 Local Amendment to OMV E&P Specification E-C.2.4-HQ-STD-
001-00 Carbon Steel Line-pipe Specification for Butt-welded
Onshore Pipeline http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
5/3/2013 E
Piping and Pipelines in force PE-M-SS-STD-025-01_E Salt Water Injection manifold with steel PE lined elements 9/20/2012 E http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
1/9/2012 E
Process Safety withdrawn RO-EP-SR-STD-001-01-R Standard de firma pentru selectia echipamentelor Ex
1/9/2012 R
Process Safety in force TO-HQ-02-035-00 Philosophy for Overpressure Protection and Safeguarding-
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Onshore 6/3/2005 E
Process Safety in force TO-HQ-02-036-00 Philosophy for Flare Relief Blowdown-Onshore
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/3/2005 E
Process Safety withdrawn TO-HQ-02-072-00 Philosophy for Active Fire Protection Systems-Onshore not replaced with anything
6/3/2005 E so far
Process Safety in force TO-HQ-02-073-00 Philosophy for Passive Fire Protection Systems-Onshore
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/3/2005 E
Process Safety in force TO-HQ-02-074-00 Philosophy for Safety Equipment-Onshore
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
6/3/2005 E
Process Safety in force EP FA FF 01 PH Philosophy for Fire and Gas Detection Systems
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
9/21/2009 E
Process Safety in force EP FF 02 PH Philosophy for Passive Fire Fighting
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
7/2/2007 E
Process Safety in force PE-D-HA-PRO-001-01-E ATEX Procedure for projects
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
3/31/2012 E
Process Safety in force PE-D-HA-PRO-001-01-R Procedura ATEX pentru Proiecte
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
3/31/2012 R
Process Safety in force RO-EP-DMSS-STD-046-01-E Standardization of the Explosion-Proof Protection for Low
Voltage Electrical Motors
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
2/29/2012 E
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
Process Safety in force RO-EP-DMSS-STD-046-02-R Standardizarea tipurilor de protectie antiexploziva la motoarele
electrice de joasa tensiune
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
2/29/2012 R
Process Safety withdrawn EP FF 03 PH Philosophy for Active Fire Protection System E
Process Safety in force Pe-D-FF-WOI-001-01-E AFP withdrawal_ Withdrawal of EP FA FF 03 PH Philosophy for 01.10.2012 E
Active Fire Fighting_17.10.2012 http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Process Safety in force RO-EP-SR-GDL-001-01 Process Safety and Integrity in Engineering and Design 15.12.2011 E
http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force PE-D-SG-PRO-001-02-B Standard requirements for Surveying & GIS works 1/18/2012 E, R
Works http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force PE-D-SG-PRO-002-02-B Handover Takeover procedure for Construction works January 2012 E, R
Works http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force RO-EP-QA-SPC-001-01-B Specification for Erection Static Equipment June 2010 E, R
Works http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force RO-EP-QA-SPC-002-01-B Specification for Design Installation Cathodic Protection November 2010 E, R
Works http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force RO-EP-QA-SPC-003-01-B Specification for Design and Installation of Flat Bottom Tanks October 2010 E, R
Works http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
Discipline Status Doc. No. Doc title In Languag Link Link Notes
force/Withdrawn e
starting with
QA/QC, GIS, Installation in force RO-EP-QA-SPC-004-01-B Specification for Execution and Inspection of Civil Works November 2010 E, R
Works Onshore http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force RO-EP-QA-SPC-007-01-B Specification for Generation of Isometric Drawings. November 2010 E, R
Works http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force RO-EP-QA-SPC-011-01-B Specification for Rotating Equipment Installation - Pumps June 2010 E, R
Works http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation withdrawn RO-EP-QA-GDL-010-01-B Minimum Quality Requirements for Contractors 9/30/2012 E, R
Works
QA/QC, GIS, Installation in force RO-EP-QA-GDL-010-03-E Minimal requirements regarding Quality Assurance and Control 01.10.2012 E
Works for Contractors http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link
QA/QC, GIS, Installation in force RO-EP-QA-GDL-010-03-R Cerinte minime privind Asigurarea si Controlul Calitatii pentru 01.10.2012 R
Works contractori http://epconnect.petrom.com/projectsandengineering/qaqcandintegri
Link