RISING
Maharashtra
Telangana
KARNATAKA
Tamil Nadu
Kerala
13,565 km
NH LENGTH
UPTO YEAR 2014
6,760 km
Adding new
National Highways
in Karnataka
13,565 km
6,760 km
Yr 2014 - 2018
Yr 2010 - 2014
6
Construction of roads
in Karnataka
1,677 km
956 km
Yr 2014 - 2018
Yr 2010 - 2014
Constructed Constructed
length length
7
Road Projects
awarded in Karnataka
2,376 km 3,135 km
8
Accelerated NH Development
under Central Road Fund (CRF)
in Karnataka
Yr 2010 - 2014 Yr 2014 - 2018
9
Landmark Projects
in Karnataka
10
Bengaluru Ring Road (STRR)
The Bengaluru Ring Road is being developed at a
tentative cost of Rs. 15,000 Cr. The project has 240
km in Karnataka and 45 km in Tamil Nadu. Under this
project, which is a part of the Bharatmala Pariyojana,
NHAI will implement the entire STRR around
Bengaluru. This Ring Road stretch will connect Hosur,
Anekal, Kanakapura, Ramanagara, Magadi, Dabaspet,
Doddaballapura, Devanahalli and Hoskote.
At a Glance
285 km Rs. 15,000 Cr
total length total cost
11
Shiradi Ghat Tunnel
The Shiradi Ghat Tunnel, spanning a total length 23.60
km is being built at a tentative cost of Rs. 10,000 Cr.
The tunnel, on completion, will connect with many
bridges, the longest bridge being 1.50 km in length
with highest pier of 100 mtr.
At a Glance
6 tunnels with a total Emergency lane for
length of 12.60 km each tube
2 driving lanes 10.50 m carriage
way width
12
Ring Road to Belgaum
Spanning a total length of 55 km, the 4/6 lane
Belgaum bypass will be built at a tentative cost
of Rs. 1,500 Cr, connecting NH-4 to NH-4A. It will
ease the traffic congestion in the city.
At a Glance
55 km total length Rs. 1,500 Cr total cost
13
6 laning and Access Control of
Bengaluru –Mysore section
This project is a part of the Bengaluru-Malappuram
Economic Corridor. The entire project has been
provided with Access Control, along with Service
Road. DPR has already been completed. Bids have
been received and awarded.
At a Glance
117 km total length 9 major bridges
Rs. 7,000 Cr 4 ROBs
estimated cost
8 km elevated
corridors
14
Bengaluru-Chennai Expressway
Bengaluru – Chennai Expressway has been planned as
a greenfield Expressway. It will serve as a key logistics
corridor, fast tracking import/export and improving
connectivity to the Chennai port. This project has
been identified as one of the priority projects under
Chennai–Bengaluru Industrial Corridor (CBIC). The
Expressway, worth Rs. 16,000 Cr, will pass through
three states, covering 76 km in Karnataka, 91 km in
Andhra Pradesh & 94 km in Tamil Nadu. On completion,
it will connect the proposed Multimodal Logistic Park
at Dobaspet, which is also accessible via NH207 or
Bengaluru Ring Road from BCE.
At a Glance
261 km total length Rs. 16,000 Cr
total cost
15
Bengaluru - Amaravati section
Bengaluru and Amaravati are connected via
two routes, Anantapur and Tirupati. The work on
Bengaluru - Amaravati section via Anantapur,
passing through NH-7 has been completed. This
4.5 km long 4 lane Elevated Highway now links the
Bengaluru International Airport.
16
Hubli-Haveri section
6 Laning & Strengthening of NH-48 ( Old NH-4) to be
Details
executed on Hybrid Annuity mode
Length 63.4 km
Hubli–Hospet section
4 Laning of Hubli – Hospet Section of NH-63 on EPC Mode.
Details
Project Road start from Proposed Hubli Bypass to Hospet.
Length 143.721 km
17
Belgaum-Dharwad section
Details 6 Laning of Belgaum-Dharwad Section of NH-4
Length 79.36 km
Hospet-Bellary-Karnataka /
AP Border section
4/6 Laning of Hospet-Bellary-Karnataka/AP Border section
Details
of NH-63
Length 95.37 km
18
Hungund-Hospet section
Details 4/6 Laning of Hungund-Hospet Section of NH-13
Length 97.87 km
Davanagere-Haveri section
Details 6 Laning of Davanagere - Haveri section of NH-48 (Old NH-4)
Length 72.983 km
19
Hospet-Chitradurga section
Details 4 Laning of Hospet-Chitradurga section of NH-50 (Old NH-13)
Length 120 km
Maharashtra/Karnataka Border to
Sangareddy section
4 Laning of MH/KNT Border to Sangareddy section of NH-09
Details
(New NH-65) under NHDP
Length 145 km
20
Bijapur-Gulbarga-Homnabad section
Development and Upgradation of Bijapur-Gulbarga-
Details Homnabad section of NH-218 to 2-lane with Paved
Shoulders
Length 220.01 km
Bijapur–Hungund section
4 Laning of Bijapur – Hungund Section of NH-13 (New NH-50) in
Details the State of Karnataka under NHDP Phase-III on Design, Build,
Finance
Length 97.212 km
21
Belgaum Maharashtra Border Road Project
Upgradation and rehabilitation of Belgaum Maharashtra
Details
border road
Length 77.705 km
22
Ongoing projects in
North Karnataka
Chittapur Cross to start of Yadgir Bypass
Widening to 2/4 lane with paved shoulders
Details
of NH-150
Length 36.90 km
Other Structures in
Construction of 1 Toll Plaza & 1 Grade separator
the Project
Length 38.82 km
Other Structures in
Construction of 2 Major Bridges, 1 Fly Over & 1 Toll Plaza
the Project
23
Maharashtra Border to Bidar section
Details Widening to 2/4 lane with Paved Shoulders of NH-50
Length 54.370 km
Other Structures in
Construction of 1 Toll Plaza & 1 Fly Over
the Project
Bidar-Humnabad section
Widening to 2/4 lane with Paved Shoulders of NH-50
Details
under package 2
Length 47.030 km
24
Hagari-Jadacherla section
Widening to 2 lane with Paved Shoulders
Details
of NH-167
Length 30.174 km
Other Structures in
Construction of 1 Major Bridge and 1 Toll Plaza
the Project
Bijapur-Hubli section 1
Widening to 2 lanes with Paved Shoulders of NH-218
Details
from km 4.40 to km 56.00
Length 50.525 km
Other Structures in
Construction of 2 Major Bridges and 1 Toll Plaza
the Project
25
Bijapur-Hubli section 2
Widening 2 Lane with Paved Shoulders of NH-218 from
Details
km 56.00 to km 106.00
Length 50.00 km
Other Structures in
Construction of 1 Toll Plaza.
the Project
Bijapur-Hubli section 3
Widening to 2 lane with Paved Shoulders of NH-218 from
Details
km 106.00 to km 153.00
Length 45 km
Other Structures in
Culverts
the Project
26
Bijapur-Hubli section 4
Strengthening and widening with Paved Shoulders
Details
of NH-218 from km 153.00 to km 193.35
Length 40.305 km
Other Structures in
Construction of 1 Toll Plaza
the Project
Total 1,33,846
27
Projects to be Awarded in Karnataka
Sl. Name of Project Length Sanctioned
No. (km) Cost / TPC
Rs. in Cr
3 Two lane with paved houlders from km 214.88 to 235.100 of NH 150A 20.22 94.01
28
Ongoing NHAI projects in Karnataka
Sl. Lok Sabha Project Stretch NH Project Length Start Date Likely
No. Constituency No. Cost in km date of
(Rs. Cr) completion
29
In-Principle declared NH in Karnataka
1 From junction of NH-52 near Yallapur connecting Sidapura - Thalaguppa and 219.00
terminating at its junction with NH- 66 near Bhatkal
2 From junction of NH-48 near Belgaum connecting Bagalkot and terminating at 336.00
its junction with NH-167 near Raichur
3 From Sirsi, Haveri, Kudligi and termnating at its Junction with NH-150A near 247.00
Molakalnuru
4 From junction of NH-766 near Kalpetta connecting Mannanthavaadi in the 95.00
state of Kerala, H.D.Hote - Jayapura and terminating at Mysore in the state of
Karnataka (length in Karnataka = 95 km; Kerala = 50 km)
5 From junction of NH- 69 near Chintamani connecting Chelur, Rayacheruvu in 55.00
the state of Karnataka up to junction of NH- 42 near Tanakal in the state of A.P
(length in Karnataka= 55 km; Andhra Pradesh = 15 km)
6 From Junction of NH-150A near Molakalnuru- Rayadurg - Anantpur at junction 14.00
at NH-44 (length in Karnataka= 14 km; Andhra Pradesh = 110 km)
7 Tumkur-Kortatagere -Pavagada - Kalyandurg - joining up at Veparalla (length 116.00
in Karnataka= 116 km; Andhra Pradesh = 49 km)
8 From Junction of NH- 67 near Ram Nagar and terminating at its junction with 118.00
NH-66 near Sadashivagad in the state of Karnataka
9 From junction of NH- 48 near Davanagere and terminating at its junction with 60.00
NH 369 near Chennagiri
10 From junction of NH- 48 near Chitradurga connecting Chelkere, Pavagada 120.00
in the state of Karnataka and terminating at its junction of NH-44 near
Penukonda in the state of Andhra Pradesh (length in Karnataka= 120 km;
Andhra Pradesh = 26 km)
11 From junction of NH-50 near Gulbarga and terminating at its junction with NH- 64.00
65 near Umerga (length in Karnataka= 64 km; Maharashtra = 15 km)
12 From Junction of NH-48 near Sankeshwar connecting Gokak, Yargatta, 124.00
Munavalli and terminating at its junction with NH-52 near Nargunda
13 NH4 - Tadas - Kalgatagi - Dharwad - Hebsure - Navalgund - Annigeri - NH 63; 118.00
may be considered for In-Principle approval for preparation of DPR and subject
to adequacy of DPR, it may be considered for declaration as new NH
14 Stretch from Nargund (Nawalgund)– Belabaniki - Gajendragad - Kustagi - 141.00
Tavargere – Sindhanur on NH 150 A
15 Stretch from Koppal - Belgatti- Mundaragi- Bagevadi- Belhatti- Govandi- 114.00
Gurdur- Shiggon
16 Stretch from Khanapur- Haliyal- Yellapur on NH-52 101.00
19 Raichur-Sindhnur 90.00
20 Bilikere-Holenarasipura-Hassan-Belur 131.00
28 Thokkuttu-Mudippu-Melkar 28.00
30
In-Principle declared NH in Karnataka
32 Dandeli-Haliyal-Dharwad-Saundatti-Mudhol-Jamkandi-Vijaypura 270.00
33 Nargund-Gadag-Mundargi-Itgi-Jagalur 260.00
41 Chincholi- Sedam- Chitapur- Wadi- Nalwar- Sannati- Shahapur (NH to NH link 170.00
road)
42 Jath (Mah)-Athani-near Gokak (Karnataka=92km, Maharashtra=26km) 92.00
46 Channarayapattana-Holenarasipur-Arkalgud-Kodlipet-Madikeri 138.00
49 Ramasmudra-Unjalkate 32.00
51 Gundya-Subramanya 17.00
52 Kundapur-Koteshwar-Halady-Someshwara-Agumbe-Sringeri 88.00
31
In-Principle declared NH in Karnataka
Sl. Stretch Tentative
No. Length (km)
As on
30/11/2017
62 Bijapur- Yatnal (Karnatak) - Guddapur- Jatta- Junction of NH-166 near Nagaj 47.00
(Length in Maharashtra= 55 km ; Karnataka = 47 km)
63 NH-9 Connecting Tembhurni - Pandharpur-Mangalwedha-Vijapur Karnataka 15.00
border (Maharashtra= 125 km; Karnataka= 15 km)
64 Jahirabad-Bidar-Deglur (Maharashtra= 100; Karnataka= 58; Telangana= 25) 58.00
Total 6609.20
32
Key Indian National Highways
SRINAGAR
Jammu
Jalandhar
DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Jhansi Purnea
Shivpuri
Udaipur Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Eluru Vijayawada
Belgaum LEGEND
Chilakaluripet
Golden Quadrilateral
Tumkur
Hosur CHENNAI
Bangalore Ranipet North South Corridor
Selam Krishnagiri
Bay of Bengal East West Corridor
COCHIN Madurai
Lakshadweep
KANYAKUMARI
Indian Ocean
33
National Highways - India Story
Fast tracking National Highway Development
NH LENGTH
NH LENGTH
91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018
New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km
34
National Highways - India Story
22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015
2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day
Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018
Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr
35
National Highways - India Story
Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF
works sanctioned for the upgradation & improvement
of roads /bridges in the Nation
2,876
Yr 2010 - 2014
Projects
935
Projects
Total Cost
Total Cost
Rs. 8,613.51 Cr Rs. 48,186.57 Cr
Yr 2014 - 2018
36
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.
37
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles
38