STAGE 3a - EXCAVATE & WIDEN EASTERN SIDE OF CANAL AFTER COMPLETION OF STAGE 1 & 2

STAGE 3b - INSTALL 3 nos. OF KING POSTS, HORIZONTAL BEAM, BRACING/BRACKETS FOR DESK
SUPPORT OF MICROPILE MACHINE WORK PLATFORM (DAY 8-11)

150x150x37.4kg/m BEAM

350x350x159kg/m KING POSTS & BEAM


(12m LENGTH) WATER MAIN WATER MAIN

100x50x10mm thk ANGLE BAR


BRACING SUPPORT @1.5m C/C

MICROPILE CASTING
WATER MAIN WATER MAIN