Cheves Hydropower Project Bill 2.

1 Page 4
Contract C - Civil Work
Vol. 5 Schedule 1 Bill of Quantities

Bill No. 2 - Roadworks


Bill 2.1 Permanent Roads and Paved Areas

Item Description Unit Quantity Unit Price Total Price


USD USD

2.1.01 STRENGTHENING OF EXISTING PUBLIC ROADS


The Contractor shall, based on his detailed investigations of the road conditions,
establish his needs of strengthening and improving of existing public roads and bridges
outside the Site for the purpose of execution the Works. A Lump Sum covering the LS 1.00 615,091.00 615,091.00
corresponding work and design shall be given together with a detailed description of
the scope and costs.

2.1.02 ACCESS ROAD TO HUAURA DAM AND INTAKE. Design and built.
2.1.02.01 Topsoil excavation. m3 400.00 5.25 2,100.00
2.1.02.02 Soil excavation. m3 2,000.00 5.13 10,260.00
2.1.02.03 Bulk rock excavation (width > 2 m). m3 50.00 32.72 1,636.00
2.1.02.04 Embankment fill. m3 300.00 24.50 7,350.00
2.1.02.05 Reinforced concrete pipe. Di = 500 mm m 20.00 334.00 6,680.00
2.1.02.06 Subgrade preparation. m2 1,000.00 0.88 880.00
2.1.02.07 Subbase. Thickness minimum 300 mm m3 300.00 29.25 8,775.00
2.1.02.08 Base course. Thickness minimum 150 mm m3 140.00 29.25 4,095.00
2.1.02.09 Double bitumenous surface treatment m2 900.00 4.37 3,933.00
2.1.02.10 Spoiling of surplus m3 2,450.00 3.73 9,138.50

2.1.03 ACCESS ROAD TO CHECRAS DAM, INTAKE AND SAND EXCLUDER. Design and built.
2.1.03.01 Reinforced concrete pipe. Di = 500 mm m 50.00 334.00 16,700.00
2.1.03.02 Fully cement grouted rock bolts. D= 25 mm. Depth in rock 3.0 m. no 100.00 88.91 8,891.00
2.1.03.03 Subgrade preparation. m2 1,000.00 0.88 880.00
2.1.03.04 Subbase. Thickness minimum 300 mm m3 300.00 29.25 8,775.00
2.1.03.05 Concrete pavement as specified for access roads, thickness 200 mm m2 900.00 58.38 52,542.00
2.1.03.06 Guard rail. m 200.00 89.45 17,890.00
2.1.03.07 Shotcrete, plain m3 50.00 348.48 17,424.00
2.1.03.08 Welded wire fabric fixed to rock bolts m2 100.00 11.65 1,165.00

2.1.04 ACCESS ROAD TO CONSTRUCTION ADIT NO 1. Design and built.


2.1.04.01 Topsoil excavation. m3 500.00 5.25 2,625.00
2.1.04.02 Soil excavation. m3 8,000.00 5.13 41,040.00
2.1.04.03 Bulk rock excavation (width > 2 m). m3 2,500.00 32.72 81,800.00
2.1.04.04 Embankment fill. m3 500.00 24.50 12,250.00
2.1.04.05 Reinforced concrete pipe. Di = 500 mm m 80.00 334.00 26,720.00
2.1.04.06 Subgrade preparation. m2 6,000.00 0.88 5,280.00
2.1.04.07 Subbase. Thickness minimum 300 mm m3 1,500.00 29.25 43,875.00
2.1.04.08 Base course. Thickness minimum 150 mm m3 750.00 29.25 21,937.50
2.1.04.09 Gravel Wearing Course m3 2,500.00 20.53 51,325.00
2.1.04.10 Guard rail. m 600.00 89.45 53,670.00
Fully cement-grouted rock bolts, deformed bar.
2.1.04.11 no 125.00 47.74 5,967.50
D=20 mm. Depth in rock 2.9 m
Fully cement-grouted rock bolts, deformed bar.
2.1.04.12 no 40.00 54.26 2,170.40
D=20 mm. Depth in rock 3.9 m
Fully cement-grouted rock bolts, deformed bar.
2.1.04.13 no 10.00 106.50 1,065.00
D=20 mm. Depth in rock 5.9 m
2.1.04.14 Chainlinked mesh fixed to rock bolts. m2 250.00 14.48 3,620.00
2.1.04.15 Steel straps fixed to rock bolts. m 100.00 42.01 4,201.00
2.1.04.16 Shotcrete.Fibre-reinforced. m3 20.00 348.48 6,969.60

2.1.05 ACCESS ROAD TO CONSTRUCTION ADIT NO 2 AND SURGE TUNNEL


Not used

ACCESS TUNNEL PORTAL, ACCESS ROAD AND REALIGNMENT OF PUBLIC ROAD.


2.1.06
Design and built.
2.1.06.01 Topsoil excavation. m3 50.00 5.25 262.50
2.1.06.02 Soil excavation. m3 3,500.00 5.13 17,955.00
2.1.06.03 Embankment fill. m3 12,000.00 24.50 294,000.00
2.1.06.04 Reinforced concrete pipe. Di = 500 mm m 150.00 334.00 50,100.00
2.1.06.05 Subgrade preparation. m2 3,500.00 0.88 3,080.00
2.1.06.06 Subbase. Thickness minimum 300 mm m3 1,250.00 29.25 36,562.50
2.1.06.07 Gravel Wearing Course m3 300.00 20.53 6,159.00
2.1.06.08 Concrete pavement as specified for access roads, thickness 200 mm m2 600.00 58.38 35,028.00
2.1.06.09 Guard rail. m 500.00 89.45 44,725.00
2.1.06.10 Gravel Wearing Course m3 300.00 20.53 6,159.00

2.1.07 ACCESS ROAD TO PICUNCHE DAM. Design and built.


2.1.07.01 Topsoil excavation. m3 600.00 5.25 3,150.00
2.1.07.02 Soil excavation. m3 1,500.00 5.13 7,695.00
2.1.07.03 Rock excavation. m3 500.00 32.72 16,360.00
2.1.07.04 Embankment fill. m3 7,500.00 24.50 183,750.00
2.1.07.05 Reinforced concrete pipe. Di = 500 mm m 50.00 334.02 16,701.00
2.1.07.06 Subgrade preparation. m2 1,500.00 0.88 1,320.00
2.1.07.07 Subbase. Thickness minimum 300 mm m3 450.00 29.25 13,162.50
2.1.07.08 Double bitumenous surface treatment m2 1,300.00 4.37 5,681.00
2.1.07.09 Guard rail. m 50.00 89.44 4,472.00
2.1.07.10 Spoiling of surplus m3 2,100.00 3.73 7,833.00
Cheves Hydropower Project Bill 2.1 Page 5
Contract C - Civil Work
Vol. 5 Schedule 1 Bill of Quantities

Bill No. 2 - Roadworks


Bill 2.1 Permanent Roads and Paved Areas

Item Description Unit Quantity Unit Price Total Price


USD USD

2.1.08 ADJUSTMENT OF PUBLIC ROAD ALIGNMENT AT HUAURA DAM.


2.1.08.01 Topsoil excavation. m3 160.00 5.25 840.00
2.1.08.02 Soil excavation. m3 4,000.00 5.13 20,520.00
2.1.08.03 Bulk rock excavation (width > 2 m). m3 4,000.00 32.72 130,880.00
2.1.08.04 Reinforced concrete pipe. Di = 500 mm m 50.00 334.00 16,700.00
2.1.08.06 Subgrade preparation. m2 400.00 0.88 352.00
2.1.08.07 Subbase. Thickness minimum 300 mm m3 118.00 29.25 3,451.50
2.1.08.08 Base course. Thickness minimum 150 mm m3 53.00 29.25 1,550.25
2.1.08.09 Gravel Wearing Course m3 344.00 20.53 7,062.32
2.1.08.10 Guard rail. m 40.00 89.45 3,578.00
2.1.08.11 Spoiling of surplus m3 8,160.00 3.73 30,436.80
Fully cement-grouted rock bolts, deformed bar.
2.1.08.12 no 300.00 47.74 14,322.00
D=20 mm. Depth in rock 2.9 m
Fully cement-grouted rock bolts, deformed bar.
2.1.08.13 no 30.00 54.26 1,627.80
D=20 mm. Depth in rock 3.9 m
Fully cement-grouted rock bolts, deformed bar.
2.1.08.14 no 20.00 106.50 2,130.00
D=20 mm. Depth in rock 5.9 m
2.1.08.15 Chainlinked mesh fixed to rock bolts. m2 1,000.00 14.48 14,480.00
2.1.08.16 Steel straps fixed to rock bolts. m 100.00 42.01 4,201.00
2.1.08.17 Shotcrete.Fibre-reinforced. m3 50.00 348.48 17,424.00

2.1.09 NEW ALIGNMENT OF PUBLIC ROAD AT CHECRAS HEADWORKS


2.1.09.01 Topsoil excavation. m3 2,600.00 5.25 13,650.00
2.1.09.02 Soil excavation. m3 11,000.00 5.13 56,430.00
2.1.09.03 Bulk rock excavation (width > 2 m). m3 5,000.00 32.72 163,600.00
2.1.09.04 Embankment fill. m3 1,000.00 24.50 24,500.00
2.1.09.05 Reinforced concrete pipe. Di = 500 mm m 120.00 334.00 40,080.00
2.1.09.06 Subgrade preparation. m2 6,500.00 0.88 5,720.00
2.1.09.07 Subbase. Thickness minimum 300 mm m3 2,000.00 29.25 58,500.00
2.1.09.08 Base course. Thickness minimum 150 mm m3 900.00 29.25 26,325.00
2.1.09.09 Gravel Wearing Course m3 5,600.00 20.53 114,968.00
2.1.09.10 Guard rail. m 40.00 89.45 3,578.00
2.1.09.11 Spoiling of surplus m3 12,600.00 3.73 46,998.00
Fully cement-grouted rock bolts, deformed bar.
2.1.09.12 no 500.00 47.74 23,870.00
D=20 mm. Depth in rock 2.9 m
Fully cement-grouted rock bolts, deformed bar.
2.1.09.13 no 70.00 54.26 3,798.20
D=20 mm. Depth in rock 3.9 m
Fully cement-grouted rock bolts, deformed bar.
2.1.09.14 no 30.00 106.50 3,195.00
D=20 mm. Depth in rock 5.9 m
2.1.09.15 Chainlinked mesh fixed to rock bolts. m2 300.00 14.48 4,344.00
2.1.09.16 Steel straps fixed to rock bolts. m 50.00 42.01 2,100.50
2.1.09.17 Shotcrete.Fibre-reinforced. m3 200.00 348.48 69,696.00

2.1.10 ADJUSTMENT OF PUBLIC ROAD AT TAILRACE TUNNEL OUTLET. Design and built.
2.1.10.01 Subgrade preparation. m2 500.00 0.88 440.00
2.1.10.02 Subbase. Thickness minimum 300 mm m3 147.00 29.25 4,299.75
2.1.10.03 Base course. Thickness minimum 150 mm m3 67.00 29.25 1,959.75
2.1.10.04 Gravel Wearing Course m3 430.00 20.53 8,827.90
2.1.10.05 Guard rail. m 20.00 89.45 1,789.00
2.1.10.06 Temporary realignment of public road LS 1.00 33,188.00 33,188.00

2.1.11 MAINTENANCE OF ROADS. Design and built.


Maintenance of roads within the Site.
2.1.11.01 Maintenance of public roads close to the Site which are used regularly by the months 34.00 59,803.32 2,033,312.88
Contractor and Other Contractors

2.1.12 PAVED AREAS AT ACCESS TUNNEL PORTAL AND SWITCHYARD. Design and built.
2.1.12.01 Subgrade preparation. m2 750.00 0.88 660.00
2.1.12.02 Subbase. Thickness minimum 300 mm m3 250.00 29.25 7,312.50
2.1.12.03 Concrete pavement as specified for access roads, thickness 200 mm m2 650.00 58.38 37,947.00

Sum Bill 2.1 Permanent Roads and Paved Areas 4,973,522.15