You are on page 1of 5
soe peuuog snba ou esse exeoud wep) uote! eta gn ro omnn w pDme mn wo PHC PART —B (Answer any 20 questions! Mark the type of work permits authorisations required for the following jobs ‘GWE Cold Work Parmit HWP- Hot Work Permit ExA - Exeavation Authorizaifon | CSE - Confined Space Entry Authorization, 4.Uze of intrinsically safe electronic equipment in the hazardous area cwr HWP ose EA None 2. Entering into a nitrogen gas purged resetor with Life Supporting System, owe ewe ose Ex None ‘Hydro testing ofa pipeline using Engine Driven pump. (awe cse EA None 4. Laying electrical cables inside the excavation (already done) at depth 1m by using hand tools, cwe Hwe cse Ex None 65. Tightening the bolts & nuts of the flanges of a pipeline using power tools. cw HWP se ExA, None 6. Seaffold erection inside a tank using hand tools. cw HWP ose Ba None 7. Inspection using non-spark tools on floating roof tank when roaf is 4m below from the top. cwP Hwe ose ExA None handling in the warchouse using a forklift. cwP HWP ose ExA None 8. Loading & dumping ofa catalyst by using a crane. cw Hw ose EA None 10.Carry out radiographic test for welded joints of a pipeline by using x-ay. cwr ]Hwe cse ExA None 11.Grinding & welding of a pipeline inside the workshop. cwP HWP cse ExA, None 42.Electrical Isolation by Electrical Maintenance at Electrical Substation cw we ce Jem None ‘pst #3- cybs/zou/aen 61 yess 12.Making Excavation at a depth of 1m by using hand tools. cwr HW Cycse EA None bar works (prior to Reinforced Cement Concrete) in an excevation of im depth. ‘wr HWE ose Ext None 416,Condition Monitoring of Pumps by using non-Intrinsically sae equipment. (lew HWP ose Exh None 16.Thicknoss survey of pipeline by using intrinsically safe equismont owe ]Hwe ose aA None {17-Hot tapping by using portable comprossor. cwr HWP se xa None 48.Entry to 3m deep excavated trench. cwe [_]Hwe ose xa None ‘8:eat exchanger Bundle pling work by using bunclo (Engine Driven). wr Hwe ose eA None 20,Welding inside the tank under maintonance. cw HW ose xk None 21,Removal of pipoine insulation using power tools. owe HWP ose Exh None 22.Pump alignment in process area using power tools. ‘ewe [J Hwe ose Exh None 23.Driving the vehicle on main roads ofthe refinery. ewe = [J HWP. ]os= Ext None 24,Painting inside a building in hazardous area using hand tools. ‘cwP Hw ese Exh None 25.cWvl works by using hand ool at hight over 3m on he satolng, cw we [Yes ea None Part (Answer anv 16 quostions) ‘Select anyone suitable answer from the below 4) The llomableconcontiston of O50 for Confined Space En wit Int atmoschere: = [Seem aL on 2) in eas of manual Work Permits, completed werk permit should bs closed and fis for Find Oper st the allowable eel of 0 forthe esse ent with SOBA? 5 [10 n= _— > | 400 rem © | 256m | 355em 6) lactic mussook ystam, he invoves pe 2 | Set, lcrel & Mochi an fume eae SRT = | Satay, Operations & Bacicl Mane [ [ete mare or 7) taser shana 1th wor sie withthe Executor before esing the permit for all Works ‘ring normal runnin ofthe plant 3 [ Necossar fr a works | Notnecesean | Necessary fer Cal Tsk any | Necessary olan Rec wrks on a spheres, hero tole case!vapors ate above TLV, the mole ah Aline fessor ith eape eye | Crema CarigetCaniter mask | | Se-contnad etn mat Ethera0ne 9) Tweiouet soy : | 10pm [Som | 256m | 0p= a 10)! normal condition, who wil ese the Work Permit fr Offen Bullings? [2 | Operation Contr [e [Asset Cusoan Mb 0% ayypany/ ie 6 [| Setay Erneer | Sesten Hess Operations oes +1) Renemal of Work Permits for Meum Risk Tasks more than to Une sll be taken By ‘estan Heed eaneulston AS Oona Conmtar ] Stic Eminesr te — Maintenance Ergineee ‘| SR Salty Engineer *2) White performing CTRA (Ciel Task Rk Accosement) ihe riko evausted as "Mein fra ark, wnt sein shall Se dons? | Psetnan wo | some staat at mance ats tng LO conc {Sicha ui sie Soe GTRA leans leader to consult his 7 ae Spetar onset elrmine fate atonal meats whch ay _Lietten testo low 42) Scenes sre “ark Prt eb: [= Tum Lear, Ont 5 (5 eames is le None ofthe ove all sore amet i 1) astn wos retina a | Medium Risk Work Tp [ ctical werk [Rear re [a [tow it wr 16) uring tumarounds, for contauous Cetea works, renewal of Wore Permits Upto maximum of sch be delded by Ta | Operatins Team Leader [| mansaer Operations [etic RiskAssarement Toor | Conwater ‘7Whigh of the work resuites Ceca Task ick Assasement TRA)? Wieling, gen ad at etl b | Poounstc Testy [Ht ten Ta [arate stove 1 18) Servicing ot Teachone at ofes recues: [color rot [we Pas = [oa [ito cn Aon ‘Pom doe ga a (eco 3 toa are fortighskwok «| [Nonetheabove 20) hg wil approve the contactor personel works the Exacutr? Mantenance Manogor || eaectve Ste DCEO any ] Respective DECO or By apis a ew | & | Speratons Manage: 4 | Nebmtesderier eed yee |

You might also like