LINES, DUMP LINES. RIG DOWN 100%, RIG MOVE 75%, RIG UP 30%.

REMARKS: - WELL OBJECTIVES:


BURGAN SIDETRACK SINGLE INJECTOR - GC-22 - WELL PROFILE: BG-BG-SI-CA-J-ST1-PKR - RKB TO GL
30.60' - RIG RELEASED FROM FROM BG-1919 ON 21ST OF APRIL 2022 AT 16:00 HRS TO WELL BG-
1922. - DISTANCE FROM BG#1922 TO AHMADI HOSPITAL (KOC) - 53 KM & TIME 40 MIN. - DISTANCE
FROM BG#1922 TO ADAN HOSPITAL - 60 KM & TIME 50 MIN. - RELEASE RIG FROM WELL BG-1922 AT
18.00 HRS ON 22ND MAY 2022. - INFORMED 160 ABOUT RIG MOVE AND CENTERED THE RIG.
MOVED 32 LOADS. TOTAL 78 LOADS OUT OF 120. 6.00 NP RIG UP MUD SYSTEM, WATER TANKS,
WATER LINES, DUMP LINES. 6.00 NP CONTINUE RIG UP MUD SYSTEM, WATER TANKS, WATER

33

AND CENTERED THE RIG. MOVED 32 LOADS. TOTAL 78 LOADS OUT OF 120. 6.00 NP RIG UP MUD
SYSTEM, WATER TANKS, WATER LINES, DUMP LINES. 6.00 NP CONTINUE RIG UP MUD SYSTEM,
WATER TANKS, WATER LINES, DUMP LINES. RIG DOWN 100%, RIG MOVE 75%, RIG UP 30%.
REMARKS: - WELL OBJECTIVES: BURGAN SIDETRACK SINGLE INJECTOR - GC-22 - WELL PROFILE: BG-
BG-SI-CA-J-ST1-PKR - RKB TO GL 30.60' - RIG RELEASED FROM FROM BG-1919 ON 21ST OF APRIL
2022 AT 16:00 HRS TO WELL BG-1922. - DISTANCE FROM BG#1922 TO AHMADI HOSPITAL (KOC) - 53
KM & TIME 40 MIN. - DISTANCE FROM BG#1922 TO ADAN HOSPITAL - 60 KM & TIME 50 MIN. -
RELEASE RIG FROM WELL BG-1922 AT 18.00 HRS ON 22ND MAY 2022. - INFORMED 160 ABOUT RIG
MOVE

AND CENTERED THE RIG. MOVED 32 LOADS. TOTAL 78 LOADS OUT OF 120. 6.00 NP RIG UP MUD
SYSTEM, WATER TANKS, WATER LINES, DUMP LINES. 6.00 NP CONTINUE RIG UP MUD SYSTEM,
WATER TANKS, WATER