You are on page 1of 1

SPUD DATE PB TMDRIG RELEASE FROM CURRENT LOC 15/10/1994 00:00 BIT HYDRAULICS BIT # SIZE

MODEL JET SIZE DEPTH IN DEPTH OUT FTG HOURS FPH SER NO. MANUFACTURER RPM WOB I O D L
B G O R PSI LINER SPM GPM P.HHP B.HHP TORQ N. VEL A. VEL (DC/HW/DP) DRILL STRING DATA CUM
ROTATING HRS 0.00 BHA LENGTH BHA HRS SS JAR DRILLING BHA PROFILE Critical Angle 41-65 Deg
STRING WT UP STRING WT DN STAB POS DRILLING FLUID DATA MUD WT. VIS WL CAKE SD OIL PH PV
YP GEL PF SOLID CA CHLOR ECD 9.00 8.20 // 800 70,800 TOTAL VOLUME 24 HR. LOSSES HOLE HOLE
PITS SURFACE RESERVE DUMP 0.0 bbl 1,785.00 bbl 0.00 bbl 0.0 bbl 0.00 bbl 1,750.0 bbl 35.0 bbl
WELL DATA F.I.T. EQUIVALENT TO LAST CSG HRS OTHER NEXT CSG HRS TRIPS PRESSURE V E @ @
WITH FT 24 HRS TD YEST 0.00 0.00 24.00 @ @ HRS DRILL @ LAST CSG @ D @ TD TODAY HRS P/NP
OPERATIONAL DISTRIBUTION 1.00 P PICK UP LANDING JOINT AND MAKE UP ON TUBING HANGER -
TUBING LONG. UNSET TUBING HGR AND 9 5/8" SINGLE PACKER WITH 60 KLBS STRING WEIGHT. 0.50
P CIRCULATE 300GPM 135PSI WITH NO RETURN. 2.50 P WHILE CIRCULATION @ 300 GPM, 1350 STKS
TOTAL, 160 BBLS PUMPED, OBSERVED RETURN ON SHAKERS AND INCREASED FLOW FROM FLOW
LINE. SHUT IN THE WELL. CLOSED ANNULAR BOP. RECORDED SICP - ZERO. CIRCULATE THROUGH
CHOKE MANIFOLD W/ 100 GPM, 35 PSI W/ 8.8 PPG MUD WITH NO RETURN. MEANWHILE MIX 9.0
PPG BRINE. 1.50 P DISPLACE WELL W/ 9.0 PPG BRINE 440 BBLS W/ NO RETURN. 5.00 P BULLHEAD
620 BBLS OF 9.0 PPG BRINE W/ 100 BPH @ 300 PSI 0.50 P CIRCULATE THROUGH TUBING VOLUME
40 BBLS, 200 GPM, 40 PSI. 0.50 P MONITOR THE WELL, LEVEL NOT VISIBLE. 6.50 P POOH 75 SINGLE
OF 3 1/2" TBG COMPLETION STRING F/4474' TO 2171'. * FILL ANNULUS W/ 25 BBLS BRINE EVERY
HALF HOUR. 3.00 P POOH 41 SINGLE OF 3 1/2" TBG COMPLETION STRING F/2171' TO 914'. * FILL
ANNULUS W/ 25 BBLS BRINE EVERY HALF HOUR. 1.50 P POOH AND L/D COMPLETION STRING BHA 3
1/2" SSD ,3 1/2" PUP JOINT 9 5/8" MECHANICAL PACKER, 3 1/2" TBG, 3 1/2" SSD, 3 1/2" TBG &
LANDING NIPPLE F/914' TO 811'. * FILL ANNULUS W/ 25 BBLS BRINE EVERY HALF HOUR. HRS P/NP
OPERATIONAL DISTRIBUTION 1.50 P POOH 12 SINGLE OF 3 1/2" TBG COMPLETION STRING F/811' TO
440 '. * FILL ANNULUS W/ 25 BBLS BRINE EVERY HALF HOUR. REMARKS: - WELL OBJECTIVES:
BURGAN SIDETRACK SINGLE INJECTOR - GC-22 - WELL PROFILE: BG-BG-SI-CA-J-ST1-PKR - RKB TO GL
30.60' - RIG RELEASED FROM FROM BG-1919 ON 21ST OF APRIL 2022 AT 16:00 HRS TO WELL BG-
1922. - DISTANCE FROM BG#1922 TO AHMADI HOSPITAL (KOC) - 53 KM & TIME 40 MIN. - DISTANCE
FROM BG#1922 TO ADAN HOSPITAL - 60 KM & TIME 50 MIN. - RELEASE RIG FROM WELL BG-1922 AT
18.00 HRS ON 22ND MAY 2022. - INFORMED 160 ABOUT RIG MOVE - RIG MOVE COMPLETED ON
29TH OF MAY 2022 @ 17:00 - MAIN CAMP MOVE ON 30TH OF MAY 2022 - RIG ACCEPTED ON
LOCATION AH-0099ST ON 02ND OF JUNE 2022 @ 15:00 HRS NEXT LOCATION BG-1970 0% % READY
TELEPHONE RIG CREW 71 FORMATION TOP AVG ROP 0.0 ft/hr RIG SUPERVISOR TOMASZ WIGLUSZ /
SHAILENDRA JHA BOP TESTED TO 5,000.00 psi ON 6/4/2022 RETURNS KOC TEAM LEADER NASER AL-
BARAZI DAILY BOP DRL CREWS SINCE LTA 715.00 REPORTED ACCIDENT DRL. ENGR./ SNR. DRL. ENG.

You might also like