You are on page 1of 1

D&WO Team X WELL NO.

TD/TARGET RIG EST DAYS DD MO YR DAY # 0600 DEPTH PRESENT ACTIVITY


AH-0099 4,606.0 ft/Burgan BWD-160 28 25 5 2022 WAIT FOR DAYLIGHT SPUD DATE PB TMDRIG
RELEASE FROM CURRENT LOC 15/10/1994 00:00 BIT HYDRAULICS BIT # SIZE MODEL JET SIZE DEPTH
IN DEPTH OUT FTG HOURS FPH SER NO. MANUFACTURER RPM WOB I O D L B G O R PSI LINER SPM
GPM P.HHP B.HHP TORQ N. VEL A. VEL (DC/HW/DP) DRILL STRING DATA CUM ROTATING HRS 0.00
BHA LENGTH BHA HRS SS JAR DRILLING BHA PROFILE STRING WT UP STRING WT DN STAB POS
DRILLING FLUID DATA MUD WT. VIS WL CAKE SD OIL PH PV YP GEL PF SOLID CA CHLOR ECD // TOTAL
VOLUME 24 HR. LOSSES HOLE HOLE PITS SURFACE RESERVE DUMP 0.0 bbl 0.00 bbl 0.00 bbl 0.0 bbl
0.00 bbl WELL DATA F.I.T. EQUIVALENT TO LAST CSG HRS OTHER NEXT CSG HRS TRIPS PRESSURE V E
@ @ WITH FT 24 HRS TD YEST 0.00 0.00 24.00 @ @ HRS DRILL @ LAST CSG @ D @ TD TODAY HRS
P/NP OPERATIONAL DISTRIBUTION 7.00 P SECURED CABLE TRAYS, TDS, RIG FLOOR. LOWERED

D&WO Team X WELL NO. TD/TARGET RIG EST DAYS DD MO YR DAY # 0600 DEPTH PRESENT ACTIVITY
AH-0099 4,606.0 ft/Burgan BWD-160 28 25 5 2022 WAIT FOR DAYLIGHT SPUD DATE PB TMDRIG
RELEASE FROM CURRENT LOC 15/10/1994 00:00 BIT HYDRAULICS BIT # SIZE MODEL JET SIZE DEPTH
IN DEPTH OUT FTG HOURS FPH SER NO. MANUFACTURER RPM WOB I O D L B G O R PSI LINER SPM
GPM P.HHP B.HHP TORQ N. VEL A. VEL (DC/HW/DP) DRILL STRING DATA CUM ROTATING HRS 0.00
BHA LENGTH BHA HRS SS JAR DRILLING BHA PROFILE STRING WT UP STRING WT DN STAB POS
DRILLING FLUID DATA MUD WT. VIS WL CAKE SD OIL PH PV YP GEL PF SOLID CA CHLOR ECD // TOTAL
VOLUME 24 HR. LOSSES HOLE HOLE PITS SURFACE RESERVE DUMP 0.0 bbl 0.00 bbl 0.00 bbl 0.0 bbl
0.00 bbl WELL DATA F.I.T. EQUIVALENT TO LAST CSG HRS OTHER NEXT CSG HRS TRIPS PRESSURE V E
@ @ WITH FT 24 HRS TD YEST 0.00 0.00 24.00 @ @ HRS DRILL @ LAST CSG @ D @ TD TODAY HRS
P/NP OPERATIONAL DISTRIBUTION 7.00 P SECURED CABLE TRAYS, TDS, RIG FLOOR. LOWERED

You might also like